HomeMy WebLinkAbout24 - Professional Services Agreements - Jackson Contractor Group - Swim Center Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 d�Z p 'et�r�a►oo.yo��� 4TH AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT THIS 4TH AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT FOR Swim Center Renovation GC/CM Services dated March 21', 2023, (the "Agreement") is made and entered into thiS6th day of August , 2024, by and between the CITY OF BOZEMAN, MONTANA, a self governing municipal corporation organized and existing under its Charter and the laws of the State of Montana, 121 North Rouse Street,Bozeman,Montana,with a mailing address of PO Box 1230, Bozeman, MT 59771, hereinafter referred to as "City," and Jackson Contractor Group, 146 Laura Louise Ln, Bozeman, MT 59718 hereinafter referred to as "Contractor." In consideration of the mutual covenants and agreements herein contained, the receipt and sufficiency whereof being hereby acknowledged,the parties hereto agree to amend the Agreement as follows: 1. Scope of Services. Section 3 of the Original Agreement is amended to include the scope of services and fees specified in Swim Center Prime Contract Change Orders #5 and #6, attached to this Amendment as Exhibit A and Exhibit B. Exhibits A and B include the acceptance of approved Phase 2 project change orders, allocation of contingency funds, and closing of project allowances. The services included in Exhibits A and B are in addition to and supplement the Scope of Services in the Original Agreement. The acceptance of these Prime Contract Change Orders will result in no change ($0) to the overall contract Guaranteed Maximum Price. 2. Agreement still valid.All remaining terms and provisions of the Agreement remain valid. **** END OF AGREEMENT EXCEPT FOR SIGNATURES **** 4TH Amendment to Professional Services Agreement for Swim Center GC/CM Services FY 2023—FY 2025 Page 1 of 2 Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 IN WITNESS WHEREOF, the parties hereto have executed this instrument the day and year first above written. CITY OF BOZEMAN,MONTANA JACKSON CONTRACTOR GROUP Signed by: (--'�R': . Signed by: Signed bB l Wlln.bLBy y EFB3C0481E254B8_ 6098s0919BDA472... Michael Chase Chuck Winn,Acting City Mangger Print Name: Title: SR PROJECT MANAGER APPROVED AS TO FORM By FSigned by: Sty.( IIJI 876992AC9ACA44B... Greg Sullivan, Bozeman City Attorney 4TH Amendment to Professional Services Agreement for Swim Center GC/CM Services FY 2023—FY 2025 Page 2 of 2 Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 0A PCCO #005 Jackson COMRAC70R GROUP,VVC. Bozeman Office Project: 03202202 - City of Bozeman Construction Services Contracts 146 Laura Louise Ln 20 East Olive Street Bozeman,Montana 59718 Bozeman,Montana 59715 Phone: (406)577-2772 Phone: 406-595-8470 Fax: (406)587-4282 Prime Contract Change Order #005: May 2024 Approved PCO's TO: City of Bozeman FROM: Jackson Contractor Group,Inc. PO Box 1230 PO Box 967 Bozeman,Montana 59771-1230 Missoula Montana 59806 DATE CREATED: 5/21 /2024 CREATED BY: Colton Morgan(Jackson Contractor Group, Inc.) CONTRACT STATUS: Pending-In Review REVISION: 0 DESIGNATED REVIEWER: Colton Morgan(Jackson Contractor Group, REVIEWED BY: Inc.) DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: SCHEDULEIMPACT: EXECUTED: No CONTRACT FOR: 03202202-01:City of Bozeman Swim Center TOTAL AMOUNT: $0.00 DESCRIPTION: See below the listed approved PCO's for May 2024. Approved PCO's #25 #26 #27 #28 #29 #30 #31 #32 #33 #34 #35 ATTACHMENTS: PCO#035-Credit Flat Siding from PCO#24-Signed.pdf PCO#033-Replace Pool Shell Lights.pdf PCO#034-Wainscot Wall Change Added ADA Grab Bar-Signed.pdf PCO#032-Concrete Pad Design 5.15.24-Signed.pdf PCO#025-PH2 Allowance-Boiler Pump and Expansion Tank- Signed(1).pdf PCO#31 -Temporarily Reroute Gas Line.pdf PCO#030-PH2 Allowance-Mechancal Fencingpdf PCO#026-PH2 Allowance- Bath Accessories-Signed(1).pdf PCO#028-Phase 2 Permit Drawings Specifications Update Door Hardware Group#002-Signed(1).pdf PCO #027-PH2 Allowance-Downspout Removal and Replacement-Signed(1).pdf PCO#029-Phase 2 Permit Drawings Specifications Update Door Hardware Group#002(002)(1).pdf This proposal is based on the usual cost elements such as labor,material,and normal mark ups,and does not include any amount for changes in the sequence or work