Loading...
HomeMy WebLinkAbout04-15-25 DURD Agenda and Packet MaterialsA. Call meeting to order - 12:00 p.m. B. Disclosures C. Changes to the Agenda D. Public Comments on Non-agenda Items Falling within the Purview and Jurisdiction of the Board THE DOWNTOWN AREA URBAN RENEWAL DISTRICT BOARD OF BOZEMAN, MONTANA DURD AGENDA Tuesday, April 15, 2025 General information about the Downtown Area Urban Renewal District Board is available in our Laserfiche repository. If you are interested in commenting in writing on items on the agenda please send an email to comments@bozeman.net or visit the Public Comment Page prior to 12:00pm on the day of the meeting. At the direction of the City Commission, anonymous public comments are not distributed to the Board or staff. Public comments will also be accepted in-person and through Video Conference during the appropriate agenda items. As always, the meeting will be streamed through the Commission's video page and available in the City on cable channel 190. For more information please contact Ellie Staley, ellie@downtownbozeman.org This meeting will be held both in-person and also using an online video conferencing system. You can join this meeting: Via Video Conference: Click the Register link, enter the required information, and click submit. Click Join Now to enter the meeting. Via Phone: This is for listening only if you cannot watch the stream, channel 190, or attend in- person United States Toll +1 346 248 7799 Access code: 956 1935 4304 This is the time to comment on any non-agenda matter falling within the scope of the Downtown Urban Renewal District Board. There will also be time in conjunction with each agenda item for public comment relating to that item but you may only speak once per topic. Please note, the Board cannot take action on any item which does not appear on the agenda. All persons addressing the Board shall speak in a civil and courteous manner and members of the audience shall be respectful of others. Please state your name, and state whether you are a resident of the city or a property owner within the city in an audible tone of voice for the record and limit your comments to three minutes. 1 E. Action Items E.1 Proposed FY26 Budget & Work Plan Review and Approval (Staley) F. FYI/Discussion F.1 Executive Director's April 2025 Report (Staley) G. Adjournment For more information please contact Ellie Staley, Downtown Bozeman Partnership, ellie@downtownbozeman.org This board generally meets the 3rd Tuesday of the month from 12:00 to 1:30pm City Board meetings are open to all members of the public. If you have a disability that requires assistance, please contact our ADA Coordinator, David Arnado, at 406.582.3232. 2 Memorandum REPORT TO:Downtown Area Urban Renewal District Board FROM:Ellie Staley, Executive Director SUBJECT:Proposed FY26 Budget & Work Plan Review and Approval MEETING DATE:April 15, 2025 AGENDA ITEM TYPE:Finance RECOMMENDATION:Approve the proposed FY26 Amended Downtown Urban Renewal Budget and Work Plan. STRATEGIC PLAN:4.4 Vibrant Downtown, Districts & Centers: Promote a healthy, vibrant Downtown, Midtown, and other commercial districts and neighborhood centers – including higher densities and intensification of use in these key areas. BACKGROUND:Ellie will present the 3rd draft of the FY26 Budget and Work Plan. Board to review and vote to approve. Final Downtown URD Approved Budget will be presented to the City Commission on May 6, 2025 for final FY26 DURD Budget and Work Plan approval. UNRESOLVED ISSUES:None. ALTERNATIVES:None. FISCAL