HomeMy WebLinkAbout004_Site Plan ChecklistG|R|E|C Architects BLOCK A | Tracys Third Addition, Lot 2A, Block A Plat C-18-D
0.37 acre and Lot 3A, Block A, Plat C-18-D 0.72 acre
SPR SUBMITTAL | THE HOTEL BOZEMAN
SITE PLAN CHECKLIST
G|R|E|C Architects BLOCK A | Tracys Third Addition, Lot 2A, Block A Plat C-18-D
0.37 acre and Lot 3A, Block A, Plat C-18-D 0.72 acre
SPR SUBMITTAL | THE HOTEL BOZEMAN
SITE PLAN CHECKLIST
THE HOTEL BOZEMAN | BLOCK A
REVISED 01/26/2024
CHECKLIST ITEMS APPLICANT RESPONSE
DIGITAL SUBMITTALS & NAMING PROTOCOL
1 Create and submit a Planning application using the ProjectDox portal.
a. After completing your Development Review Application, you will
receive a Notification Letter (example) via email. Please download this
document and obtain owner’s signature. Upload as a PDF to the
“Documents” folder in ProjectDox.
Application package follows specified standards
2 The digital copies must be separated into two categories: Documents
and Drawings.
a. The Documents folder should include items such as application forms,
narrative, response to City comments, supplemental documents,
technical reports, easements, legal documents, etc.
b. The Drawings folder should include items such as site plans, civil
plans, landscape plans, photometric plans, elevations, etc. All drawing
files must be drawn and formatted for a 24” x 36” sheet file or 11” x 17”
sheet file. Plan pages shall be properly oriented in landscape mode.
Refer to our Quick Guide for additional information;
Application package follows specified standards
3 Naming protocol. All files should be numbered and named according to
their order listed on your provided Submittal Checklist.
File names should start with a numeric value followed by the document
name. The numeric value at the beginning of the file
name ensures the order in which they are displayed. Refer to our Quick
Guide for additional information;
Application package follows specified standards
APPLICATION SET
1 Create and submit a Planning application using the ProjectDox portal Planning Application Submitted via ProjectDox
2 Project narrative describing the project type, proposed use scope, size
(dwellings, building size(s), building height(s), number
of buildings, number of total parking spaces) intent, and phasing, if applicable. The narrative must include a response to the
City’s conceptual review comments. If requesting a waiver from
conceptual review, a letter from the director must be included.
Refer to Project Narrative
3 Noticing Checklist Form N1 and materials. Refer to N1 and Materials in application
4 For departures, a departure narrative must be provided stating which
Section(s) of the Bozeman Municipal Code are proposed for departure,
the scope and extent of the proposed departure(s) and a response to the
required departure criteria. A summary and response to the criteria must
be provided for each departure.
a. Project applicants must successfully demonstrate to the review
authority how the proposed departure meets the purpose(s) of the
standard and other applicable departure criteria that apply to the specific
standard.
b. Either through a separate exhibit of departure request within the
narrative or through a site plan or building elevation, clearly show any
proposed departure related to the request. Ensure that the separate
sheet number is referenced in the departure narrative
Refer to submitted departure request exhibit
CONTINUES ON FOLLOWING PAGE
G|R|E|C Architects BLOCK A | Tracys Third Addition, Lot 2A, Block A Plat C-18-D
0.37 acre and Lot 3A, Block A, Plat C-18-D 0.72 acre
SPR SUBMITTAL | THE HOTEL BOZEMAN
SITE PLAN CHECKLIST
THE HOTEL BOZEMAN | BLOCK A
REVISED 01/26/2024
CHECKLIST ITEMS APPLICANT RESPONSE
5 Traffic study. Street, traffic, and access information required in Section
38.220.060.A.11, BMC or a waiver, in writing, from the
Engineering Division that the requirement is waived prior to application
submittal.