delays,disruption,rescheduling,extended overhead,acceleration and or impacts,and the right is expressly reserved to make claim for any and all of these related items of cost prior to any final settlement of the contract. POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO# Title Schedule Impact Amount 025 PH2 Allowance-Boiler,Pump,and Expansion Tank 0 days 0.00 026 PH2 Allowance-Bath Accessories 0 days 0.00 027 PH2 Allowance-Downspout Removal and Replacement 0 days 0.00 Bozeman Office page 1 of 5 Printed On:6/3/2024 08:55 AM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 KI PCCO #005 Jackson CONMACIOR GROUP,NW. 028 Phase 2 Permit Drawings&Specifications Update Door Hardware 0 days 0.00 Group#002 29 Replace Worn Flushing Valves 0 days 0.00 30 PH2 Allowance-Mechanical Equipment Fencing 0 days 0.00 31 Temporarily Reroute Bozeman High Gas Line 0.00 32 Dehumidifier Concrete Pad Design 0.00 33 Replace Pool Shell Lights 0.00 34 Wainscot Wall Change&Added ADA Grab Bar Per City Review 0.00 35 Credit Flat Siding from PCO#024 0.00 TOTAL: $0.00 CHANGE ORDER LINE ITEMS: PCO#025: PH2 Allowance-Boiler,Pump,and Expansion Tank # SubJob Cost Code Description Type Amount All Labor and materials to disconnect,remove,and haul away the existing boiler.Remove existing piping needed to accomplish 1 03 Bozeman Swim Center-Ph 2 22-0001-PLUMBING COMPLETE plans on drawing 2M400.Furnish and install boiler,expansion Subcontract $89,400.00 tank,air separator,and all related equipment and piping for the system per plans and specifications. All Labor and materials to disconnect,remove,and haul away 17-0008-BOILER,PUMPT& the existing boiler.Remove existing piping needed to accomplish 2 03 Bozeman Swim Center-Ph 2 EXPANSION TANK plans on drawing 2M400.Furnish and install boiler,expansion Other ($90,000.00) tank,air separator,and all related equipment and piping for the system per plans and specifications. 3 03 Bozeman Swim Center-Ph 2 01-2116-CONTINGENCY Move remaining$600 from Boiler Allowance to Contingency Other $600.00 Subtotal: $0.00 Insurance:1.00%Applies to all line item types. 0.00 Contractor's Fee:8.00%Applies to all line item types. 0.00 GRT:1.00%Applies to all line item types. 0.00 Grand Total: PCO#026:PH2 Allowance-Bath Accessories # SubJob Cost Code Description Type Amount 10-1400-JACKSON SELF- Procure&Install 2-EA toilet paper dispensers,2-EA soap 1 03 Bozeman Swim Center-Ph 2 PERFORM dispensers,and 2-EA paper towel dispensers per plans and Subcontract $600.00 specifications. 2 03 Bozeman Swim Center-Ph 2 17-0009-BATH ACCESSORIES Remove funding from allowance budget. Other ($1,000.00) 3 03 Bozeman Swim Center-Ph 2 01-2116-CONTINGENCY Move remaining funding to contingency Other $400.00 Subtotal: $0.00 Insurance:1.00%Applies to all line item types. 0.00 Contractor's Fee:8.00%Applies to all line item types. 0.00 GRT:1.00%Applies to all line item types. 0.00 Grand Total: $0.00 PCO#027: PH2 Allowance-Downspout Removal and Replacement # SubJob Cost Code Description Type Amount 1 03 Bozeman Swim Center-Ph 2 17-0006-DOWNSPOUT REMOVAL Downspout Allowance Other ($5,000.00) AND REPLACEM 2 03 Bozeman Swim Center-Ph 2 07-7200-ACE ROOFING Remove and reinstall downspouts at East Elevation Subcontract $4,234.00 3 03 Bozeman Swim Center-Ph 2 01-2116-CONTINGENCY Balance of Allowance to Contingency Other $766.00 Subtotal: $0.00 Insurance:1.00%Applies to all line item types. 0.00 Contractor's Fee:8.00%Applies to all line item types. 0.00 GRT:1.00%Applies to all line item types. 0.00 Grand Total: $0.00 Bozeman Office page 2 of 5 Printed On:6/3/2024 08:55 AM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 KI PCCO #005 Jackson iCOWMArTDR GROUP,MC. PCO#028:Phase 2 Permit Drawings&Specifications Update Door Hardware Group#002 # SubJob Cost Code Description Type Amount 1 03 Bozeman Swim Center-Ph 2 08-1300-METAL DOORS Price Increase to change from Hardware Group#001 to#002 Subcontract $910.00 2 03 Bozeman Swim Center-Ph 2 01-2116-CONTINGENCY Contingency to cover price increase to change from Hardware Other ($910.00) Group#001 to#002 Subtotal: $0.00 Insurance:1.00%Applies to all line item types. 0.00 Contractor's Fee:8.00%Applies to all line item types. 0.00 GIRT:1.00%Applies to all line item types. 