EFFECTS:None. Attachments: DTN URD Budget FY2026-no notes.pdf FY2026 URD Work Plan-DURD.pdf Report compiled on: April 9, 2025 3 Downtown Urban Renewal District Board - FY25/26 DRAFT Category FY25 FINAL Budget FY25 PROJ. Budget FY26 DRAFT Budget FY26 AMEND Budget Income Starting Cash Balance $6,061,900 $6,061,900 $91,500 $7,255,328Income from TIF COB Interlocal Share $2,362,500 $2,362,500 $2,598,800 $2,598,800Entitlement Share State of Montana $57,100 $57,100 $57,100 $57,100 Interest Income $2,100 $2,100 $2,100 $2,100 Other Income Total Income $8,483,600 $8,483,600 $2,749,500 $9,913,328 ExpensesOperations DBP Management Fee $236,000 $236,000 $251,000 $251,000City Administrative Costs/Support $61,100 $61,100 $64,300 $64,300Total Operations $297,100 $297,100 $315,300 $315,300 Infrastructure Improvements Park Improvements (Soroptimist/NBPP)$10,000 $75,000 $250,000 $250,000Alley Improvements $50,000 $132,834 $0 $0 Public Utility Infrastructure Improvements $350,000 $110,000 $400,000 $1,000,000 Wayfinding & Parking Signage $15,000 $3,920 $20,000 $20,000Bozeman Creek Improvements $0 $10,000 $50,000Alternative Transportation Projects $40,000 $25,000 $10,000 Tree Replacement Project (Streetscape Imp. in FY24)$50,000 $11,850 $50,000 $10,000 Street Furniture/Streetscape Improvements & Furniture $25,000 $25,000 $25,000 $100,000 Intersection Cable Anchor Repairs $10,000 $10,000 $10,000Parklet Infrastructure $20,000 $25,000 $0 $10,000Streetlamp Power Reconfiguration Project (SILD)$100,000 $4,600 $0 $0 Streetscape Assistance Grant Program $50,000 $100,000 $100,000 Life-Safety Grant Program $30,000 $30,000 $60,000 Fiber-Broadband Infrastructure Grants $10,000 $10,000 $10,000Art Enhancement/CPTED Grant Program $20,000 $20,000 $20,000 $40,000Total Infrastructure $780,000 $408,204 $950,000 $1,670,000 Housing Assistance Residential Incentive Grant Program $200,000 $200,000 $400,000Workforce Housing Project - Fire Station One $1,600,000 $1,600,000Total Housing $1,800,000 $200,000 $2,000,000 Planning Park Improvement Planning (Soroptimist/NBPP)$50,000 $27,510 $0 $10,000 Alley Planning $25,000 $9,841 $10,000 $0Utility Infrastructure Improvement Planning $50,000 $25,000 $50,000 $50,000 Wayfinding Plan Development $35,000 $10,000 $10,000Bozeman Creek Planning $20,000 $15,617 $10,000 $50,000Alternative Transportation Planning $10,000 $25,000 $25,000 Downtown Streetscape Design Standards $10,000 $10,000 $10,000 $0Side-Streetscape Preliminary Engineering $25,000 $50,000 $50,000 Parklet Planning/Program $10,000 $5,000 $20,000 $20,000 DBIP General Implementation $50,000 $50,000 $50,000 Professional Services Term Contract $75,000 $20,000 $75,000 $75,000Code Amendments $0 $0 $0Downtown Infrastructure & Public Realm Plan $0 $0 $0 Technical Assistance Grant Program $50,000 $50,000 $50,000 $70,000 Parking - Designated Funds Parking Supply, Management Planning, and Data Collection $4,770,000 $25,000 $20,000 $5,000,000 Total Planning/Parking $5,180,000 $187,968 $380,000 $5,410,000 Parking Structure Garage Bond Payment $335,000 $335,000 $335,000 $335,001 Total Parking Garage Payments $335,000 $335,000 $335,000 $335,001 Total Expenses $8,392,100 $1,228,272 $2,180,300 $9,730,301 Balance $91,500 $7,255,328 $569,200 $183,027 DURD FY25 DRAFT Budget 4 Downtown Urban Renewal District FY2026 Work Plan and Budget Downtown URD Mission Statement The Downtown Bozeman Urban Renewal District board (URD) will foster an economically thriving district that: 1) attracts investment; 2) stabilizes and strengthens the tax base; and 