Loading...
HomeMy WebLinkAbout25-Water Service Length Departure MemoMEMORANDUM PAGE 1 OF 2 FEBRUARY 2025 MEMORANDUM To: City of Bozeman Community Development From: Sanbell Date: February 7, 2025 Reference: Mill Building Sewer and Water Design Report SITE NARRATIVE The purpose of this memorandum is to formally request a departure from the maximum water service length in the BMC 38.410.070.B.2 and summarize the available pressure at the proposed Mill building given the demand calculation assumptions of the proposed domestic water service. The domestic water service line will connect to the existing 6-inch water main in East Cottonwood Street. WATER Our team requests a departure from the UDC’s maximum service line length from the water main to the structure. Due to the renovation of the existing Mill building and an effort to retain the usable existing space as much as possible, we are proposing extending the water service to the northern extent of the proposed building expansion to the existing structure. The code maximum water service length is 150-feet. We are proposing a 3/4-inch diameter water service length of 170- feet. The pressure provided by the existing water main is approximately 144 psi. The pressure loss through the approximately 170-feet of new 3/4-inch domestic service is approximately 46 psi, resulting in an expected pressure available at the building of 98 psi. As proposed, from a hydraulic capacity standpoint, the expected pressure is more than adequate to service the building. Refer to the Sewer and Water Design report for additional information and Appendix A of this memorandum. CONCLUSION Based on the assumptions provided above, the 3/4-inch water service installation will provide the MEMORANDUM PAGE 2 OF 2 FEBRUARY 2025 required capacity for the proposed Mill building renovation and expansion. Please contact Bobby Egeberg, PE for any questions pertaining to this memorandum by email, begeberg@sanbell.com or by phone 406-922-4308. Appendices Appendix A – Hydraulic Model Results MILL BUILDING RENOVATION Project # 06020.12 APPENDIX A HYDRAULIC MODEL RESULTS