0.00 Grand Total: $0.00 PCO#29 : Replace Worn Flushing Valves # SubJob Cost Code Description Type Amount Furnish six(6)Sloan 111 manual flushometer valves for toilets in 1 03 Bozeman Swim Center-Ph 2 22-0001-PLUMBING COMPLETE men's and women's restrooms.Furnish two(2)Sloan 186 Subcontract $1,475.00 manual flushometer valves for urinals in men's restroom. 2 03 Bozeman Swim Center-Ph 2 01-2116-CONTINGENCY Contingency Draw Other ($1,475.00) Subtotal: $0.00 Insurance:0.00%Applies to all line item types. 0.00 Contractor's Fee:0.00%Applies to all line item types. 0.00 GRT:0.00%Applies to all line item types. 0.00 Grand Total: $0.00 PCO#30: PH2 Allowance-Mechanical Equipment Fencing # SubJob Cost Code Description Type Amount Procure and install 41.5 linear feet of 6'tall chainlink fence with 1 03 Bozeman Swim Center-Ph 2 01-5626-TEMP FENCING 1-EA 4'wide access gate as shown in the attached drawing. Subcontract $3,762.00 Fence posts are to be core drilled in concrete footings. 2 03 Bozeman Swim Center-Ph 2 01-5626-TEMP FENCING Demo and dispose of existing fence,posts,and gates.2 Guys Labor $773.64 for 6 hours. 3 03 Bozeman Swim Center-Ph 2 17-0003-MECHANICAL Fund from Allowance Other EQUIPMENT FENCING ($10,000.00) 4 03 Bozeman Swim Center-Ph 2 01-2116-CONTINGENCY Move Remaining Money to Contingency Other $5,464.36 Subtotal: $0.00 Insurance:1.00%Applies to all line item types. 0.00 Contractor's Fee:8.00%Applies to all line item types. 0.00 GRT:1.00%Applies to all line item types. 0.00 Grand Total: $0.00 PCO#31 :Temporarily Reroute Bozeman High Gas Line # SubJob Cost Code Description Type Amount 1 03 Bozeman Swim Center-Ph 2 22-0001-PLUMBING COMPLETE Procure and install a temporary gas line from the Northeast Subcontract $2,656.00 meter to the school connection to the South. 2 03 Bozeman Swim Center-Ph 2 01-2116-CONTINGENCY Contingency Draw Other ($2,656.00) Subtotal: $0.00 Insurance:0.00%Applies to all line item types. 0.00 Contractor's Fee:0.00%Applies to all line item types. 0.00 GRT:0.00%Applies to all line item types. 0.00 Grand Total: $0.00 Bozeman Office page 3 of 5 Printed On:6/3/2024 08:55 AM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 KI PCCO #005 Jackson iCONMACIOR GROUP,MC. PCO#32: Dehumidifier Concrete Pad Design # SubJob Cost Code Description Type Amount 1 03 Bozeman Swim Center-Ph 2 03-1150-DASILVA CONCRETE Additional 5 Yards of concrete at$185/YD for the House Subcontract $925.00 Keeping Pad, 2 03 Bozeman Swim Center-Ph 2 01-2116-CONTINGENCY Contingency Draw Other ($925.00) Subtotal: $0.00 Insurance:1.00%Applies to all line item types. 0.00 Contractor's Fee:8.00%Applies to all line item types. 0.00 GIRT:1.00%Applies to all line item types. 0.00 Grand Total: $0.00 PCO#33 : Replace Pool Shell Lights # SubJob Cost Code Description Type Amount Remove and replace 20-EA Pool Shell lights.Lights are provided 26-0001-SES ELECTRICAL by the owner.Pricing assumes owner-provided fixtures are a 1 03 Bozeman Swim Center-Ph 2 COMPLETE direct,screw-in replacement and no modifications to existing Subcontract $3,600.00 housing are necessary for fitment and or sealing of pool shell and existing light housings. 2 03 Bozeman Swim Center-Ph 2 01-2116-CONTINGENCY Contingency Draw Other ($3,600.00) Subtotal: $0.00 Insurance:1.00%Applies to all line item types. 0.00 Contractor's Fee:8.00%Applies to all line item types. 0.00 GRT:1.00%Applies to all line item types. 0.00 Grand Total: PCO#34:Wainscot Wall Change&Added ADA Grab Bar Per City Review # SubJob Cost Code Description Type Amount 1 03 Bozeman Swim Center-Ph 2 09-6800-PIERCE TILING Procure and install additional wall tile per details 7/2A102 and Subcontract $432.00 8/2A102. 2 03 Bozeman Swim Center-Ph 2 22-0001-PLUMBING COMPLETE Procure and install 1-EA 18"grab bar per detail 8/2A102. Subcontract $96.00 3 03 Bozeman Swim Center-Ph 2 01-2116-CONTINGENCY Contingency Draw Other ($528.00) Subtotal: $0.00 Insurance:1.00%Applies to all line item types. 0.00 Contractor's Fee:8.00%Applies to all line item types. 0.00 GRT:1.00%Applies to all line item types. 0.00 Grand Total: PCO#35:Credit Flat Siding from PCO#024 # SubJob Cost Code Description Type Amount 1 03 Bozeman Swim Center-Ph 2 07-4623-DIVISION 7 SIDING Credit Flat Siding Credit from PCO#024 Subcontract ($4,800.00) 2 03 Bozeman Swim Center-Ph 2 01-2116-CONTINGENCY Contingency Other $4,800.00 Subtotal: $0.00 Insurance:1.00%Applies to all line item types. 0.00 Contractor's Fee:8.00%Applies to all line item types. 