Loading...
HomeMy WebLinkAbout04-Mill Bldg Reno INF ResponsesMINARIK ARCHITECTURE Inc. 6 1 8 N W a l l a c e , B o z e m a n M T 5 9 7 1 5 M I N A R I K A R C H . CO M 9 7 1 3 1 9 6 2 4 9 10.16.2024 1 of 1 Memorandum Date: October 15, 2024 To: Jacob Doesschate, COB Development Review Coordinator CC: Submitted By: Doug Minarik, Minarik Architecture Re: INF Responses Reference Attached Plan Review – Comments Report 1. See Architectural Site Plan for Apparatus Turn-Around on North Lot A1 2. Noted 3. Noted 4. Noted, the project will pursue Concurrent Construction 5. Noted, single developer + GC will be required for Concurrent Construction 6. Noted 7. See included peak-hour sanitary sewer demand report 8. Noted 9. Noted 10. A groundwater report is completed and will be included with the site plan. 11. Noted 12. Noted 13. An updated letter from the utility company will be provided allowing the relocated sidewalk to overlap with the 10’ utility easement.. 14. Reference document “Tinworks Lot A1 Review Thresholds” 15. Reference site plan narrative and scoping document. 16. Noted. 17. Noted, the project will be submitted for building permit and comply with all current building and energy codes.. 18. Reference document “Tinworks Lot A1 Review Thresholds” 19. Noted 20. Noted