Refer to Traffic Study in application
6 Water rights information. If cash-in-lieu is proposed a cash-in-lieu of
water rights calculation and payment amount certified by
the City’s Engineering Division.
Project will proceed with Cash-In-Lieu.
7 If water wells are proposed, a letter is required from the Montana
Department of Natural Resources and Conservation
confirming their intent to issue a permit or exemption.
N/A
8 Stormwater Design Report.Refer to Civil Engineering report
9 Digital copy(ies) of most current plat and existing easements if recorded separately from the plat. Refer to Amended Subdivision Plat
10 If Concurrent Construction is requested. Concurrent Construction must
be requested at time of Site Plan application per
Section 38.270.030, BMC. For Site Plans requiring public infrastructure
extensions or upgrades on site or directly adjacent to
site use CCON checklist. For Site Plans requiring off-site public
infrastructure improvements use CCOFF Checklist.
CCON Requested
11 If the property is located within the Neighborhood Conservation Overlay
District (NCOD), include Commercial Certificate of Appropriateness
(CCOA) or Demolition (DEM) applications and required materials.
a. You may only apply for deviations in conjunction with a development
proposal. Standards and criteria for deviations are contained in Section
38.340, BMC. i. Either through a site plan or separate exhibit, clearly show any
proposed deviations related to site requirements such as
yards/setbacks, lot coverage, parking or other applicable standards.
Ensure that the separate sheet number is referenced if it is within the
plan sheet.
ii. Either through the building elevation or separate exhibit clearly show
any proposed deviations related to building construction such as height,
second story additions, or other applicable standards.
Refer to CCOA Checklist in application package
PLAN SHEETSGENERAL PLAN REQUIREMENTS FOR
EACH PLAN SHEET LISTED BELOW
1 Use a conventional scale such as 1:20 or 1/4:1.Application complies with requirements
2 Plans/drawings must not contain disclaimers such as “Not to Scale” or
“Preliminary” and “Not for Construction”.
Application complies with requirements
3 Boundary line of property with dimensions annotated on plans/drawings.
Ensure lot line is shown in a heavy, solid line.
Application complies with requirements
4 Title Box Requirements: drawing name, sheet name, date. If new sheets
are updated or revised, a new date must be applied to
the sheet.
Application complies with requirements
5 Legend Application complies with requirements6Compass rose or an arrow indicating which direction is north.Application complies with requirements
7 Building location. Application complies with requirements
8 Ingress and egress points. Application complies with requirements
9 Approximate centerlines of existing watercourses, required watercourse
setbacks, and the location of any 100-year floodplain
Application complies with requirements
10 The approximate location of significant drainage features. Application complies with requirements
CONTINUES ON FOLLOWING PAGE
G|R|E|C Architects BLOCK A | Tracys Third Addition, Lot 2A, Block A Plat C-18-D
0.37 acre and Lot 3A, Block A, Plat C-18-D 0.72 acre
SPR SUBMITTAL | THE HOTEL BOZEMAN
SITE PLAN CHECKLIST
THE HOTEL BOZEMAN | BLOCK A
REVISED 01/26/2024
CHECKLIST ITEMS APPLICANT RESPONSE
11 The location and size of existing and proposed streets and alleys, utility
easements, utility lines, driveways and sidewalks on the
lot and/or adjacent to the lot.
Application complies with requirements
12 Location and extent of street vision triangles extended to the center of
the right-of-way including adjacent street intersections
and all alley and driveway access points.
Application complies with requirements
13 Location and extent of snow storage areas. Application complies with requirements14Fire lanes and signage. Application complies with requirements
15 Location of trash enclosures. Application complies with requirements
16 Phasing lines as applicable.N/ACOVER SHEET REQUIREMENTS
1 Name of project/development Refer to drawing A.000 Cover Sheet
2 Name and mailing address of developer and owner. Refer to drawing A.000 Cover Sheet3 Name and mailing address of applicant team (i.e. engineer, architect,
planner, landscape architect, etc.)