3) supports the vitality and diversity of the Gallatin Valley as its social and cultural center. The Urban Renewal Plan (originally adopted in 1995 and amended in 2015) guides the implementation of projects and initiatives through nine guiding principles that focus on economic vitality, safety, accessibility, diversity, and cultural activities. FY2026 Programs, Projects, and Initiatives The Downtown URD anticipates an FY25 year-end balance of $7.25 million, with projected FY26 revenues of $2.66 million, totaling just under $9.9 million of funding available. The following outlines notable programs, projects, and associated expenses for FY26. Ongoing DBP/City of Bozeman Operational Support: • Downtown Bozeman Partnership (DBP) Management Fee (FY26 - $251,000) Continued operations and support for DBP staff and programming. • City of Bozeman Economic Development Staff Support (FY26 - $64,300) Continued partnership funding to support City staff time dedicated to downtown URD coordination. Ongoing Programs & Projects in FY26: • Downtown Park Improvements (FY26 - $250,000) Infrastructure improvements planned for I-Ho Peace Park, to be constructed in FY26. • Utility Infrastructure Improvements (FY26 - $1,000,000) Includes 5th and Main Lighting project and discretionary public utility infrastructure investments. • Wayfinding and Parking Signage (FY26 - $20,000) Continued infrastructure and signage implementation, possibly supported by state grant funds. • Bozeman Creek Infrastructure Improvements (FY26 - $50,000) New allocation to support ongoing flood mitigation and infrastructure improvements. 5 • Alternative Transportation Improvements (FY26 - $10,000) Potential support for Black Avenue bike route improvements and pedestrian access and safety projects. • Tree Replacement Project (FY26 - $10,000) Reduced funding due to less anticipated need; ongoing streetscape maintenance. • Street Furniture/Streetscape Improvements (FY26 - $100,000) Includes luminaires for 5th and Main Phase 2. • Parklet Infrastructure (FY26 - $10,000) Upkeep and minor enhancements to the parklet program. Current Encumbered Projects and Programs: • Workforce Housing Project – Fire Station One (Encumbered - $1,600,000) Multi-year support for 50 units of workforce housing; funds encumbered through FY27. DURD Grant Programs in FY26: • Streetscape Assistance Grant Program (FY26 - $100,000) Grant funding for new development projects requiring public streetscape and sidewalk improvements. • Life-Safety Grant Program (FY26 - $60,000) Expanded funding in FY26 to include encumbered support for the Heatherington project (~30K) and new grant application support. • Fiber Infrastructure Grant (FY26 - $10,000) Ongoing support for broadband infrastructure improvements and connection. • Art Enhancement/CPTED Grant Program (FY26 - $40,000) Expand program to support public art and safety enhancements including lighting, surveillance, and landscape improvements. • Residential Incentive Grant Program (FY26 - $400,000) Two new grants approved in FY25 with $200K encumbered to be paid in FY26, including availability for additional awards in FY26. • Technical Assistance Grant Program (FY26 - $70,000) Grant program providing expertise and early-phase planning for redevelopment projects. Estimated 20K in encumbered/approved grants Planning & Design in FY26: • Park Improvement Planning (FY26 - $10,000) Continued planning for redevelopment of Soroptimist Park. • Utility Infrastructure Improvement Planning (FY26 - $50,000) Continued planning for future critical utility infrastructure projects. Several off-main projects slated for FY26, many with public infrastructure improvement needs. 