1ST AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT
THIS 1ST AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT FOR
Swim Center Renovation GC/CM Services dated March 21",2023 (the"Agreement")is made and
entered into this 4th day of April , 2023, by and between the CITY OF BOZEMAN,
MONTANA,a self governing municipal corporation organized and existing under its Charter and
the laws of the State of Montana, 121 North Rouse Street, Bozeman, Montana, with a mailing
address of PO Box 1230, Bozeman, MT 59771, hereinafter referred to as "City," and Jackson
Contractor Group, 146 Laura Louise Ln, Bozeman, MT 59718, hereinafter referred to as
"Contractor."
In consideration of the mutual covenants and agreements herein contained, the receipt and
sufficiency whereof being hereby acknowledged,the parties hereto agree to amend the Agreement
as follows:
1. Modification of Scope. Section 3 of the Agreement is modified to reflect the scope of
services as attached to this Amendment as Exhibit B.
2. Agreement still valid. All remaining terms and provisions of the Agreement remain valid.
**** END OF AGREEMENT EXCEPT FOR SIGNATURES ****
1 ST Amendment to Professional Services Agreement for[Swim Center Renovation GC/CM Services]
FY 2023—FY 2025
Page 1 of 2
DocuSign Envelope ID: E5ECDAAE-2B59-4558-80A1-25B3FF316375
IN WITNESS WHEREOF, the parties hereto have executed this instrument the day and
year first above written.
CITY OF BOZEMAN,MONTANA JACKSON CONTRACTOR GROUP
DocuSigned by:
�f5iDocuSigned by: ? ? DocuSigned by:
By "I 1 .. By 1"ll/� UNA,
1 BOA8859DCD14D0...
Jeff Mihelich, City Manager Print Name: Nick Van Tighem
Title: Project Development Director
APPROVED AS TO FORM
F
DoocuSigned,'byy:
ByY SAIIJ/l.
76992A 9A A446.._
Greg Sullivan, Bozeman City Attorney
1 ST Amendment to Professional Services Agreement for[Swim Center Renovation GC/CM Services]
FY 2023—FY 2025
Page 2 of 2
DocuSign Envelope ID: E5ECDAAE-2B59-4558-80A1-25B3FF316375
DocuSign Envelope ID: E5ECDAAE-2B59-4558-80A1-25B3FF316375
K51
.Jackson
CONTRACTOR GROUP,/NC.
March 9, 2023
Max Ziegler
Facilities Project Coordinator
City of Bozeman
20 East Olive Street
Bozeman, Montana 59715
Re: Fee Proposal for Bozeman Swim Center Phase 1 Permit 2
Dear Max,
Per your request for a Fee Proposal for the Bozeman Swim Center Phase 1 Permit 2 project,Jackson Contractor Group
offers the following:
Please provide a full cost structure for the proposing firm to provide construction and contracting services covered
under the scope of services, including labor rates for aU staff, and materials markup.
Senior Project Manager $126.00 per hour
Project Manager $96.14 per hour
Assistant Project Manager $88.10 per hour
Senior Superintendent $133.00 per hour
Project Superintendent $126.80 per hour
Assistant Superintendent $99.84 per hour
Senior Project Engineer $66.91 per hour
Project Engineer $65.78 per hour
Project Engineer IT $59.63 per hour
Apprentice Carpenter $47.87 per hour
Journeyman Carpenter $57.12 per hour
Carpenter Foreman $64.47 per hour
Laborer $45.55 per hour
All rates listed above are all-in rates inclusive of salary/wages,taxes, benefits, consumables,vehicles where applicable,
safety, etc.
For this project our GCCM Fee will be 8%, all cost of work, general conditions, insurance, contingencies, etc will have this
fee applied upon billing.
Jackson Contractor Group understands the scope of work for Phase 1 Permit 2 of the Swim Center to include:
Scope as provided by Cushing Terrell is as follows:
Phone:406-577-2772 146 Laura Louise Lane Bozeman,MT 59718 Fax:406-587-4282
Equal Opportunity Employer
DocuSign Envelope ID: E5ECDAAE-2B59-4558-80A1-25B3FF316375
K51
.Jackson
CONTRACTOR GROUP,/NC.