Refer to drawing A.000 Cover Sheet
4 Location of project/development by street address and legal description. Refer to drawing A.000 Cover Sheet
5 Location/vicinity map, including the area within one-half mile of the site and zoning labeled.
Refer to drawing A.000 Cover Sheet
6 Legal Description with metes and bounds format; include the lot, block
and subdivision name.
Refer to drawing A.000 Cover Sheet
7 Table of contents. If revisions are required, the title sheet and table of
contents must be updated to reflect all revised sheets with new dates.
Refer to drawing A.000 Cover Sheet
8 Parcel and site coverage information:
a. Zoning district, community plan designation
b. Parcel size(s) in gross acres and square feet c. Parking table, how much is required and how much is provided
d. Open space calculations (if applicable)
e. Parkland requirements (if applicable). See parkland requirements below.
f. Density and floor area ratio breakdown. If residential, must be
presented as net residential density.
g. Location, percentage of parcel and total site, and square footage for
the following:
i. Existing and proposed buildings and structures
ii. Driveway circulation and parking areas
iii. Semipublic land areas such as recreational, open space, and
landscape areas
iv. Public street right-of-way
Refer to drawing A.000 Cover Sheet
9 Location of City limit boundaries, and boundaries of Gallatin County’s
Bozeman Area Zoning Jurisdiction, within or near the
development.
N/A
10 ADA certification block that states acknowledgment of State and Local
Accessibility requirements. Can be placed under General Notes on the cover sheet.
Refer to drawing A.000 Cover Sheet
GENERAL CIVIL PLAN
The general civil plan and utility plan can be combined as long as the
plans are not overly congested. The grading and drainage
plan must be its own separate plan sheet.
Refer to drawing C1.1 Civil Site plan
1 Overall plan with no contours. Sheet must be stamped and signed by a
licensed Montana Professional Engineer.
Refer to drawing C1.1 Civil Site plan
CONTINUES ON FOLLOWING PAGE
G|R|E|C Architects BLOCK A | Tracys Third Addition, Lot 2A, Block A Plat C-18-D
0.37 acre and Lot 3A, Block A, Plat C-18-D 0.72 acre
SPR SUBMITTAL | THE HOTEL BOZEMAN
SITE PLAN CHECKLIST
THE HOTEL BOZEMAN | BLOCK A
REVISED 01/26/2024
CHECKLIST ITEMS APPLICANT RESPONSE
2 Surface retention/detention pond perimeters labeled. N/A
3 Street and site lighting. Refer to drawing C1.1 Civil Site plan and E1.1.24 Adjacent streets to a distance of 150 feet, except for sites adjacent to
major arterial streets where the distances shall be 200 feet. Include full width of the street with curb, gutter, sidewalk, drive approaches,
intersections and street lighting on both sides of the street.
Refer to drawing C1.1 Civil Site plan
5 Traffic flow on and off site. Refer to drawing C1.1 Civil Site plan
6 Construction route map showing construction entrance location and how
materials and heavy equipment will travel to and from the site.
Refer to drawing CM.100
7 Construction management plan including exterior construction period
material staging, spoils location and construction trash
enclosure location(s). A trash container type must be provided and detailed (40 yard roll off, fenced enclosure, etc.). If spoils
storage is proposed a timeline for removal must be provided.
Refer to drawing CM.100
UTILITY PLAN
1 Utility and utility right-of-way and easements, existing and proposed with
plat book and document numbers. Include:
a. Electric
b. Natural gas
c. Telephone, cable, optic fiber and similar utilities
d. Water mains and services, including fire services
e. Sanitary sewer
f. Storm sewer
Refer to drawing C1.1 Civil Site plan
2 Existing utilities and connections to be abandoned and/or removed
(water and sewer).
Refer to drawing C1.0 Existing Conditions Plan
3 Fire hydrant locations. Refer to drawing C1.1 Civil Site plan 4 Size, location and material type of existing and proposed sewer, water
and storm drain pipe.
