HomeMy WebLinkAbout24 - Professional Services Agreements - Sanbell - Field Survey Term Contract Docusign Envelope ID:93E016E0-7802-4216-8994-952FCF1B9411
d�Z
p
'et�r�a►oo.yo���
FOURTH AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT
THIS FOURTH AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT
FOR Field Survey Term Contract dated July 12, 2022 (the "Agreement") is made and entered
into this 3rd day of December , 2024, by and between the CITY OF BOZEMAN,
MONTANA,a self-governing municipal corporation organized and existing under its Charter and
the laws of the State of Montana, 121 North Rouse Street, Bozeman, Montana, with a mailing
address of PO Box 1230, Bozeman, MT 59771, hereinafter referred to as "City," and Sanbell,
106 E Babcock Street, Suite L1, Bozeman, MT 59718 hereinafter referred to as "Contractor."
In consideration of the mutual covenants and agreements herein contained, the receipt and
sufficiency whereof being hereby acknowledged,the parties hereto agree to amend the Agreement
as follows:
1. Addition to Scope of Work. Attached Amendment No.4
1. Addition to Payment. Attached Rate Schedule
2. Agreement still valid. All remaining terms and provisions of the original Agreement
remain valid.
xxxx END OF AGREEMENT EXCEPT FOR SIGNATURES ****
Third Amendment to Professional Services Agreement for Field Survey Term Contract
Page 1 of 2
Docusign Envelope ID:93E016E0-7802-4216-8994-952FCF1B9411
IN WITNESS WHEREOF, the parties hereto have executed this instrument the day and
year first above written.
CITY OF BOZEMAN,MONTANA SANDERSON STEWART
Signed by:
Signed by: Signed Signed by:
By l IN v" 4:.N88�0�: By Fv 'U' S'�'rF
Chuck Winn, City Manager Print Name: Danielle Scharf
Title: Principal/Region Manager
APPROVED AS TO FORM
B FSigned by:
S16VAJ,
876992AC9ACA44B...
Greg Sullivan, Bozeman City Attorney
Third Amendment to Professional Services Agreement for Field Survey Term Contract
Page 2 of 2
Docusign Envelope ID:93E016E0-7802-4216-8994-952FCF1B9411
(/*) sanbell
AMENDMENT TO SERVICES
AGREEMENT — NO. 4
1. PROJECT/SERVICES AGREEMENT INFORMATION
Effective Date of Original Services Agreement: 07/12/22
Project Name: City of Bozeman 2022 CIP Survey
Project Number: 22166
Client Name: City of Bozeman,Montana
2. NATURE OF AMENDMENT
✓❑ Modifications to Sanbell scope of work and/or contract fee amount
❑ Modifications to Sub-consultant scope of work and/or contract fee amount
❑ Modifications to project schedule
3. DESCRIPTION OF SERVICES AGREEMENT MODIFICATIONS
Full topography survey of a portion of S Grand Ave per attached exhibit "S Grand Sewer Renovations".
Full topography survey of a portion of Marwyn Addition per attached exhibit "Marwyn Addition - Sewer
Renovation".
Full topography survey of a portion of East Harrison St per attached exhibit.
4. FEE MODIFICATIONS
Original services agreement fee: $ 43,450.00
Total fees for prior Amendments: $ 61,016.00
Total services agreement fee with prior Amendments: $ 104,466.00
Proposed fee for this Amendment: $ 21,000.00 Not to Exceed
Total services agreement fee with all Amendments: $ 125,466.00 Not to Exceed
Client and Sanbell hereby agree to modify the above-referenced Services Agreement as set forth in
this Amendment. All provisions of the Services Agreement not specifically modified by this or any
prior Amendments shall remain in effect.The effective date of this Amendment shall be the
signature date of the Client as shown below.
CLIENT L
ned by: SANBELL Signed by:
Signature: (Av" Signature: Pawdtt, S"Y
Pri nted: Chuck Winn Printed: Danielle Scharf
Title: City Manager Title: Principal/Bozeman Region Manager
Date: 12/4/2024 Date: 12/4/2024
AMEND.TO SERVICES AGREE. PAGE 1 OF 1 JULY 2024
Docusign Envelope ID:93E016E0-7802-4216-8994-952FCF1B9411
BOZEMANMT S Grand Sewer Renovations
r P
r
T 7Stryet Names
7 mits Imagery
r _ Low Resolution 15m Imagery
High Resolution 60cm Imagery
High Resolution 30cm Imagery
i
I r: • ,� �, Citations
r cn� 1.2m Resolution Metadata
� T
survey limits
-TJ
I I
1
! 1! f. �
f
f
T
ti
•R w
o'
r •-
�Y f
f frr !
t.
T A
rk
Created By:
of
Created For:
Date: 11/13/2024
This product is for informational purposes and may not have been
prepared for,or be suitable for legal,engineering,or surveying purposes.
466 0 233 466 O Users of this information should review or consult the primary data and
information sources to ascertain the usability of the information.