The Contract Documents are detailed as follows.The Draft Project Manual for the Bozeman Swim Center
dated February 2023 have been taken into consideration as reference only.
Discipline Drawn By Drawing No. Drawing Title Drawing Date Set Name
General Cushing Terrell G001 COVER 1/9/2023 Construction Documents-65%
General Cushing Terrell G100 ASSEMBLIES AND CODE INFORMATION 1/9/2023 Construction Documents-65%
Architectural Cushing Terrell A0o0 SITE PLAN 1/9/2023 Construction Documents-65%
Architectural Cushing Terrell A101 FLOOR PLAN 1/9/2023 Construction Documents-65%
Architectural Cushing Terrell A102 ROOF PLAN 1/9/2023 Construction Documents-65%
Architectural Cushing Terrell A103 ROOF DETAILS 1/9/2023 Construction Documents-65%
Architectural Cushing Terrell A201 EXTERIOR ELEVATIONS 1/9/2023 Construction Documents-65%
Narrative Cushing Terrell N1 Design Narrative 1 of 3 1/10/2023 Construction Documents-65%
Narrative Cushing Terrell N2 Design Narrative 2 of 3 1/10/2023 Construction Documents-65%
Narrative Cushing Terrell N3 Design Narrative 3 of 3 1/10/2023 Construction Documents-65%
Plumbing Cushing Terrell P0o1 PLUMBING SCHEDULES AND LEGENDS 1/9/2023 Construction Documents.65%
Plumbing Cushing Terrell PO10 PLUMBING DEMOLITION PLANS 1/9/2023 Construction Documents-65%
Plumbing Cushing Terrell P100 PLUMBING REMODEL PLANS 1/9/2023 Construction Documents-65%
Plumbing Cushing Terrell P400 PLUMBING DETAILS 1/9/2023 Construction Documents.65%
Structural DCI S1.1 GENERAL NOTES 1/9/2023 Construction Documents 65%
Structural DCI S1.2 GENERAL NOTES 1/9/2023 Construction Documents-65%
Structural DCI S1.3 SPECIAL INSPECTIONS 1/9/2023 Construction Documents-65%
Structural DCI S2.1 ROOF FRAMING PLAN 1/9/2023 Construction Documents-65%
Structural DCI S5.1 DETAILS 1/9/2023 Construction Documents-65%
Other scopes or work outside of what is listed above is unknown at this time, or has not yet been communicated to
Jackson.
Thank you and please let me know if there are any questions regarding this proposal.
Nick Van Tighem
Project Development Director
/e -
Jackson Contractor Group
Phone:406-577-2772 146 Laura Louise Lane Bozeman,MT 59718 Fax:406-587-4282
Equal Opportunity Employer
DocuSign Envelope ID: E5ECDAAE-2B59-4558-80A1-25B3FF316375
fo JacL-DIVTRAEkson
Bozeman Swim Center Phase 1
Executive Summary (updated March 2023)
This document summarizes the Bozeman Swim Center Phase 1 Permit 2 project. The project is located
at 1211 West Main Street, Bozeman, MT 59715.
The Contract Documents are detailed as follows.The Draft Project Manual for the Bozeman Swim Center
dated February 2023 have been taken into consideration as reference only.