0.00 GRT:1.00%Applies to all line item types. 0.00 Grand Total: $0.00 The original(Contract Sum) $ 5,036,097.68 Net change by previously authorized Change Orders $434,678.12 The contract sum prior to this Change Order was $ 5,470,775.80 The contract sum would be changed by this Change Order in the amount of $ 0.00 The new contract sum including this Change Order will be $ 5,470,775.80 The contract time will not be changed by this Change Order Bozeman Office page 4 of 5 Printed On:6/3/2024 08:55 AM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 0 PCCO #005 Jar ksnn COIYTR"eirmR GROUP,Mr. Ali Vasarella(Cushing Terrell-Missoula) City of Bozeman Jackson Contractor Group,Inc. 306 W Railroad Street,Ste 104 PO Box 1230 PO Box 967 Missoula Montana 59802 Bozeman Montana 59771-1230 Missoula Montana 59806 11 1pal/�j //;07/03/2024 awn 7i1 si2o24 T DATE SIGNATURE DATE SIGNATURE DATE Bozeman Office page 5 of 5 Printed On:6/3/2024 08:55 AM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 0 0 PCO #025 Jackson rMArM/iCTOR GROUP,Nw. Bozeman Office Project:03202202-City of Bozeman Construction Services Contracts 146 Laura Louise Ln 20 East Olive Street Bozeman, Montana 59718 Bozeman, Montana 59715 Phone:(406)577-2772 Phone:406-595-8470 Fax:(406)587-4282 Prime Contract Potential Change Order #025: PH2 Allowance - Boiler, Pump, and Expansion Tank TO: City of Bozeman FROM: Jackson Contractor Group, Inc. PO Box 1230 PO Box 967 Bozeman Montana,59771-1230 Missoula Montana,59806 PCO NUMBER/REVISION: 025/0 CONTRACT- 03202202-01 -City of Bozeman Swim Center REQUEST RECEIVED FROM: Robert Abbott (Blind Squirrel,LLC(Abbott CREATED BY: Colton Morgan (Jackson Contractor Group, Plumbing)) Inc.) STATUS: Draft CREATED DATE: 4/8/2024 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: Bozeman Swim Center ACCOUNTING Amount Based METHOD: SCHEDULE IMPACT- 0 days PAID IN FULL: No TOTAL AMOUNT- $0.00 POTENTIAL CHANGE ORDER TITLE: PH2 Allowance-Boiler, Pump,and Expansion Tank CHANGE REASON:Allowance POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE#040-PH2 Allowance-Boiler Pump and Expansion Tank $90,000 allowance for Boiler equipment and installation. Abbott Plumbing:$89 400 All Labor and materials to disconnect,remove,and haul away the existing boiler.Remove existing piping needed to accomplish plans on drawing 2M400. Furnish and install boiler,expansion tank,air separator,and all related equipment and piping for the system per plans and specifications. ATTACHMENTS: Swim Center Boiler Proposal.pdf # SubJob Cost Code Description Type Amount All Labor and materials to disconnect,remove,and haul away 17-0008-BOILER,PUMPT& the existing boiler.Remove existing piping needed to accomplish 1 03 Bozeman Swim Center-Ph 2 EXPANSION TANK plans on drawing 2M400.Furnish and install boiler,expansion Other $89,400.00 tank,air separator,and all related equipment and piping for the system per plans and specifications. 17-0008-BOILER,PUMPT& All Labor and materials to disconnect,remove,and haul away 2 03 Bozeman Swim Center-Ph 2 Other ($90,000.00) EXPANSION TANK the existing boiler.Remove existing piping needed to accomplish Bozeman Office page 1 of 2 Printed On:4/9/2024 07:39 AM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 0 PCO #025 Jarkson Unit/ "eirmR GROUP,VW. plans on drawing 2M400.Furnish and install boiler,expansion tank,air separator,and all related equipment and piping for the system per plans and specifications. 3 03 Bozeman Swim Center-Ph 2 01-2116-CONTINGENCY Move remaining$600 from Boiler Allowance to Contingency Other $600.00 Subtotal: $0.00 Insurance:1.00%Applies to all line item types. $0.00 Contractor's Fee:8.00%Applies to all line item types. $0.00 GIRT:1.00%Applies to all line item types. $0.00 Grand Total: $0.00 Ali Vasarella(Cushing Terrell-Missoula) City of Bozeman Jackson Contractor Group,Inc. 306 W Railroad Street,Ste 104 PO Box 1230 PO Box 967 Missoula Montana 59802 Bozeman Montana 59771-1230 Missoula Montana 59806 05/13/2024 �Z_— 4/25/24 IG ATU E DATE SIGNATURE DATE SIGNATURE DATE Bozeman Office page 2 of 2 Printed On:4/9/2024 07:39 AM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 0 0 PCO #026 Jackson CONTRACTOR GROUP,Nw. Bozeman Office Project:03202202-City of Bozeman Construction Services Contracts 146 Laura Louise Ln 20 East Olive Street Bozeman, Montana 59718 Bozeman, Montana 59715 