HomeMy WebLinkAbout025_Utility Easement Approval LetterG|R|E|C Architects BLOCK A | Tracys Third Addition, Lot 2A, Block A Plat C-18-D
0.37 acre and Lot 3A, Block A, Plat C-18-D 0.72 acre
SPR SUBMITTAL | THE HOTEL BOZEMAN
UTILITY EASEMENT
APPROVAL LETTER
April 2, 2024
Andrew Gault
Homebase Partners
20 North Tracy
Bozeman, MT 59715
Dear Andrew,
The easements that are depicted on Sheet C1.6 “North Central Shallow Utility Plan” dated 3-26-24 by Stahly
Engineering & Associates, Inc. will be adequate for Northwestern Energy to serve the Hotel Bozeman project.
Please contact me if you have any questions or require additional information.
Sincerely,
Tanner Reynolds
Construction Engineer
Tanner.reynolds@northwestern.com
O 406-582-4627
C 406-595-2187
October 28th, 2024
1 Proprietary and Confidential
Andrew Gault
20 North Tracy
Bozeman, MT 59715
Dear Andrew,
The easements that are depicted on Sheet C1.6 “North Central Shallow Utility Plan” dated 3-26-24 by
Stahly Engineering & Associates, Inc. will be adequate for Blackfoot Communications to serve the Hotel
Bozeman project.
Please contact me if you have any questions or require additional information.
Best,
-Jared
Jared Schmit
Sr. Account Executive
T: 406-541-5175
M: 406-880-5175
blackfootcommunications.com
Connect with us: Facebook | X | LinkedIn | Instagram | YouTube
Blackfoot Communications | 1221 N Russell St. | Missoula, MT 59808
Robert Hofstad
Lumen Technologies
48 Pronghorn Trail, Bozeman, MT 59718
(406) 589-4436 Robert.Hofstad@Lumen.com
10/28/24
Andrew Gault
Homebase Partners
111 W. Lamme Street, Suite 101
Bozeman, MT 59715
Andrew,
I acknowledge and approve the easement plan on sheet C1.6, North Central Shallow Utility Plan, dated
3-26-24 by Stahly Engineering & Associates, Inc. for Lumen to serve the Hotel Bozeman project.
Please contact me if you have any questions or require additional information.
BUILDING 3-3BUILDING 3-2BUILDING 3-1THE IVES(BUILDING 4)BUILDING 3-5ONE 11 2.0 BUILDINGRESIDENCES(AKA MOUNTAINVIEW WEST)ONE 11 (EXISTING)HOTEL BOZEMAN(AKA MOUNTAINVIEW EAST)THE HENRY(BLDG 3-4)PROFESSIONALENGINEERS &SURVEYORSNORTH CENTRAL
MASTER SITE PLAN STAHLYENGINEERING& ASSOCIATESWHI
BOZEMAN, MONTANAC1.6NORTH CENTRALSHALLOWUTILITY PLAN