Discipline Drawn By Drawing No. Drawing Title Drawing Date Set Name
General Cushing Terrell G001 COVER 1/9/2023 Construction Documents-65%
General Cushing Terrell G100 ASSEMBLIES AND CODE INFORMATION 1/9/2023 Construction Documents-65%
Architectural Cushing Terrell A000 SITE PLAN 1/9/2023 Construction Documents-65%
Architectural Cushing Terrell A101 FLOOR PLAN 1/9/2023 Construction Documents-65%
Architectural Cushing Terrell A102 ROOF PLAN 1/9/2023 Construction Documents-65%
Architectural Cushing Terrell A103 ROOF DETAILS 1/9/2023 Construction Documents-65%
Architectural Cushing Terrell A201 EXTERIOR ELEVATIONS 1/9/2023 Construction Documents-65%
Narrative Cushing Terrell N1 Design Narrative 1 of 3 1/10/2023 Construction Documents-65%
Narrative Cushing Terrell N2 Design Narrative 2 of 3 1/10/2023 Construction Documents-65%
Narrative Cushing Terrell N3 Design Narrative 3 of 3 1/10/2023 Construction Documents-65%
Plumbing Cushing Terrell P001 PLUMBING SCHEDULES AND LEGENDS 1/9/2023 Construction Documents-65%
Plumbing Cushing Terrell P010 PLUMBING DEMOLITION PLANS 1/9/2023 Construction Documents-65%
Plumbing Cushing Terrell P100 PLUMBING REMODEL PLANS 1/9/2023 Construction Documents-65%
Plumbing Cushing Terrell P400 PLUMBING DETAILS 1/9/2023 Construction Documents-65%
Structural DCI 51.1 GENERAL NOTES 1/9/2023 Construction Documents-65%
Structural DCI 51.2 GENERAL NOTES 1/9/2023 Construction Documents-65%
Structural DCI 51.3 SPECIAL INSPECTIONS 1/9/2023 Construction Documents-65%
Structural DCI 52.1 ROOF FRAMING PLAN 1/9/2023 Construction Documents-65%
Structural DCI 55.1 DETAILS 1/9/2023 Construction Documents-65%
Notable Risks and Challenges
• Shutdowns to the pool's public access will be necessary to complete certain scopes of work like
roof sheathing repair; however, these scopes are not currently quantifiable which can cause lead to
inaccurate timeframe estimations and frustrations with the public and staff.
• Many scopes have allowances or unforeseeable quantities which could impact actual cost and
schedule.
• A tight construction schedule coupled with a short window between permit and construction
necessitates that procurement will need to start and be fully complete prior to the first day of
construction to make the dates required by the client. This might require execution of contracts
prior to the building permit being issued to start the procurement process.
• Working in and around the occupied Swim Center will create noise, dust, debris, and general
inconveniences. Jackson Contractor Group and our subcontractors will endeavor to avoid
disturbing the occupants and staff to the greatest extent possible; however, it should be expected
that maintaining occupancy during this remodel will present challenges and issues beyond the
Contractor's control.
1
DocuSign Envelope ID: E5ECDAAE-2B59-4558-80A1-25B3FF316375
fo JacL-DIVTRAEkson
Notable Budget Assumptions/Clarifications/Exclusions
• 1% Bond has been added to the budget.
• Calculation Error on Roofing has been corrected. ($20k) error on previous budget.
• An allowance is being carried for 20% of the roof sheathing being replaced in the Roofing number
and an additional 10% is being carried as extra caution. Any savings or overages will be tracked and
submitted to the client upon completion of the scope.
• An allowance of manhours has been carried for the removal of the existing and abandoned
ductwork suspended from the truss system. Hours will be tracked, and any savings or overages will
be submitted to the client upon completion of the scope.
• An allowance is being carried for the Exterior Artwork Grid of$15,000
o Perimeter steel has been removed per Cushing Terrel Meeting
An allewance es being carried for heat tFace at the gutter and dewnspeuts ef$14T2-G&
o Removed per Feb 7, 2023 meeting.
• No electrical drawings have been provided so narrative scopes are the only means for estimating
electrical, fire alarm, or low voltage scopes.
dep-Med- ^^^cessaFy by the team We have identified one pipe needing insulation replaced.
• An allowance of$20,700 is carried in the budget for the vapor barrier and/or wall materials
between the BSD7 Building and the Swim Center Building.
• All special inspections have been excluded from the budget.
• At this point in time the project has not been issued a permit. Any changes to the Contract
Documents resulting from permit comments may result in changes to cost and schedule.
• No re-roofing and/or roofing repairs are anticipated at the Filter Room, Corridor to Bozeman
Highschool, Office, Entry, Lobby, or Locker Rooms.