Phone:(406)577-2772 Phone:406-595-8470 Fax:(406)587-4282 Prime Contract Potential Change Order #026: PH2 Allowance - Bath Accessories TO: City of Bozeman FROM: Jackson Contractor Group, Inc. PO Box 1230 PO Box 967 Bozeman Montana,59771-1230 Missoula Montana,59806 PCO NUMBER/REVISION: 026/0 CONTRACT- 03202202-01 -City of Bozeman Swim Center REQUEST RECEIVED FROM: Colton Morgan (Jackson Contractor Group, CREATED BY: Colton Morgan (Jackson Contractor Group, Inc.) Inc.) STATUS: Draft CREATED DATE: 4/8/2024 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: Bozeman Swim Center ACCOUNTING Amount Based METHOD: SCHEDULE IMPACT- 0 days PAID IN FULL: No TOTAL AMOUNT- $0.00 POTENTIAL CHANGE ORDER TITLE: PH2 Allowance-Bath Accessories CHANGE REASON:Allowance POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE#041 -PH2 Allowance-Bath Accessories $1,000 allowance for bath accessories at the added family restrooms. 2-EA toilet paper dispensers,2-EA soap dispensers,and 2-EA paper towel dispensers were added to the permit set of drawings dated 3/5/2024. Jackson:$600 Install 2-EA toilet paper dispensers,2-EA soap dispensers,and 2-EA paper towel dispensers per plans and specifications.The accessories listed above provided by owner. ATTACHMENTS: Swim Center PCO#026-Bathroom Accessory Jackson Quote.pdf_ # SubJob Cost Code Description Type Amount Procure&Install 2-EA toilet paper dispensers,2-EA soap 1 03 Bozeman Swim Center-Ph 2 10-2816-BATH ACCESSORIES dispensers,and 2-EA paper towel dispensers per plans and Subcontract $600.00 specifications. 2 03 Bozeman Swim Center-Ph 2 17-0009-BATH ACCESSORIES Remove funding from allowance budget. Other ($1,000.00) 3 03 Bozeman Swim Center-Ph 2 01-2116-CONTINGENCY Move remaining funding to contingency Other $400.00 Bozeman Office page 1 of 2 Printed On:4/9/2024 09:52 AM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 0 PCO #026 Jar ksnn CONTRACTOR 6RULIP,Vw. Subtotal: $0.00 Insurance:1.00%Applies to all line item types. $0.00 Contractor's Fee:8.00%Applies to all line item types. $0.00 GIRT:1.00%Applies to all line item types. $0.00 Grand Total: $0.00 Ali Vasarella(Cushing Terrell-Missoula) City of Bozeman Jackson Contractor Group,Inc. 306 W Railroad Street,Ste 104 PO Box 1230 PO Box 967 Missoula Montana 59802 Bozeman Montana 59771-1230 Missoula Montana 59806 I 05/13/2024 y 4/25/24 I T DATE SIGNATURE DATE SIGNATURE DATE Bozeman Office page 2 of 2 Printed On:4/9/2024 09:52 AM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 0 0 PCO #027 Jackson rMArm.'eil GROUP,Nw. Bozeman Office Project:03202202-City of Bozeman Construction Services Contracts 146 Laura Louise Ln 20 East Olive Street Bozeman, Montana 59718 Bozeman, Montana 59715 Phone:(406)577-2772 Phone:406-595-8470 Fax:(406)587-4282 Prime Contract Potential Change Order #027: PH2 Allowance - Downspout Removal and Replacement TO: City of Bozeman FROM: Jackson Contractor Group, Inc. PO Box 1230 PO Box 967 Bozeman Montana,59771-1230 Missoula Montana,59806 PCO NUMBER/REVISION: 027/0 CONTRACT- 03202202-01 -City of Bozeman Swim Center REQUEST RECEIVED FROM: Jody Roberts (ACE Roofing,LLC) CREATED BY: Colton Morgan (Jackson Contractor Group, Inc.) STATUS: Draft CREATED DATE: 4/8/2024 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: Bozeman Swim Center ACCOUNTING Amount Based METHOD: SCHEDULE IMPACT- 0 days PAID IN FULL: No TOTAL AMOUNT- $0.00 POTENTIAL CHANGE ORDER TITLE: PH2 Allowance-Downspout Removal and Replacement CHANGE REASON:Allowance POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE#039-PH2 Allowance-Downspout Removal and Replacement $5,000 allowance to remove and re-install downspouts for exterior work on the East elevation. Ace Roofing: • $4,234 to remove and reinstall downspouts. • Material to be stored onsite and re-used. ATTACHMENTS: RE_Swim Center Phase 2 Contract_Submittal Register&Pay Application.msg_ # SubJob Cost Code Description Type Amount 1 03 Bozeman Swim Center-Ph 2 17-0006-DOWNSPOUT REMOVAL Downspout Allowance Other ($5,000.00) AND REPLACEM 2 03 Bozeman Swim Center-Ph 2 07-7200-ACE ROOFING Remove and reinstall downspouts at East Elevation Subcontract $4,234.00 3 03 Bozeman Swim Center-Ph 2 01-2116-CONTINGENCY Balance of Allowance to Contingency Other $766.00 Bozeman Office page 1 of 2 Printed On:4/9/2024 07:42 AM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 0 PCO #027 