6 • Wayfinding Plan Development (FY26 - $10,000) Ongoing updates and refinements to signage and directional plans. Planning in FY26, improvements in FY27. • Bozeman Creek Planning (FY26 - $50,000) Significant support for planning and engineering as part of flood mitigation and creek improvement. Potential to use towards matched funding from other project partners. • Alternative Transportation Planning (FY26 - $25,000) Continued collaboration with the City for pedestrian and bike route enhancements. • Side-Streetscape Preliminary Engineering (FY26 - $50,000) Pre-engineering for Main Street- adjacent streetscape expansion. • Parklet Planning/Program (FY26 - $20,000) Develop formal Pedlet Plan using experience and knowledge from pilot program in FY25. • DBIP General Implementation (FY26 - $50,000) Broad funding to support Downtown Improvement Plan-related needs. • Professional Services Term Contract (FY26 - $75,000) Continued funding for on-call planning, engineering, and design services. Parking Investments: • Parking Supply, Management Planning & Data Collection (FY26 - $5,000,000) Major allocation to fund a future Public-Private Partnership (PPP) to expand parking supply. • Garage Bond Payment (FY26 - $335,001) Scheduled annual bond payment for existing downtown parking garage, through 2032. FY2026 Downtown URD Budget Overview: Estimated Income: $9,913,328 Total Expenses: $9,730,301 Estimated Year-End Balance: $183,027 Prepared and submitted by: Ellie Staley, Executive Director Downtown Bozeman Partnership ellie@downtownbozeman.org | 406-586-4008 7 Memorandum REPORT TO:Downtown Area Urban Renewal District Board FROM:Ellie Staley, Executive Director Downtown Bozeman Partnership SUBJECT:Executive Director's April 2025 Report MEETING DATE:April 15, 2025 AGENDA ITEM TYPE:Plan/Report/Study RECOMMENDATION:Discuss STRATEGIC PLAN:7.3 Best Practices, Creativity & Foresight: Utilize best practices, innovative approaches, and constantly anticipate new directions and changes relevant to the governance of the City. Be also adaptable and flexible with an outward focus on the customer and an external understanding of the issues as others may see them. BACKGROUND:Ellie will present the monthly report of general program updates and updates to topics relating to downtown. Board will discuss relevant matters. UNRESOLVED ISSUES:None ALTERNATIVES:None FISCAL EFFECTS:None. Attachments: 24006_04_BOZEMAN_URD_TASK_3_PACKAGE_1 1.pdf Downtown Tracking Sheet-Dev. Q2_2025.pdf Downtown Tracking Sheet-Bus. Q2_2025.pdf DBP Monthly ED Report 4-25-DURD.pdf Report compiled on: April 9, 2025 8 PREPARED FOR:SITEBOZEMAN, MTCITY OF BOZEMANMAIN STREET LIGHTING DESIGN PACKAGE 1CITY OF BOZEMANBOZEMAN, MT20 EAST OLIVEVICINITY MAPPROJECT NO:24006_04ISSUED FOR CONSTRUCTIONFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION24006_04-------ISSUED FOR CONSTRUCTION-----03/11/25RELIMINARY - FOR REVIEW02/12/25HGC/KRK24006_04_ELEC_PROD_PACKAGE_1.DWGJHS12345671098PROJECT NO:24006_04ISSUED FOR CONSTRUCTIONE1.1106 East Babcock, Suite L1Bozeman, Montana 59715406.522.9876sanbell.comSHEETTITLEE1.1COVERE1.2LEGENDE1.3ELECTRICAL SITE PLANE1.4ELECTRICAL WIRING DIAGRAME1.5ELECTRICAL DETAILSE1.6ELECTRICAL DETAILSE1.7ELECTRICAL DETAILSE1.8ELECTRICAL DETAILSE1.9ELECTRICAL DETAILSE1.10LUMINAIRE CUT SHEETSP:\24006_04_Bozeman_URD_Task_3_Main_St_Lighting\CADD_C3D\PRODUCTION_DWG\Updates packages\24006_04_ELEC_PROD_Package_1.dwg, E1.1, 