Refer to drawing C1.0 and C1.1
5 Proposed water meter location and size.Refer to drawing C1.1 Civil Site plan 6 Above ground utilities including poles, cabinets, boxes, manholes,
pullboxes, etc.
Refer to drawing C1.1 Civil Site plan
7 Show and label required grease and/or sand/oil interceptors. Refer to drawing C1.1 Civil Site plan
8 Show and label the location(s) of proposed gas and electric meters per
standards.
Refer to drawing C1.1 Civil Site plan and A.003
9 Dimensional mechanical rooms to verify water service lay lengths meet
minimum requirements.
Refer to drawing A.101
GRADING AND DRAINAGE PLAN
1 Topographic contours at a minimum internal of 2 feet, or as determined
by the Director. Include sufficient spot elevations and slope arrows.
Refer to drawing C4.0 and C4.1
2 On-site retention/detention location, include size, volume and relevant
elevations
Refer to drawing C4.0 and C4.1
3 Invert elevations for all stormwater conveyance infrastructure including
pipes, control structure, overflows, curb chase, etc.
Refer to drawing C4.0 and C4.1
4 Water quality improvement facilities. N/A
5 Surface stormwater facilities must demonstrate compliance with Section
38.410.080, BMC including cross sections for each facility.
Refer to drawing C4.0 and C4.1
6 Significant rock outcroppings, slopes of greater than 15 percent or other
significant topographic features.
N/A
CONTINUES ON FOLLOWING PAGE
G|R|E|C Architects BLOCK A | Tracys Third Addition, Lot 2A, Block A Plat C-18-D
0.37 acre and Lot 3A, Block A, Plat C-18-D 0.72 acre
SPR SUBMITTAL | THE HOTEL BOZEMAN
SITE PLAN CHECKLIST
THE HOTEL BOZEMAN | BLOCK A
REVISED 01/26/2024
CHECKLIST ITEMS APPLICANT RESPONSE
7 Designate drainage and waterway related items, including all drainage
ways, streets, arroyos, dry gullies, diversion ditches, spillways,
reservoirs, etc. which may be incorporated into the storm drainage
system. Include the name of the drainage way (where appropriate), the
downstream conditions, and any downstream restrictions.
Refer to drawing C4.0 Grading and Surfacing Plan
8 Surface water, including:
a. Ponds, streams and irrigation ditches (include classifications based
upon a determination of the Gallatin Conservation District; note
classification of each feature on plans). b. Watercourses, water bodies and wetlands (include classifications
based upon a determination of the Gallatin Conservation District, Army
Corps of Engineers, or Wetland Delineation Report; note classification of each feature on plans). Include dimensions of watercourse setbacks
including Zones 1 and 2.
c. Floodplains as designated on the Federal Insurance Rate Map or that
may otherwise be identified as lying within a 100 year floodplain through
additional floodplain delineation, engineering analysis, topographic
survey or other objective and factual basis.
d. The flood hazard area(s) as identified with a floodplain analysis report
in compliance with Article 6, BMC, if required.
N/A
SITE PLAN
1 The location, identification and dimensions of existing and proposed
data, on-site and to a distance of 100 feet (200 feet for Planned Unit
Developments) outside the site boundary, exclusive of public rights-of-way.
Refer to drawing C1.1
2 Block frontage classification per Section 38.510, BMC.Refer to drawing A.001 and Elevations A.200-203
3 Setbacks, building footprint and any proposed encroachments. Any
setback or property line encroachments must be clearly shown and
noted with encroachment type (i.e. awning, weather protection,
cantilever, lighting, eave, etc).
Refer to drawing A.003
4 Sidewalks, walkways, driveways, crosswalks, loading areas and docks,
bikeways, including typical details and interrelationships with vehicular
circulation system, indicating proposed treatment of points of conflict.