Jarkson CONTRACTOR 6RULIP,Vw. Subtotal: $0.00 Insurance:1.00%Applies to all line item types. $0.00 Contractor's Fee:8.00%Applies to all line item types. $0.00 GIRT:1.00%Applies to all line item types. $0.00 Grand Total: $0.00 Ali Vasarella(Cushing Terrell-Missoula) City of Bozeman Jackson Contractor Group,Inc. 306 W Railroad Street,Ste 104 PO Box 1230 PO Box 967 Missoula Montana 59802 Bozeman Montana 59771-1230 Missoula Montana 59806 ZA J05/13/2024 4/25/24 DATE SIGNATURE DATE SIGNATURE DATE Bozeman Office page 2 of 2 Printed On:4/9/2024 07:42 AM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 0 0 PCO #028 Jackson CONTRACTOR GROUP,Nw. Bozeman Office Project:03202202-City of Bozeman Construction Services Contracts 146 Laura Louise Ln 20 East Olive Street Bozeman, Montana 59718 Bozeman, Montana 59715 Phone:(406)577-2772 Phone:406-595-8470 Fax:(406)587-4282 Prime Contract Potential Change Order #028: Phase 2 Permit Drawings & Specifications Update Door Hardware Group #002 TO: City of Bozeman FROM: Jackson Contractor Group, Inc. PO Box 1230 PO Box 967 Bozeman Montana,59771-1230 Missoula Montana,59806 PCO NUMBER/REVISION: 028/0 CONTRACT: 03202202-01 -City of Bozeman Swim Center REQUEST RECEIVED FROM: Colton Morgan (Jackson Contractor Group, CREATED BY: Colton Morgan (Jackson Contractor Group, Inc.) Inc.) STATUS: Draft CREATED DATE: 4/8/2024 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: Bozeman Swim Center ACCOUNTING Amount Based METHOD: SCHEDULE IMPACT: 0 days PAID IN FULL: No TOTAL AMOUNT: $0.00 POTENTIAL CHANGE ORDER TITLE: Phase 2 Permit Drawings&Specifications Update Door Hardware Group#002 CHANGE REASON: Design Development POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE#044-Phase 2 Permit Drawings&Specifications Update Door Hardware Group#002 The pricing submitted by Anderson Steel for the hollow metal locker room door hardware was based on the specifications dated 6/30/2023,which only consisted of hardware group#001.The updated specifications call out newly added hardware group#002 for the two locker room doors.Anderson Steel has a pricing increase of$910 to provide hardware group#002.Jackson proposes to take this money from contingency with approval from the Owner. ATTACHMENTS: Hardware Group 2 Specifications.pdf _Swim Center hardware change to Group#002.pdf_ # SubJob Cost Code Description Type Amount 1 03 Bozeman Swim Center-Ph 2 08-1300-METAL DOORS Price Increase to change from Hardware Group#001 to#002 Subcontract $910.00 2 03 Bozeman Swim Center-Ph 2 01-2116-CONTINGENCY Contingency to cover price increase to change from Hardware Other ($910.00) Group#001 to#002 Subtotal: $0.00 Insurance:1.00%Applies to all line item types. $0.00 Contractor's Fee:8.00%Applies to all line item types. $0.00 GIRT:1.00%Applies to all line item types. $0.00 Bozeman Office page 1 of 2 Printed On:4/9/2024 07:52 AM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 0 PCO #028 Jar ksnn Unit/ "eirmR 6ROUP,Vw. Grand Total: Ali Vasarella(Cushing Terrell-Missoula) City of Bozeman Jackson Contractor Group,Inc. 306 W Railroad Street,Ste 104 PO Box 1230 PO Box 967 Missoula Montana 59802 Bozeman Montana 59771-1230 Missoula Montana 59806 /4 05/13/2024 i�//�. � 4/25/24 SI R DATE SIGNATURE DATE SIGNATURE DATE Bozeman Office page 2 of 2 Printed On:4/9/2024 07:52 AM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 PCO #29 Jackson rMAr RAICTOR GROUP,Nw. Bozeman Office Project:03202202-City of Bozeman Construction Services Contracts 146 Laura Louise Ln 20 East Olive Street Bozeman, Montana 59718 Bozeman, Montana 59715 Phone:(406)577-2772 Phone:406-595-8470 Fax:(406)587-4282 Prime Contract Potential Change Order #29: Replace Worn Flushing Valves TO: City of Bozeman FROM: Jackson Contractor Group, Inc. PO Box 1230 PO Box 967 Bozeman Montana,59771-1230 Missoula Montana,59806 PCO NUMBER/REVISION: 29/0 CONTRACT: 03202202-01 -City of Bozeman Swim Center REQUEST RECEIVED FROM: Robert Abbott (Blind Squirrel,LLC(Abbott CREATED BY: Colton Morgan (Jackson Contractor Group, Plumbing)) Inc.) STATUS: Pending-In Review CREATED DATE: 5/9/2024 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: Bozeman Swim Center ACCOUNTING Amount Based METHOD: SCHEDULE IMPACT: 0 days PAID IN FULL: No TOTAL AMOUNT: $0.00 POTENTIAL CHANGE ORDER TITLE: Replace Worn Flushing Valves CHANGE REASON:Allowance POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE#049-Replace Worn Flushing Valves During the removal of the toilets/urinals in the locker rooms,Abbott plumbing discovered one of the flushing valves is leaking and the other 7 are worn to the point they do not recommend installing the toilets/urinals again with the current valves. Abbott Scope:$1,475 furnish six(6)Sloan 111 manual flushometer valves for toilets in men's and women's restrooms. furnish two(2)Sloan 186 manual flushometer valves for urinals in men's restroom. Jackson proposes to pull this from the contingency with owner approval. ATTACHMENTS: # SubJob Cost Code Description Type Amount Furnish six(6)Sloan 111 manual flushometer valves for toilets in 1 03 Bozeman Swim Center-Ph 2 22-0001-PLUMBING COMPLETE men's and women's restrooms.Furnish two(2)Sloan 186 Subcontract $1,475.00 manual flushometer valves for urinals in men's restroom. 2 03 Bozeman Swim Center-Ph 2 01-2116-CONTINGENCY Contingency Draw Other ($1,475.00) Subtotal: $0.00 Insurance:0.00%Applies to all line item types. $0.00 Contractor's Fee:0.00%Applies to all line item types. $0.00 GIRT:0.00%Applies to all line item types. $0.00 Bozeman Office page 1 of 2 Printed On:5/9/2024 08:32 AM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 PCO #29 Jar ksnn Unit/ "eirmR 6ROUP,Vw. Grand Total: Ali Vasarella(Cushing Terrell-Missoula) City of Bozeman Jackson Contractor Group,Inc. 306 W Railroad Street,Ste 104 PO Box 1230 PO Box 967 Miss a Montana 59802 Bozeman Montana 59771-1230 Missoula Montana 59806 .t � / 05/13/2024 . 15/14/2024 (_fit ','b C� 5/14/2024 SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE Bozeman Office page 2 of 2 Printed On:5/9/2024 08:32 AM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 PCO #30 Jackson CONTRACTOR GROUP,Nw. Bozeman Office Project:03202202-City of Bozeman Construction Services Contracts 146 Laura Louise Ln 20 East Olive Street Bozeman, Montana 59718 Bozeman, Montana 59715 Phone:(406)577-2772 Phone:406-595-8470 Fax:(406)587-4282 Prime Contract Potential Change Order #30: PH2 Allowance - Mechanical Equipment Fencing TO: City of Bozeman FROM: Jackson Contractor Group, Inc. PO Box 1230 PO Box 967 Bozeman Montana,59771-1230 Missoula Montana,59806 PCO NUMBER/REVISION: 30/1 CONTRACT- 03202202-01 -City of Bozeman Swim Center REQUEST RECEIVED FROM: CREATED BY: Colton Morgan (Jackson Contractor Group, Inc.) STATUS: Pending-In Review CREATED DATE: 5/9/2024 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: Bozeman Swim Center ACCOUNTING Amount Based METHOD: SCHEDULE IMPACT: 0 days PAID IN FULL: No TOTAL AMOUNT- $0.00 POTENTIAL CHANGE ORDER TITLE: PH2 Allowance-Mechanical Equipment Fencing CHANGE REASON:Allowance POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE#036-PH2 Allowance-Mechanical Equipment Fencing Jackson: Demo and dispose of existing fence,posts,and gates. Montana Fence: Procure and install 41.5 linear feet of 6'tall chainlink fence with 1-EA 4'wide access gate as shown in the attached drawing. Fence posts are to be core drilled in concrete footings. ATTACHMENTS: Colton Morgan(Rnd 2 PDF).pdf_ _Mechanical Equipment Fence Mark Up.pdf # SubJob Cost Code Description Type Amount Procure and install 41.5 linear feet of 6'tall chainlink fence with 1 03 Bozeman Swim Center-Ph 2 01-5626-TEMP FENCING 1-EA 4'wide access gate as shown in the attached drawing. Subcontract $3,762.00 Fence posts are to be core drilled in concrete footings. 2 03 Bozeman Swim Center-Ph 2 01-5626-TEMP FENCING Demo and dispose of existing fence,posts,and gates.2 Guys Labor $773.64 for 6 hours. 3 03 Bozeman Swim Center-Ph 2 17-0003-MECHANICALEQUIPMENT FENCING Fund from Allowance Other ($10,000.00) 4 03 Bozeman Swim Center-Ph 2 01-2116-CONTINGENCY Move Remaining Money to Contingency Other $5,464.36 Bozeman Office page 1 of 2 Printed On:5/14/2024 09:06 AM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 PCO #30 Jar ksnn CONTRACTOR 6RULIP,Vw. Subtotal: $0.00 Insurance:1.00%Applies to all line item types. $0.00 Contractor's Fee:8.00%Applies to all line item types. $0.00 GIRT:1.00%Applies to all line item types. $0.00 Grand Total: $0.00 Ali Vasarella(Cushing Terrell-Missoula) City of Bozeman Jackson Contractor Group,Inc. 306 W Railroad Street,Ste 104 PO Box 1230 PO Box 967 MiSsQd10 Montana 59802 Bozeman Montana 59771-1230 Missoula Montana 59806 05/14/2024 5/14/2024 