3/11/2025 4:28:42 PM, kketterling, 1:1 9 ELECTRIC JUNCTION BOXEXISTING STORM DRAIN MANHOLEEXISTING CATCH BASINSIGNPOWER POLEEXISTING WATER VALVEEXISTING FIRE HYDRANTBOLLARDBUSHEXISTING CURB STOPFIRE DEPT. CONNECTIONFIBER OPTIC PEDESTALGAS METERGAS MANHOLEGAS VALVEGUYWIREIRRIGATION VALVEIRRIGATION BOXLIGHT POLEPOWER METERPOWER MANHOLEELECTRIC PEDESTALROOF DRAINSIGNAL POLEEXISTING SANITARY SEWER MANHOLESANITARY SEWER CLEAN OUTTELEPHONE BOXTELEPHONE MANHOLETELEPHONE PEDESTALTRANSFORMERCONIFEROUS TREEDECIDUOUS TREECOMMUNICATIONS MANHOLECOMMUNICATIONS PEDESTALWELLYARD HYDRANTEW = FINISHED GRADE AT EDGE OF WALKTC = FINISHED GRADE AT TOP BACK OF CURBBC = FINISHED GRADE AT BUILDING CORNERTW = FINISHED GRADE AT TOP OF WALLAC = FINISHED GRADE AT ASPHALTEA = FINISHED GRADE AT EDGE OF ASPHALTEC = FINISHED GRADE AT EDGE OF CONCRETESDI = STORM DRAIN INLETSDMH = STORM DRAIN MANHOLEFL = FINISHED GRADE AT FLOWLINEFG = FINISHED GRADE EX = APPROXIMATE EXISTING ELEVATIONPOC = POINT ON CURVEEXISTING WATER REDUCERGAS WELLFOUND CORNER MONUMENT AS NOTEDSET CORNER MONUMENT, REBAR WITH CAPBENCHMARKSECTION QUARTER CORNERSECTION CORNERWTR = WATERPI = POINT OF INTERSECTIONPRC = POINT OF REVERSE CURVERT = RIGHTLT = LEFTSS = SANITARY SEWERPT = POINT OF TANGENCYSD = STORM DRAINGV = GATE VALVEBFV = BUTTERFLY VALVERED = REDUCERLF = LINEAL FOOTFT = FEETSSMH = SANITARY SEWER MANHOLEBVC = BEGIN VERTICAL CURVECS = CURB STOPEVC = END VERTICAL CURVEPVI = POINT OF VERTICAL INTERSECTIONLINETYPESABBREVIATIONSSYMBOLSPROPOSED CATCH BASINPROPOSED WATER REDUCERPROPOSED WATER VALVEPROPOSED FIRE HYDRANTPROPOSED CURB STOPPROPOSED SANITARY SEWER MANHOLEPROPOSED STORM DRAIN MANHOLEKEYNOTE CALL OUT(SEE KEYNOTE LEGEND)SRVC = SERVICE(TYP.) = TYPICALPC = POINT OF CURVATUREEXISTING MONUMENT BOXPROPOSED MONUMENT BOXGR = EXISTING GRADE AT GROUNDBRK = GRADE BREAKFIBER OPTICGAS PIPELINEOIL PIPELINEUNDERGROUND POWERSANITARY SEWERSTORM DRAINTELEPHONETELEVISION/CABLEWATERCONTOUROVERHEAD POWERFENCE - VINYLFENCE - BARBED WIREFENCE - WOODCURB AND GUTTEREDGE OF ASPHALTEDGE OF GRAVELFENCE - CHAINLINK/WOVEN WIREEXISTINGPROPOSEDHP = HIGH POINTDEMO AREAPROPOSED ASPHALTPROPOSED CONCRETEPROPOSED GRAVELISSUED FOR CONSTRUCTIONEXISTING WATER MANHOLEWATER METERLIQUID PROPANE PIPELINEFILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION MAIN STREET LIGHTING DESIGN PACKAGE 1 LEGEND CITY OF BOZEMAN URBAN RENEWAWAL DISTRICT TASK ORDER NO. 3 BOZEMAN, MTE1.2JHS 24006_04_ELEC_PROD_PACKAGE_1.DWG HGC/KRK 02/12/25 RELIMINARY - FOR REVIEW 03/11/25 - - - - - ISSUED FOR CONSTRUCTION - - - - - -- 24006_04NOTE:-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BESTINFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCHINFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BESTRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITYCOMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.-ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARDSPECIFICATIONS 7TH EDITION, APRIL, 2021, AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS, DATEDOCTOBER, 2024.