Refer to drawing A.003 and C1.1
5 Parking facilities:
a. Circulation aisles and dimensions
b. Parking spaces and dimensions (ADA, compact, motorcycle, etc.)
c. Number of parking spaces, existing and proposed, and total square footage of each
d. On-street parking spaces and dimensions
e. Bicycle parking, existing and proposed, and its location
Refer to drawing A.002 for street and bike parking. All
vehicle parking to be off-site.
6 If applicable, identify historic, cultural and archaeological resources.
Describe and map any designated historic structures or districts, and archaeological or cultural sites.
N/A
7 Identify any major public facilities, including schools, parks, shared use
pathways, trails, etc. located adjacent to the site.
N/A
CONTINUES ON FOLLOWING PAGE
G|R|E|C Architects BLOCK A | Tracys Third Addition, Lot 2A, Block A Plat C-18-D
0.37 acre and Lot 3A, Block A, Plat C-18-D 0.72 acre
SPR SUBMITTAL | THE HOTEL BOZEMAN
SITE PLAN CHECKLIST
THE HOTEL BOZEMAN | BLOCK A
REVISED 01/26/2024
CHECKLIST ITEMS APPLICANT RESPONSE
8 Location of open space with dimensions. Ensure to show open space
amenities as referenced in 38.520.060
Refer to drawings A.001 and A.101-A.107
9 Location of cluster mailboxes (in coordination with the United States
Postal Service).
Refer to drawing A.101
BUILDING DESIGN AND SIGNAGE
1 Front, rear and side elevations of all buildings, structures, fences and
walls with height dimensions and roof pitches. Show open stairways,
exterior lighting, weather protection, awnings, parapet walls, mechanical
equipment and other projections from exterior building walls. Building
elevations must include proposed exterior building materials, windows
and doors including a color and material palette for all proposed features
keyed to the building elevations.
Refer to drawings A.200-A.204
2 Provide transparency calculations for any elevation that faces a street
and is a block frontage. Provide minimum and maximum height of
transparency from grade. Provide area of transparency and percentage
in relation to the total facade.
Refer to drawings A.200-A.203
3 Provide elevations, cross sections and details of all ground mounted and
rooftop mechanical screening. Include meter banks
for utilities on elevations. 4 Floor plans that include all floors and roof plan. Annotate/designate uses
for all rooms and areas. A seating/serving area layout is required for all restaurants
Refer to drawings A.001 and A.101-A.107
5 Color and Material Palette
a. Color and material palettes are required for all new buildings and
structures. A color and material palette must include all
the proposed exterior building materials for all structures and site details.
b. The exterior building materials must include all siding, trim, roofing,
windows, stairways, doors, balconies, railings,
storefront, glass/glazing, walls, mechanical screening, trash enclosures,
accessory equipment enclosures (generator, etc.),
awnings and other architectural elements.
c. Each material must be keyed to the building elevations.
d. Color perspectives that depict the building accurately and with the proposed building materials are encouraged to be
submitted with each application. The color perspective does not satisfy
the color and materials palette requirement. e. There may be instances where a physical material sample must be
provided for larger more complex projects. This will be
assessed at formal acceptance of the application.
Refer to drawing A.204 and building elevations A.200-
A.204
6 Exterior signs if applicable. Include building frontage dimension(s) and
maximum sign area calculation, provide sign dimensions
and square footage of each. Note — The review of signs in conjunction
with this application is only review for sign area
compliance with Section 38.560, BMC (Signs). A sign permit must be
obtained from the Building Division prior to erection
of any and all signs, additional design guidelines apply for signs within
zoning overlay districts.
