Loading...
HomeMy WebLinkAbout03-Mill Bldg Reno Project Narrative Site Plan Submission UPDATED February 7th, 2025 Bozeman, MT p. 1minarik architecture, inc. 2025 | 971 319 6249 | minarikarch.com mill building renovation | site plan review | 02/07/2025 p. 2minarik architecture, inc. 2025 | 971 319 6249 | minarikarch.com mill building renovation | site plan review | 02/07/2025 provides year-round opportunities for the non-profit Tinworks Art community space, adding non-profit cultural, gathering and exhibition spaces, restrooms and supporting storage space. It is a careful insertion into an existing neighborhood landscape and fabric that is unique in character. The expired uses are preserved in their form, materiality, openings and spaces between, all contributing to the character and memory of place. The site does not fit within a specific template of development. If forced to align to a prescriptive template via zoning or block frontage guidelines, the character and memory of the place risks being lost. Rather, the project is a response to the very specific design elements of the neighborhood closely following the intent and purpose of the Neighborhood Conservation Overlay District (NCOD) outlined in Section 38.340.010, 1,2,3,4,5. It is designed to honor the history, but infuse new vitality into the neighborhood with uses better aligned to the changing economic patterns and needs of the community. NEIGHBORHOOD CHARACTER The site is in the middle of the Northeast Historic Mixed-Use District (NEHMU). By definition the intent of the NEHMU is to "provide recognition of an area that has developed with a blend of uses not commonly seen under typical zoning requirements." The functional requirements for loading, storing and distributing agricultural products informed the scale, form and materiality of the buildings on and directly adjacent to the site. This created function-first and minimally adorned architecture with an emphasis on spaces between buildings. This language is key to informing new experiences that are not overly commercial (downtown streetscape) or overly sanitized, preserving the grit and character of the neighborhood. BUILDING PROGRAM NOTES The Mill Building, was originally a warehouse servicing the adjacent Misco Mill. It is thought that the 17' gap between the Misco Mill and the warehouse was used for loading/unloading grain to railcars on a spur line . The existing building is a single story, approximately 2,000 square feet. As an isolated structure it is historically non-contributing. However the overly-simplistic form, lack of openings, grain elevator, and proximity to Misco Mill are defining patterns and characteristics of the past use. The proposed renovation purposefully does not create any new openings other than required points of entry/exit. Rather, a relic given new life, consistent and honest in form while activating the space within. The Mill Building is structurally compromised. However, the west and partial north/south walls constructed as wood crib walls up to 14' will remain. The concrete slab will also remain. The remaining walls and roof will be re-built in place. To meet energy codes, the entire structure will be wrapped in insulation. Wood siding is detailed to reference the 8' spacing of the crib walls with vertical battens at 8' on center. The existing east clerestory is replaced with new glass. See elevation notes for additional detail. The addition is approximately 1,200 square feet. It extends to the north of the Mill Building with entry defined as a 'dog-trot' or transparent pass-through used to connect the exhibition space with supporting program elements of restroom and storage to make the building code compliant. See elevation notes for additional details. LANDSCAPING All landscaping will comply with the mandatory landscaping provisions of the Bozeman UDC, including the use of drought tolerant plants, the use of appropriately sized landscape plant material, street frontage landscaping, coordination with utilities, and the use of permanent irrigation. All service areas and utility equipment will be screened. Zoning: NEHMU Block Frontage: Mixed-Use Property/Lot Area: 23,000sf / 0.528 acresFAR: N/A (38.320.050) Building Footprint: 3,689sf Lot Coverage: 100% Allowed / 16% Actual Building Height: 50 Feet Allowed / 24'-11" Actual Building Areas: 2,180sf Existing Renovation 2,223sf Addition 4,403sf Total Side and Rear Setback: 3 feet Proposed Use(s): Community Center E Cottonwood * *Entry centrally located to accommodate all entries to the overall Tinworks campus. Allowing the existing Mill Building to remain the prominent streetscape presence, preserving the industrial nature of Northeast Bozeman and it's vernacular, while still approachable in proximity to the Cottonwood frontage and it's foot traffic. p. 3minarik architecture, inc. 2025 | 971 319 6249 | minarikarch.com mill building renovation | site plan review | 02/07/2025 38.340.010 Neighborhood Conservation Overlay and Historic Preservation (NCOD)/C The intent and purpose of the conservation designation is to stimulate the restoration and rehabilitation of structures, and all other elements contributing to the character and fabric of established residential neighborhoods and commercial or industrial areas. New construction will be invited and encourage provided primary emphasis is given to the preservation of existing buildings and further provided the design of such new space enhances and contributes to the aesthetic character and function of the property and the surrounding neighborhood or area. The existing building on the property is being refurbished (see project narrative) for the purpose of preserving the character and fabric of the