-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THERESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY APARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUESAS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.P:\24006_04_Bozeman_URD_Task_3_Main_St_Lighting\CADD_C3D\PRODUCTION_DWG\Updates packages\24006_04_ELEC_PROD_Package_1.dwg, E1.2, 3/11/2025 4:28:43 PM, kketterling, 1:1 10 L3L4L5L1L2ISSUED FOR CONSTRUCTION020SCALE: 1" = 20'401020FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION MAIN STREET LIGHTING DESIGN PACKAGE 1 ELECTRICAL SITE PLAN CITY OF BOZEMAN URBAN RENEWAWAL DISTRICT TASK ORDER NO. 3 BOZEMAN, MTE1.3JHS 24006_04_ELEC_PROD_PACKAGE_1.DWG HGC/KRK 02/12/25 RELIMINARY - FOR REVIEW 03/11/25 - - - - - ISSUED FOR CONSTRUCTION - - - - - -- 24006_04CONDUIT & WIRE SCHEDULEABCP:\24006_04_Bozeman_URD_Task_3_Main_St_Lighting\CADD_C3D\PRODUCTION_DWG\Updates packages\24006_04_ELEC_PROD_Package_1.dwg, E1.3, 3/11/2025 4:28:46 PM, kketterling, 1:1 11 ISSUED FOR CONSTRUCTIONAWG NO.2SERVICE120/240 VOLTGROUND RODBARE AWG NO.6SERVICE RATED200 AMP METERMAINCIRCUIT BREAKER20 AMP,2 POLE,SINGLE THROWMAIN DISCONNECT200 AMPAWG NO.14AWG NO.6TO LUMINAIRESAWG NO.10(120 V)(120 V)N.E.M.A.TYPE 3RCABINETAUTO-OFF-MANUALSWITCHPHOTO-ELECTRICCONTROLTO GROUND LUGOF EACH POLEAWG NO.820 AMP CONTACTOR2 POLE,SINGLE THROWLIGHTNINGARRESTORFILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION MAIN STREET LIGHTING DESIGN PACKAGE 1 ELECTRICAL WIRING DIAGRAM CITY OF BOZEMAN URBAN RENEWAWAL DISTRICT TASK ORDER NO. 3 BOZEMAN, MTE1.4JHS 24006_04_ELEC_PROD_PACKAGE_1.DWG HGC/KRK 02/12/25 RELIMINARY - FOR REVIEW 03/11/25 - - - - - ISSUED FOR CONSTRUCTION - - - - - -- 24006_04 P:\24006_04_Bozeman_URD_Task_3_Main_St_Lighting\CADD_C3D\PRODUCTION_DWG\Updates packages\24006_04_ELEC_PROD_Package_1.dwg, E1.4, 3/11/2025 4:28:50 PM, kketterling, 1:1 12 ISSUED FOR CONSTRUCTION FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION MAIN STREET LIGHTING DESIGN PACKAGE 1 ELECTRICAL DETAILS CITY OF BOZEMAN URBAN RENEWAWAL DISTRICT TASK ORDER NO. 3 BOZEMAN, MTE1.5JHS 24006_04_ELEC_PROD_PACKAGE_1.DWG HGC/KRK 02/12/25 RELIMINARY - FOR REVIEW 03/11/25 - - - - - ISSUED FOR CONSTRUCTION - - - - - -- 24006_04 P:\24006_04_Bozeman_URD_Task_3_Main_St_Lighting\CADD_C3D\PRODUCTION_DWG\Updates packages\24006_04_ELEC_PROD_Package_1.dwg, E1.5, 3/11/2025 4:28:50 PM, kketterling, 1:1 13 ISSUED FOR CONSTRUCTION FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION MAIN STREET LIGHTING DESIGN PACKAGE 1 ELECTRICAL DETAILS CITY OF BOZEMAN URBAN RENEWAWAL DISTRICT TASK ORDER NO. 3 BOZEMAN, MTE1.6JHS 24006_04_ELEC_PROD_PACKAGE_1.DWG HGC/KRK 02/12/25 RELIMINARY - FOR REVIEW 03/11/25 - - - - - ISSUED FOR CONSTRUCTION - - - - - -- 24006_04 P:\24006_04_Bozeman_URD_Task_3_Main_St_Lighting\CADD_C3D\PRODUCTION_DWG\Updates packages\24006_04_ELEC_PROD_Package_1.dwg, E1.6, 3/11/2025 4:28:52 PM, kketterling, 1:1 14 ISSUED FOR CONSTRUCTION FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION MAIN STREET LIGHTING DESIGN PACKAGE 1 ELECTRICAL DETAILS CITY OF BOZEMAN URBAN RENEWAWAL DISTRICT TASK ORDER NO. 3 BOZEMAN, MTE1.7JHS 24006_04_ELEC_PROD_PACKAGE_1.DWG HGC/KRK 02/12/25 RELIMINARY - FOR REVIEW 03/11/25 - - - - - ISSUED FOR CONSTRUCTION - - - - - -- 24006_04 P:\24006_04_Bozeman_URD_Task_3_Main_St_Lighting\CADD_C3D\PRODUCTION_DWG\Updates packages\24006_04_ELEC_PROD_Package_1.dwg, E1.7, 3/11/2025 4:28:56 PM, kketterling, 1:1 15 ISSUED FOR CONSTRUCTION FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION MAIN STREET LIGHTING DESIGN PACKAGE 1 ELECTRICAL DETAILS CITY OF BOZEMAN URBAN RENEWAWAL DISTRICT TASK ORDER NO. 3 BOZEMAN, MTE1.8JHS 24006_04_ELEC_PROD_PACKAGE_1.DWG HGC/KRK 02/12/25 RELIMINARY - FOR REVIEW 03/11/25 - - - - - ISSUED FOR CONSTRUCTION - - - - - -- 24006_04 P:\24006_04_Bozeman_URD_Task_3_Main_St_Lighting\CADD_C3D\PRODUCTION_DWG\Updates packages\24006_04_ELEC_PROD_Package_1.dwg, E1.8, 3/11/2025 4:29:02 PM, kketterling, 1:1 16 ISSUED FOR CONSTRUCTION FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION MAIN STREET LIGHTING DESIGN