• It is assumed that the City of Bozeman's Building Department will allow the building to be occupied
while the work is being performed under this permit and will allow the building to be vacated for
the identified scopes.
• No commissioning of any kind is anticipated as part of this scope of work.
• Any connection of new infrastructure to existing infrastructure cannot be guaranteed, and as such,
Contractor assumes no liability, nor makes any guarantees for inadequate existing infrastructure as
required for new installation.
• Roofing Subcontractor and mechanical Subcontractor will coordinate necessary details for 4" dryer
vent penetration.
• Installation of the siding system will stop at the northeast corner of the building; however, the
material for the entire scope as noted on sheet A101 is being carried in this budget for future
installation outside of this contract. Any and all materials to be procured in phase 1 for future
phases to be stored onsite.
• All work is to bound to prevailing wage determination 2023.
• Montana State Gross Receipts Tax (GRT) is assumed to be applicable to this project and is included
in the budget
• 8% overhead and profit applied to all direct costs is being carried as part of this budget.
• No performance and payment bonds are assumed for this project.
2
DocuSign Envelope ID: E5ECDAAE-2B59-4558-80A1-25B3FF316375
fo JacL-DIVTRAEkson
• 1% of the budget is accounted for procuring permits.
• A construction contingency of-5-OA 3.5% is being held in this budget. Construction Contingency can
be used for any construction related cost to include, but not limited to staffing and general
conditions, safety and quality control requirements, scheduling and expedition of work, scope gaps
and unforeseen cost overruns, material price increases, and any other construction related items
deemed necessary by the Contractor. Contingency usage shall be presented for approval to the
client prior to usage; however, authorization of said, use shall not be unreasonably withheld from
the Contractor.
• The plumbing budget carried was provided by a plumbing contractor, however, they have stated
they cannot perform the job due to timing. We are working with multiple other plumbing
companies to solidify a number and timing.
• Signage (interior @Rd is excluded from this budget, with the exception of lit Exit signs
which are included in the Electrical budget. An allowance of$20,000 has been included for exterior
signage.
• Possible established tree at SW corner of building may need to be trimmed or relocated to install
new siding. This can be added as an allowance once city arborist has been consulted. At this time
this work is excluded from the budget.
Budget Summary
Bid Package Current Estimate Notes
(01)General Conditions S 244,838.00 Removed Fencing
(06.0)Wood,Metals,Misc S 179,963.00 Modified structural positive connection detail.Removed Chem separation.
(07.0)Roofing $ 502034.00 Reduced to 30-year shingle
(07.1)EIFS Demo,New Siding and Insulation S 616,311.00 Potential$100k savings here
(09.0)Paint S 14,150.00 Added painting grilles and wall between school/pool center
(09.1)Finishes(Tile) $ 2,500.00
(22.0)Plumbing S 10,000.00
(26.0)Electrical $ 15,000.00
(32.0)Exterior Improvements S 22,969.00
Allowances
Exterior Artwork Grid S 15,000.00 Removed steel perimeter per meeting with Cushing Terrell
Demo Abandoned Ductwork S 20,000.00
Additional 10%sheathingreplacement S 8,692.00
Heat Trace(Not Applicable) S - Removed per meeting with Cushing Terrell
Exterior Signage $ 20,000.00 Added per meeting with Cushing Terrell
Vapor Barrier between BSD7 Building $ 20,700.00 Added per meeting with Cushing Terrell
Subtotal: S 1,692,157.00
Fees/Contingengy
Construction Contingency 3.5% S 59,226.00 Reduced to 3.5%from 5%
Permit Fees 1%construction S 16 922.00
Bond 1% _S 17,684A1li
Insurance 1% $ 17,684.00
GRT $ 19,693.00
Contractors Fee 8% S 145,870.00
Total Phase 1 Permit 2 Cost:1 $ 1,969,236.00
Jan 2023 Phase 1 Permit 2 Budget S 1,991,999.00
DELTA S (22,763.00)
Phase 1 Permit 1 Costl S 32,075.24 1 Includes Fees,Insurance,Etc-Paid to Date by City of Bozeman
Phase 1 Total Cost I $ 2,001,311.24
3
DocuSign Envelope ID: E5ECDAAE-2B59-4558-80A1-25B3FF316375
fo JacL-DIVTRAEkson
Budget Increases
The budget has increased due to the following:
• Added roof edge detail and gutters/downspouts.