Feet
Docusign Envelope ID:93E016E0-7802-4216-8994-952FCF1B9411
BOZEMANMT Marwyn Addition - Sewer Renovation
`r t MQir— V- = ,� .` 1r F r f 7
7Stryeetmames
Cit Liits
" s World Imagery
Ole", ` Low Resolution 15m Imagery
High Resolution 60cm Imagery
High Resolution 30cm Imagery��:
T .
e ( Citations
` —_ - 1.2m Resolution Metadata
A �► - f 0 survey limits
w
I �
Location
1
N ►��
Created By:
Created For:
Date: 11/13/2024
dFR 0 233 466 O This product is for informational purposes and may not have been prepared for,or be suitable for legal, engineering, or
surveying purposes. Users of this information should review or consult the primary data and information sources to
Feet ascertain the usability of the information.
Docusign Envelope ID:93E016E0-7802-4216-8994-952ICHB94111jlmqpw�7w" - — i �� !' IK ��".- �' " N'1«
r t
'� ,.- -�•� � •,�..,� `, ,}_, ilk
ALL ` •��
.�- , .og
•.(
r Ar#
• .,.lam`, -- f`-, • A I » �. •� �i,�-!I
' 1
PIF
Survey i U, f
Limits Q /P-
IT
co
%fir
1.- rA" J r
f4.*- -.
o '
Docusign Envelope ID:93E016E0-7802-4216-8994-952FCF1B9411
CHARGE OUT RATES
ROCKY MOUNTAIN sanubell
EFFECTIVE AUGUST 17, 2024
Intelligent Infrastructure. Enduring Communities.
STAFF PERSONNEL SERVICES TRAFFIC DATA COLLECTION SERVICES
Staff Engineer I $115.00/hour Standard Intersection Count(veh/bike/ped) $30.00/hour
Staff Engineer II $130.00/hour Small Roundabout Count(veh/bike/ped) $41.00/hour
Staff Engineer III $135.00/hour Large Roundabout Count(veh/bike/ped) $93.00/hour
Landscape Designer I $105.00/hour Spot Location Volume(veh/bike/ped) $4.00/lane/hour
Landscape Designer II $115.00/hour Spot Location Travel Speeds(veh) $5.00/lane/hour
Landscape Designer III $125.00/hour Data Collection Equipment $30.00/count location
Landscape Architect I $135.00/hour Rushed Processing(24-hour turnaround) $9.00/processing hour
Landscape Architect II $145.00/hour
Senior Landscape Architect I $165.00/hour
Senior Landscape Architect II $175.00/hour SURVEY CREW SERVICES
Staff Planner I $100.00/hour
Staff Planner II $115.00/hour
1-Person/2-Person Crew Per Job
Planner I $130.00/hour
Planner II $145.00/hour Survey Equipment $30.00 /fieldwork hour
Senior Planner I $155.00/hour Survey Vehicle Mileage IRS rate/mile+$0.10/mile
Senior Planner II $195.00/hour Scanner Equipment $150.00/hour
Senior Planner Manager $205.00/hour Scanner Equipment (full day) $1,050/day
Right-of-Way Agent $168.00/hour
Project Engineer I $145.00/hour
Project Engineer II $155.00/hour OUTSIDE CONSULTANTS
Senior Engineer I $190.00/hour
Senior Engineer II $195.00/hour 1) At cost if independently billed direct to client
Senior Engineer Manager $210.00/hour 2) Cost plus 5% if billed through us
Principal $250.00/hour
Expert Witness/Special Consultant $290.00/hour
Engineer Intern $90.00/hour
Field Survey Technician I $85.00/hour INDEPENDENT LABORATORIES
Field Survey Technician II $88.00/hour
Staff Surveyor I $115.00/hour 1) At cost if independently billed direct to client
Staff Surveyor II $130.00/hour 2) Cost plus 5% if billed through us
Professional Land Surveyor I $140.00/hour
Professional Land Surveyor II $150.00/hour
Senior Professional Land Surveyor I $160.00/hour ADMINISTRATIVE EXPENSES
Senior Professional Land Surveyor II $180.00/hour
Construction Inspector $88.00/hour
Construction Engineering Tech. $100.00/hour Administrative Expenses 3.5%*
Including copies, prints, phone, postage, materials, and travel
Senior Construction
Engineering Technician $145.00/hour *Based on professional services only,unless modified by contract
Construction Engineer I $145.00/hour
Construction Engineer II $150.00/hour Vehicle Mileage IRS Rate
CADD Technician I $100.00/hour
CADD Technician II $105.00/hour
Designer I $107.00/hour
Designer II $110.00/hour
Senior Designer I $120.00/hour
Senior Designer II $145.00/hour
Senior Designer Manager $165.00/hour
Project Administrator $100.00/hour
Senior Project Administrator $115.00/hour
Administrative/Clerical $90.00/hour
Senior Administrative/Clerical $115.00/hour
Senior Administrative Director $185.00/hour These rates are updated periodically to reflect
Graphic Artist $115.00/hour market conditions. Rate increases will be reflected
Marketing Coordinator $120.00/hour
Senior Marketing Coordinator $130.00/hour in future invoicing.
Marketing Director $185.00/hour