PACKAGE 1 ELECTRICAL DETAILS CITY OF BOZEMAN URBAN RENEWAWAL DISTRICT TASK ORDER NO. 3 BOZEMAN, MTE1.9JHS 24006_04_ELEC_PROD_PACKAGE_1.DWG HGC/KRK 02/12/25 RELIMINARY - FOR REVIEW 03/11/25 - - - - - ISSUED FOR CONSTRUCTION - - - - - -- 24006_04 P:\24006_04_Bozeman_URD_Task_3_Main_St_Lighting\CADD_C3D\PRODUCTION_DWG\Updates packages\24006_04_ELEC_PROD_Package_1.dwg, E1.9, 3/11/2025 4:29:05 PM, kketterling, 1:1 17 ISSUED FOR CONSTRUCTION FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION MAIN STREET LIGHTING DESIGN PACKAGE 1 LUMINAIRE CUT SHEETS CITY OF BOZEMAN URBAN RENEWAWAL DISTRICT TASK ORDER NO. 3 BOZEMAN, MTE1.10JHS 24006_04_ELEC_PROD_PACKAGE_1.DWG HGC/KRK 02/12/25 RELIMINARY - FOR REVIEW 03/11/25 - - - - - ISSUED FOR CONSTRUCTION - - - - - -- 24006_04 P:\24006_04_Bozeman_URD_Task_3_Main_St_Lighting\CADD_C3D\PRODUCTION_DWG\Updates packages\24006_04_ELEC_PROD_Package_1.dwg, E1.10, 3/11/2025 4:29:08 PM, kketterling, 1:1 18 DOWNTOWN DEVELOPMENT TRACKING Q2 2025 April - June CURRENT PROJECTS ADDRESS STATUS PROPERTY TYPE UNIT TYPE(S) NOTES (design professional, stories, etc) GRANT REIMBURSE MENTS DURD Funding $ Cooper Black (Dtn Antiques)122 E Main St In Progress Mixed 2 commercial, 3 residential Closure 6/3-6/8, Walkway through 2025 N/A The Baltimore/The Range 222 E Main St In Progress Mixed GL Restaurant Construction Walkway, GL Italian Restaurant, additional details TBA N/A Freestone on Main 421 W Main In Progress Residential 120, added Midtown and Downtown URD collab lghting project TBD Residential Incentive, Sewer Imp. Argreement, Streetscape $436,000 reimbursement funds confirmed Abby Hetherington Interiors 33 S Tracy In Progress Retail/Commerc ial 1 GL, 1 UG Langlas & Graphic Haus, 2 stories Streetscape, Façade, Utility, Fire- Safety grant approved and work completed $33,000 funds confirmed for fire-line safety work completed by CKMay 108 W Babcock 108 W Babcock Plans submitted/stre etscape deviation requested Mixed Pearson Design Group, 4 stories, proposed office/residential Mendenhall Flats 240 E Mendenhall Plans submitted Mixed Commercial, Office, 15 two and three bedroom condos Intrinsik, break ground in 2025 Schnee (left side of business)35 E Main Restaurant/Bar Western Bar Tracy Anderson 223 E Main In progress The Scully-Old US Bank Location 112 E Main St 2025 Mixed 7-9, 4 stories Residential, streetscape FUTURE PROJECTS ADDRESS STATUS PROPERTY TYPE UNIT TYPE(S) NOTES (design professional, stories, etc) GRANT REIMBURSE MENTS DURD Funding $ Fire Station One 30 N Rouse N/A Mixed 50 units at 120% AMI 1.6M Workforce Housing Agreement - 2027 Block B (Salvation Army)32 S Rouse 2025/26 Hotel/Hilton Co. 191 keys, 6 stories, 137 UG parking spaces Block A 503-519 E Babcock 2025/26 Mixed 44 units, 7 stories 75 parking spaces, high-end Empire Site 606 E Main N/A Hotel Hotel Project 302 E Mendenhall 2027 Hotel Ag Depot 620-714 E Mendenhall Mixed Downtowner Building S Willson to W Main N/A Mixed Roof, brick and suppression restoration, applied for MHPG 2/29 BG Mill 714 E Mendenhall 18 condos, 5 stories NOT IN DURD Hampton Inn 507 W Main In Progress Hotel + retail 113 rooms, 3 retail, 4 stories *not in URD Sanderson Stewart Hotel Bozeman and Residences 1 W Lamme St In Progress Hotel/ Marriott 120 guest rooms, 29- two-bedroom, 5-3- bedroom, 71 keys 6 stories, Autograph Collection. *not in URD SMA Architecture 19 DOWNTOWN BUSINESS TRACKING Q2 2025APR-JUNE NEW DBA MEMBERS 2 BUSINESS ADDRESS DATE OF MEMBERSHIP Hilton Garden Inn Bozeman 2023 Commerce Way 2-Apr Home2 Suites by Hilton Bozeman