- SO „eaF shingle. Cost has been reduced to 30-year shingle.
• Added vapor barrier below roof insulation.
• Roof Material costs have increased 5-10%.
• Added allowances for: Art, Demo Abandoned Ductwork, Additional 10% sheathing
replacement, and Weat Roofing contractor has included 20% sheathing replacement in
their proposal. Heat Trace allowance has been removed.
• Siding material to be used for phase 2 work.
• For the Exterior Assembly, if a closed cell foam is utilized as the insulation/vapor barrier there
will be $102,382 in savings.
• Subsurface concrete faced insulation supply/install and excavation/backfill at perimeter of
building.
Schedule
The project is set to start on May 1, 2023 and shall be substantially complete by Sept 28th, 2023. See
attached CPM for additional information. Total duration is 170 calendar days. All submittals need to be
complete in conjunction with Cushing Terrell to get materials ordered in time to meet this proposed
schedule.
4
DocuSign Envelope ID: E5ECDAAE-2B59-4558-80A1-25B3FF316375
K51
.Jackson
CONTRACTOR GROUP,/NC.
February 22, 2023
Max Ziegler
Facilities Project Coordinator
City of Bozeman
20 East Olive Street
Bozeman, Montana 59715
Dear Max,
In response to the City of Bozeman GCCM Services for the Bozeman Swim Center follow up request for proposal,
Jackson Contractor Group offers the following:
Please provide a full cost structure for the proposing firm to provide construction and contracting services covered
under the scope of services, including labor rates for all staff, and materials markup.
Senior Project Manager $126.00 per hour
Project Manager $96.14 per hour
Assistant Project Manager $88.10 per hour
Senior Superintendent $133.00 per hour
Project Superintendent $126.80 per hour
Assistant Superintendent $99.84 per hour
Senior Project Engineer $70.91 per hour
Project Engineer $65.78 per hour
Project Engineer IT $59.63 per hour
Apprentice Carpenter $50.87 per hour
Journeyman Carpenter $65.12 per hour
Carpenter Foreman $68.47 per hour
Laborer $45.55 per hour
All rates listed above are all-in rates inclusive of salary/wages,taxes, benefits, consumables,vehicles where applicable,
safety, etc.
For this project our GCCM Fee will be 8%, all cost of work, general conditions, insurance, contingencies, etc will have this
fee applied upon billing.
Jackson Contractor Group understands the scope of work for Phase 2 of the Swim Center to include:
Scope as provided by Cushing Terrell
• Install remainder of exterior siding. Materials purchased on Phase 1
• Replace all ceiling tiles with new cleanable tiles
• Resurface Pool
• Allowance of repairs of pool inlets and drain grates
Phone:406-577-2772 146 Laura Louise Lane Bozeman,MT 59718 Fax:406-587-4282
Equal Opportunity Employer
DocuSign Envelope ID: E5ECDAAE-2B59-4558-80A1-25B3FF316375
K51
.Jackson
CONTRACTOR GROUP"/NC.
• Replace gutter coping with HDPE grating
• Replace all tile, oxidize substrate, support existing decks
• Remove and replace existing natatorium HVAC System (re-use fabric duct)
• Replace all lighting fixtures and controls throughout
• Replace MAU, Exhaust Fans, PTAC;TAB, Controls, CX(by others)
Other scope:
• Preconstruction Services for Phase 2
Other scopes or work outside of what is listed above is unknown at this time, or has not yet been communicated to
Jackson.
Thank you and please let me know if there are any questions regarding this proposal.
Nick Van Tighem
Project Development Director
Jackson Contractor Group
Phone:406-577-2772 146 Laura Louise Lane Bozeman,MT 59718 Fax:406-587-4282
Equal Opportunity Employer