Loading...
HomeMy WebLinkAboutResolution 3378 Authorize City Manager to sign Change order 5, Oak St .' ..- COMMISSION RESOLUTION NO. 3378 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH JTL GROUP, INC., BELGRADE, MONTANA. WHEREAS, the City Commission did, on the 7th day of June 1999, authorize award of the bid for construction of Oak Street between North 7th Avenue and North Rouse Avenue to JTL Group, Inc., Belgrade, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and JTL Group, Inc., as contained in Change Order No.5, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change orders for and on behalf of the City; and the Clerk of the Commission is authorized and directed to attest such signature. PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 7th day of August 2000. ~tJ~ MARCIA B. YOUNGMAN, ayor ATTEST: ~ J~ ROBIN L. SULLIVAN Clerk of the Commission . --- -- ---------- . ... ,. ,. CHANGE ORDER ORDER NO.: 5 PROJECT TITLE: Oak Street. North 7th Avenue to Rouse Avenue PROJECT NO.: C.o.B. ProjectMNI #4 CONTRACT DATE: July 2, 1999 OWNER: City of Bozeman CONTRACTOR: JTL Group, Inc. Change Orders must be accompanied by an itemized cost breakdown. You are hereby requested to comply with the following changes from the Contract Documents. ITEM DESCRIPTION OF CHANGES TOTAL NO. ESTIMATED UNIT UNIT COST QUANTITY COST 1 White Plastic ~ Words & Symbols 510.0 S.F. $13.00 (+) $6630.00 2 Signs - Sheet Alum. Refl. Sheet III 111.25 S.F. $14.75 (+) $1640.94 3 Posts - 2 3/8" 0.0. Galvanized Steel 1737.0 LBS. $3.50 (+)$6079.50 4 Fire Hydrant (Reduction of Total Cost) 0.287 L.SUM $2700.00 (-)$774.90 5 Emulsified Asphalt CRS-2 31.2 TONS $156.00 (-)$4867.20 6 Emulsified Asphalt CRS-2 31.2 TONS $179.00 (+)$5584.80 7 Mobilization 1.0 L. SUM $800.00 (+)$800.00 TOTAL COST (+) $15,093.14 GRAND TOTAL - THIS CHANGE ORDER (+)$15,093.14 Original Contract Price $527,186.57 Current Contract Price Adjusted by Previous Change Order $551,220.62 Cost this Change Order (+ or.) (+) $15,093.14 New Contract Price including this Change Order $566,313.76 The completion date as set forth in the Contract Documents shall be (unchanged, increased, decreased) by 4 calendar days. CO - 5 Rev. 11/99 --..--.----...-...". .. ---.-.------ ... - --.. .---. . .. . ., The date for completion of all work will be: Auaust 31. 2000(unless weather Drohibits operations). Description and Justification for Change: 1. Quantity addition resulting from City of Bozeman request to add bicycle lane signs and pavement markings along the paved shoulder on both sides of Oak Street. 2. See note number 1. Also note increase in unit price from $14.00 to $14.75 as per Poteet's quote submittal to JTL. Poteet had been 100% done with their work on this project. With the additional signing, they are quoting an additional $0.75 per square foot over the price bid back in 1997. 3. See note number 1. 4. JTL Group did not charge the complete $2700 for this bid item because some existing materials were used in the fire hydrant relocation. JTL charged a percentage equal to 71.3 % of the lump sum amount. Therefore, the reduction in cost for this item is 1.0 - 0.713 = 0.287 (or 28.7 %). 5. This bid item is being removed for purposes of this change order to account for a new allowed unit price increase in emulsified asphalt CRS-2 chip seal oil. 6. This bid item is being added back into the change order with a new unit price of $179.00 per ton to account for a significant increase in oil prices over the past year. 7. Additional mobilization cost for JTL's subcontractor, Poteet, to re-mobilize to the jobsite. Their prior work on the project had been 100% completed. Surety consent is required if the net increase exceeds 20% of the Original Contract Amount. SURETY CONSENT The Surety hereby consents to the aforementioned Contract Change Order and agrees that its bond or bonds shall apply and extend to the Contract as thereby modified or amended per this Change Order. The Principal and the Surety further agree that on or after execution of this consent, the penalty of the applicable Performance Bonds or Bonds is hereby increased by $ (100% of the Change Order amount) and the penalty of the applicable Labor and Material Bond or Bonds is hereby increased by $ (100% of the Change Order amount). COUNTERSIGNED BY MONTANA RESIDENT SURETY AGENT By: Seal ()7);3)ZIJC"O Accepted by: '/; Date 7. /r' 1z..~C,) Contractor Date Approved by: Owner Date t:lhighwa yslnewoaklconstructlchange_5. wp6 CO- 5 Rev. 11/99