neighborhood. The added space preserves the existing figure/ground relationships adjacent to Cottonwood, preserves valuable open space to the east of the existing building and re-activates the existing space between buildings. . /D In view of the fact that most of the area included within the boundaries of the conservation district was developed and built out prior to the adoption of zoning and contemporary subdivision regulations, the construction, development pattern and range of uses is highly diverse and may not be in compliance with conventional regulatory requirements. This part 1 recognizes that this diversity is a contributing element of the historic character of these neighborhoods or areas. The provisions of this part 1 must be applied in a manner that will encourage the protection and enhancement of the many diverse features for future generations. The proposal prioritizes existing and established neighborhood patterns of form and space, especially between buildings. Current zoning and block frontage patterns would, if followed, deviate from the character of the neighborhood and compromise the integrity of place. For example, they prioritize street frontage and percentage of openings vs the historic spatial arrangement of buildings driven by function. These unique (to today's standards) spatial arrangements are opportunities to engage with space that is more aligned with the historic character of the neighborhood. Specifically, keeping the Mill Building in its current location without a conventional entry allows the focus to shift to the space between buildings and become a contextual experience, aligned with prior site activities. /F. It is further the purpose of the conservation district designation to protect and enhance neighborhoods or areas of significant land planning or architectural character, historic landmarks or other built or natural features for the educational, cultural, economic benefit or enjoyment of citizens of the city. It will be the policy and responsibility of the administrative entities of this part 1 to: 1. Protect, preserve, enhance and regulate historically significant structures, archaeological or cultural sites, and areas that: a. Are reminders of past eras, events or persons important in local, state or national history; The existing structure, although considered non-contributing by the historic review standard, is very much contributing to the form and memory of place. It represents a past use and presents an opportunity to be re-purposed without altering neighborhood fabric and character. If removed, the neighborhood would further be stripped of the reminder of past eras. b. Provide significant examples of land planning or architectural styles, or are landmarks in the history of land planning and architecture; The railroad spur line used for loading and distributing grain helped shape the scale and experience of the in-between spaces. Specifically the 17 foot gap between the Warehouse Building and Misco mill. This is re- purposed as a sculptural garden, celebrating the prior activity that helped shape the neighborhood. Lack of adornment or openings speaks to the functional storage purpose of the building and keeps the focus on the exterior spatial experience. The new functional purposes of the Mill Building do not benefit from glazing. c. Are unique or irreplaceable assets to the city and its neighborhoods; The structurally preserved grain elevator is a memory and asset to the neighborhood’s history as is the re- purposed access point between existing buildings. The ability to walk between large agrarian buildings has all but been removed from the fabric of our downtown. The proposed revitalizes that opportunity. d. Provide examples of physical surroundings in which past generations lived; or e. Represent and express the unique characteristics of small agricultural-based, western city developmental patterns; As noted above, the grain distribution spur lines created space between buildings. The functional requirements for loading, storing and distributing grain informed the scale, form and materiality of the buildings. This created a function-first and minimally adorned architecture. 2. Enhance property values through the stabilization of neighborhoods and areas of the city, increase economic and financial benefits to the city and its inhabitants, and promote tourist trade and interests;Although the agrarian past has expired, the community center creates an opportunity to infuse vitality into the neighborhood and preserve character verses deviating to a use that requires a departure in scale and development patterns. Ultimately the community center allows the core user, Tinworks, to strengthen their mission of providing community-based art and art activities that are specific to the neighborhood and region. 3. Develop and maintain the appropriate environment for buildings, structures, sites and areas that reflect varied planning and architectural styles and distinguished phases of the city's history and prehistory; The placement of the addition and revitalization of the existing buildings maintain the critical open space and density that is synonymous with the neighborhoods past use. Often, when a use has expired, the historical patterns are erased and a new "highest-and-best" use replaces to meet current zoning requirements. Per the stated purpose of the NCOD, the existing character, development patterns and architectural styles are given priority over current zoning and block frontage standards. This is specifically represented in the re-purposing of the existing facade and its lack of adornment. The result shifts the focus from the building to the spaces between. This is a key and critical shift in planning specific to this site in relation to the history. 