Refer to drawings A.200-A.203
CONTINUES ON FOLLOWING PAGE
G|R|E|C Architects BLOCK A | Tracys Third Addition, Lot 2A, Block A Plat C-18-D
0.37 acre and Lot 3A, Block A, Plat C-18-D 0.72 acre
SPR SUBMITTAL | THE HOTEL BOZEMAN
SITE PLAN CHECKLIST
THE HOTEL BOZEMAN | BLOCK A
REVISED 01/26/2024
CHECKLIST ITEMS APPLICANT RESPONSE
LANDSCAPE PLAN
1 Plan preparer must be: a state registered landscape architect; an individual with a degree in landscape design and two years of
professional design experience in the state; or an individual with a
degree in a related field (horticulture, botany, plant science,
etc.) and at least five years of professional landscape design experience,
of which two years have been in the state.
Application complies with requirements
2 Existing and proposed grade that complies with maximum allowable
slope and grade.
Refer to drawing C4.0 and L200
3 Complete landscape legend providing a description of plant materials
shown on the plan, including typical symbols, names
(common, botanical, and cultivar names), locations, quantities, container
or caliper sizes at installation, heights, spread and
spacing and identification of drought tolerant and/or native and adapted
species. The location and type of all existing trees on
the lot over 2.5 inches in caliper must be specifically indicated.
Refer to drawing L001 for full planting legends. For
planting plans refer to drawings L300-L304.
4 Size of planting at the time of installation and at maturity.
5 Complete illustration of landscaping and screening to be provided in or
near off-street parking and loading areas, including
information as to the amount (in square feet) of landscape area to be
provided internal to parking areas and the number and
location of required off-street parking and loading spaces.
N/A
6 Street frontage landscaping, including boulevard details and tree grate
details as applicable based upon block frontage.
Refer to drawing L000 & L500
7 Locations and dimensions of proposed landscape buffer strips, including
watercourse buffer zones demonstrating compliance
with watercourse setback planting plan requirements per Section
38.410.100, BMC unless previously provided during
subdivision review.
NA
8 Location, height and material of proposed landscape screening and
fencing (with berms to be delineated by one foot
contours).
The project does not include any proposed fencing.
Proposed landscape screening is indicated on Sheet
L000, L300, & L301.
9 An indication of how existing healthy trees (if any) are to be retained and
protected from damage during construction. A public
tree protection and/or removal plan must be approved by the Forestry
Division Manager. A Public Tree Reimbursement Form
may be required. Please contact the City Forestry Division for the form
and more information.
Refer to Sheet L000 for existing tree location. Refer to
Public Tree Reimbursement Form. To be submitted
concurrently with site plan review.
10 Size, height, location and material of proposed seating, lighting, planters,
sculptures, and water features
Refer to drawing L000 & L200.
11 Areas to be irrigated and type of proposed irrigation and the irrigation
system design plan.
a. Include a description of proposed watering methods including any use
of high efficiency irrigation technologies and best
practice, the source of irrigation water, estimated amount of water
consumption broken down by vegetation type
in square feet (e.g. turf, shrubs, trees) and total estimated water
consumption.
Refer to drawing L600-L603.
CONTINUES ON FOLLOWING PAGE
G|R|E|C Architects BLOCK A | Tracys Third Addition, Lot 2A, Block A Plat C-18-D
0.37 acre and Lot 3A, Block A, Plat C-18-D 0.72 acre
SPR SUBMITTAL | THE HOTEL BOZEMAN
SITE PLAN CHECKLIST
THE HOTEL BOZEMAN | BLOCK A
REVISED 01/26/2024
CHECKLIST ITEMS APPLICANT RESPONSE
LIGHTING PLAN AND DETAILS
1 Lighting plan and electrical site plan, complete with all structures, parking spaces, building entrances, traffic areas (both
vehicular and pedestrian), vegetation that might interfere with lighting,
and adjacent uses, containing a layout of all proposed
fixtures by location and type.
Refer to drawing E1.1.1
2 A photometric lighting plan that contains a layout of all proposed fixtures
by location and type and extends the photometric
information to the property boundaries and rights of way. For fueling
canopies a second photometric plan is required to specifically analyze the light output underneath the drip line of the fuel
canopy.