Midtown 1760 Baxter Lane 2-Apr NEW BUSINESSES 10 BUSINESS ADDRESS DATE OF OPENING Miguel y Co 131 W Babcock 15-Apr Gallatin Valley Organics  628 W Main St-NOT downtown 16-Apr Spitz Bozeman 1101 E Main St. Unit 101 18-Apr Frugal Burger 113 E Main 1-May Meili Vodka Between Bangtail & Studio Noble (upstairs)TBA Umvelt (formerly Melt House)33 S Grand TBA Tutti Bene 224 E Main St TBA Crossbow Hats 127 E Main St TBA märketplās 33 W Main TBA Bozeman Bike Tours Near Owenhouse Cycling TBA CLOSED BUSINESS 1 BUSINESS ADDRESS DATE OF CLOSURE Teton Gravity Research 9 E Main April VACANT LOCATIONS 5 BUSINESS ADDRESS DATE OF CLOSURE Shredmonk 121 W Main 2023 Cooper Black (frmly DTN Antiques)122 E Main 2023 Thrive 400 E Babcock 2023 Rare Bird (Relocated)131 W Babcock 2024 Tanoshii (temp closure?)113 E Main 2024 DBA DROPPED MEMBERS 0 BUSINESS NOTES DROP DATE 20 Downtown Bozeman Partnership – ED Report April 2025 Downtown Updates: • SAVE THE DATE! The DBP Annual Breakfast is on May 21, 2025 at 7:30am at the Armory. More details to come! • Have a downtown maintenance concern? Report it here. • Summer flower basket sponsorships will be rolled out soon, keep an eye out for information! City of Bozeman Updates: • Watch the Mayor’s State of the City Address • Engage Bozeman: UDC Updates o Community Chat Toolkits are now available. The current timeline is to review the code this summer and have the public hearing and final adoption this fall. Upcoming Public Meetings: https://www.bozeman.net/departments/city-commission/advisory- boards/calendar • Downtown URD Board Meeting- Tuesday, April 15th at 12pm in City Hall • CANCELLED - Downtown BID Board Meeting- Wednesday, April 16th at 12pm in City Hall • City Commission Meeting- Tuesday, May 6th at 6pm in City Hall- Downtown URD & BID Fiscal Year 2026 Budget and Work Plan Presentations will be presented and voted on. DURD Project Updates • Downtown Parking Group Update: Final working group meeting was on Feb. 21. Vision document and action plan with focus on short- and long-term solutions will be made public in the coming months. The group will continue to meet as needed for updates and input. • Current DURD/CoB Project Updates: o Pedlet Pilot Project – Working with property and business owners on South Willson to install a pedlet at Bitterroot Bistro this spring/summer. Pedlet project example: https://www.independent.com/2025/01/27/santa-barbara-city-council-looks-into-short- term-fixes-for-state-street/. Associated permits have been submitted by both parties are we are waiting for staff comments in order to proceed with the purchase order for materials. o I-Ho Peace Park – 100% site plan submitted to CoB, submitted for the Open Space Grant in coordination with Commissioner Madgic, received estimate from Langlas, prepping for bidding document completion and a community fundraising effort. o 5th & Main & Lighting Project – Phase 1 is near completion with 5 luminaire bases installed at the Arco site, Phase 2, signal lighting at 5th and Main intersection is slated for spring 2025 and phase 3 & 4 slated for FY 26-27. o The Alley Beautification Project - Weather extension requested/approved for lighting and sign installation. Project is slated to be complete by June 1, 2025. o Downtown Streetscape Standard – Final Draft under City Engineering Department review. 21 Upcoming Events: • April 21 – 27 – 5th Annual Downtown Bozeman Restaurant Week • May 1 & 2 – Give Big • May 14 - 17 – Montana Festival • DBP Annual Breakfast – Thursday, May 21 at 7:30am at The Armory Music Hall. 22