4. Stimulate an enhancement of human life by developing educational and cultural dimensions, which foster the knowledge of the city's heritage, and cultivate civic pride in the accomplishments of the past; andThis is in perfect alignment to the Tinworks mission and the proposed development patterns. 5. Seek to maintain and enhance the many private and public elements that are unique to the fabric, theme and character of each neighborhood and area, including, but not limited to: lighting, pathways, street trees, natural areas and other features that may, from time to time, be identified by the citizens and property owners' of neighborhoods, areas and subsections thereof. Reference all responses to 1 through 4 above. 38.500.020 Project Design Applicability and Compliance A. Relationship to other codes and documents. Where provisions of this article conflict with provisions in any other section of the UDC, this article prevails unless otherwise noted. Relationship with other notable design provisions and guidelines: 1. However, the review authority may apply the provisions of this article in the event of a conflict, where the review authority determines that the provisions herein help new development better meet the purpose and intent of neighborhood conservation overlay district per section 38.340.010. 38.510 Block Frontage Standards Per 38.500.020 the Block Frontage Standards may be superseded by the provisions of the NCOD. The following diagrams and images annotate compliance with Block Frontage Standards or where provisions of NCOD supersede the Block Frontage Standards. A D 3 4 2 1 B C Property Line 150.09' 10' Public Easement p. 4minarik architecture, inc. 2025 | 971 319 6249 | minarikarch.com mill building renovation | site plan review | 02/07/2025 From 1984 Historic Report 2024 - Current Condition • Building entrances - Building entrances must be visible and directly accessible from the street.• Facade Transparency - at least 25% of the ground floor between 4' and 8' above sidewalk - SEE NEXT PAGE OF THIS DOCUMENT FOR DEPARTURE Block Frontage Entry is addressed via the following design considerations: (1) To honor the historic development patterns and history of the site, the space between buildings, once used for loading railcars is re-activated as a sculptural garden. Building Entry occurs at both the east and west as a transparent pass-through. A through-site pedestrian path extends along the east side of the building The entry experience starts at the property line, to make the most of changing landscape art opportunities. (2) The existing building preserves its simple facade without openings, a nod to its prior use as a warehouse, but more importantly the simple agrarian structure does not detract from the surrounding exhibition spaces and does not compete with the building entry centered on Tinworks campus. EXTERIOR EXHIBITION SPACE EXTERIOR EXHIBITION SPACE Entry Fence EXTERIOR EXHIBITION SPACE PEDESTRIAN ACCESS Proposed Property Line Property Line Property Line p. 5minarik architecture, inc. 2025 | 971 319 6249 | minarikarch.com mill building renovation | site plan review | 02/07/2025 Restrooms Gallery Gallery Restroom Clerestory Existing OpeningProposed as Small Window Preserve Exterior Wall Surface for Exterior Art & Projections Existing OpeningProposed as Small Window Clerestory Gallery EntryTransparentGallery Gallery Upper Storage Existing Opening Proposed as Doors The below illustrates the departure request to deviate from facade transparency due to the specific uses of the building within (Exhibition/Gallery) and the existing and adjacent building precedent. The Exhibition/Gallery spaces cannot have glass without compromising their use. The lap siding proposed is similar in scale to the adjacent Misco Mill. The exterior spaces adjacent to the building are used as exhibition space as well, supported by the building surfaces as blank canvases for rotating art and projected art. Adjacent Building Blank Walls Existing Mill Building EntryTransparent Misco Mill Lap Siding (Left) Proposed Lap Siding (Right) p. 6minarik architecture, inc. 2025 | 971 319 6249 | minarikarch.com mill building renovation | site plan review | 02/07/2025 - Metal Roof - Standing Seam - Zinc Siding Rheinzink PrePatina Graphite Grey B C A A B D South Elevation / E. Cottonwood East Elevation - Wood Lap Siding W/ Battens Lunawood Horizontal WD - Entry Door Vertical WD Planks Wide p. 7minarik architecture, inc. 2025 | 971 319 6249 | minarikarch.com mill building renovation | site plan review | 02/07/2025 'Community Center' 2,380 sf / 200 = 11 spaces TOTAL PARKING DEMAND FOR LOT C1 = 11 Bike Parking 10% of 1 = 1 required / 2 Provided NOTE: A separate application will be submitted as a minor site modification for the adjacent Lot A1 (to the north). The site modification will improve the existing parking lot with striping and wheel stops, in addition to defining the parking demand from Lot A1 and the available spaces to share with Lot C1. A D 3 4 2 1 B C Property Line 150.09' 10' Public Easement Exhibition 2,024 sf Entry Exhibition 356 sf Restrooms (Storage Area Above) p. 8minarik architecture, inc. 2025 | 971 319 6249 | minarikarch.com mill building renovation | site plan review | 02/07/2025 8’ 8’ 8’ 8’ 8’ 8’ that are allowed to patina and age over time informs a humanness and connection between space and visitor. The of a grain elevator offers a relevant and honest precedent for materiality and structural repetition. Creating scales and frames an experience. p. 9minarik architecture, inc. 2025 | 971 319 6249 | minarikarch.com mill building renovation | site plan review | 02/07/2025