Refer to drawing E1.1.2
3 Details for all proposed exterior fixtures that are keyed to the fixtures
noted in the lighting electrical plan and the photometric
lighting plan. The detail must demonstrate compliance with full cut-off
requirements in Section 38.570, BMC and be located on
the lighting plan sheets.
Refer to drawing E1.1.4, E1.1.5, E1.1.6, E1.1.7.
4 If building lighting is proposed, elevations or similar information must
show the illumination on any vertical surface or angular
roof surface. Ensure that average footcandles is also depicted.
Does not apply.
5 If accent lighting is proposed, provide a depiction of location, direction
and intensity of any accent lighting, along with where
and to what extent the surface will be illuminated.
Does not apply.
DETAIL SHEET REQUIREMENTS
The detail sheet requirements can be a separate unified sheet or part of
the sheets listed above that it relates to, as long as it does
not overly congest the sheet. The requirements below are only if it is
applicable to the project. 1 Civil Details:
a. Utility trench
b. Corporation stop
c. Detention/retention infrastructure including drainage swale cross
section, pond(s) cross section with structure(s), dry well
cross section, and underground storage plan and sections. d. Manholes.
Refer to drawingC4.2-C4.5
2 Bicycle rack type and detail Refer to drawings A.500
3 Provision for handicapped accessibility, including but not limited to, wheelchair ramps, parking spaces, handrails and curb cuts,
including signage and construction details and the applicant’s
certification of ADA compliance.
Refer to drawing C4.2-C4.5
4 Fences, walls, railings and handrails, including typical details. Refer to L500-503
5 Permanent trash enclosure and refuse collection areas, including typical
details and elevations.
Refer to A.101
6 Curb, asphalt section, sidewalk and drive approach construction details. Refer to drawing C4.2-C4.5
7 Trail section.N/A
CONTINUES ON FOLLOWING PAGE
G|R|E|C Architects BLOCK A | Tracys Third Addition, Lot 2A, Block A Plat C-18-D
0.37 acre and Lot 3A, Block A, Plat C-18-D 0.72 acre
SPR SUBMITTAL | THE HOTEL BOZEMAN
SITE PLAN CHECKLIST
THE HOTEL BOZEMAN | BLOCK A
REVISED 01/26/2024
CHECKLIST ITEMS APPLICANT RESPONSE
PARKLAND REQUIREMENTS
1 If parkland is proposed, a park plan shall be submitted consistent with
Section 38.220.060.A.14, BMC.
a. Park plan must include all property boundary dimensions and frontage
calculations per Section 38.420.060.A, BMC. Justification for any reduction in frontage must be addressed in the Park
Plan narrative.
b. If there is any “unacceptable” land being proposed for inclusion within
the larger park area per Section 38.420.020.E,
BMC, it must be displayed on the park plan drawings and justification
provided in the Park Plan narrative.
c. Any request for parkland waiver per Section 38.420.100, BMC must
be provided in the Park Plan narrative.
Refer to Cash-in-Lieu Parkland Dedication table on drawing A.001
2 Provide net density for the project based on the definition in Section
38.700.130, BMC and show calculations including value
of all areas reduced. For Master Site Plans, provide an estimate of net density. Provide calculations within the Park Plan
narrative and final results on the Park Plan cover sheet.
Refer to Cash-in-Lieu Parkland Dedication table on drawing A.001
3 A parkland dedication tracking table per Section 38.420.020.A, BMC
must be included on the site plan cover sheet. If you have
questions on how to fill out this table, contact the Parks Division.
Refer to Cash-in-Lieu Parkland Dedication table on
drawing A.001
4 Provide source and amount of parkland credit to be used if previously
provided. If credit is from a subdivision, confirm the amount provided and detailed phase information.
N/A
5 If the park proposal includes improvements-in-lieu of parkland, provide a
table with cost estimates and indicate in which phase of the development the improvements in-lieu will be installed, if
applicable
N/A
REQUIRED FORMS
N1CCON
END OF SECTION