O&M,q6w� 5/14/2024 SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE Bozeman Office page 2 of 2 Printed On:5/14/2024 09:06 AM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 PCO #31 Jackson CONTRACTOR GROUP,Nw. Bozeman Office Project:03202202-City of Bozeman Construction Services Contracts 146 Laura Louise Ln 20 East Olive Street Bozeman, Montana 59718 Bozeman, Montana 59715 Phone:(406)577-2772 Phone:406-595-8470 Fax:(406)587-4282 Prime Contract Potential Change Order #31 : Temporarily Reroute Bozeman High Gas Line TO: City of Bozeman FROM: Jackson Contractor Group, Inc. PO Box 1230 PO Box 967 Bozeman Montana,59771-1230 Missoula Montana,59806 PCO NUMBER/REVISION: 31 /0 CONTRACT: 03202202-01 -City of Bozeman Swim Center REQUEST RECEIVED FROM: CREATED BY: Colton Morgan (Jackson Contractor Group, Inc.) STATUS: Pending-In Review CREATED DATE: 5/14/2024 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: Bozeman Swim Center ACCOUNTING Amount Based METHOD: SCHEDULE IMPACT: PAID IN FULL: No TOTAL AMOUNT: $0.00 POTENTIAL CHANGE ORDER TITLE:Temporarily Reroute Bozeman High Gas Line CHANGE REASON: Existing Condition POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) Temporarily Reroute Bozeman High Gas Line To avoid impacting the high school's operations during the school year,a 2"gas line coming off the meters on the northeast corner of the building needs to be temporarily rerouted during construction. Abbott: Procure and install a temporary gas line from the Northeast meter to the school connection to the South. ATTACHMENTS: # SubJob Cost Code Description Type Amount 1 03 Bozeman Swim Center-Ph 2 22-0001-PLUMBING COMPLETE Procure and install a temporary gas line from the Northeast Subcontract $2,656.00 meter to the school connection to the South. 2 03 Bozeman Swim Center-Ph 2 01-2116-CONTINGENCY Contingency Draw Other ($2,656.00) Subtotal: $0.00 Insurance:0.00%Applies to all line item types. $0.00 Contractor's Fee:0.00%Applies to all line item types. $0.00 GIRT:0.00%Applies to all line item types. $0.00 Grand Total: $0.00 Bozeman Office page 1 of 2 Printed On:5/14/2024 10:38 AM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 PCO #31 Jar ksnn COIYTR"eirmR GROUP,Mr. Ali Vasarella(Cushing Terrell-Missoula) City of Bozeman Jackson Contractor Group,Inc. 306 W Railroad Street,Ste 104 PO Box 1230 PO Box 967 Miss la Montana 59802 Bozeman Montana 59771-1230 Missoula Montana 59806 / 05/14/2024 � ./� a �5/14/2024 �5b&01,kb C? 1 5/14/2024 E2�C�� I ATU E DATE SIGNATURE DATE SIGNATURE DATE Bozeman Office page 2 of 2 Printed On:5/14/2024 10:38 AM Dows,gn Envelope ID:EDF2A850-2EFB4071-AOC4-76C7BO5C8188 Al PCO #32 Jackson CO.ATRACTUR GROUP.1AlC- Bozeman Offce Projeee 03202202-City of Bozeman Construction Services Contracts 146 Laura Louise Ln 20 East Olive Street Bozeman,Montana 59716 Bozeman,Montana 59715 Phone:(406)577-2772 Phone:406-595-8470 Fax(4D6)5874282 Prime Contract Potential Change Order#32: Dehumidifier Concrete Pad Design TO: City of Bozeman FRl)M: Jackson Contractor Group,Inc. PO Box 1230 P O Box 967 Bozeman Montana,59 7 71-1 23 0 Missoula Montana,59806 PCONUMBERRIEVISNIN: 3210 CONTRACT 03202202-01-CdycfBozemanSWmCenter REQUEST RECEIVED FROM Jim Dasllva(JIm Daaiaa Construction CREATED BY: Colon Morgan(Jackson Conbaetar Group, LLC) M¢.) STATUS: Pending-In Review CREATED DATE: SM512024 REFERENCE: PRIDE CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: Bozeman SWmCarter ACCOUNTMG Amount Based METHOD: SCHEDULE NNPACT: PAD)NI FULL: No TOTAL AMU". $0.00 POTENTIAL CHANGE ORDER TITLE:DehunWiller Concrete Patl Design CHANGE REASON:Design Development POTENTIAL CHANGE ORDER DESCRIPTION:(The Contract 1s Changed As FoWws) CE t052-RFI I140:Dehumidfler Concrete Pad Design Per RFI t40,approximately 6-7 inches of elevation were added to the housekeeping pad to level it our and provide sufficient concrete depth and coverage to support the werght of the mechanical unit DasiNa Concrete:$925 -Additional 5 Yards of concrete at 31851YD. ATTACHMENTS: RFI 40-Conc Pad Design-DCI RESPONSE(2).odf Y Su0J00 kbltCW. blcnp/on T)p1 AmclJm 1 D3llc m.Sale C0ltr-P12 03-1150-DABILVA CONCRETE AddlbIalSYaMotwhoet MSIaSMDbrae H0lu S10oolIDcl 692SDO 120pI1g PM. 2 D311—a1 Sale 0"tr-P12 01-2115-COIRNGENCY C01SIgticy Dr Otel 4025JI0g SICbbl: tio.W nlunncl_1.00%Appllll tannin ixem Vpll. $0.00 COntSct0Y1 R1:t.00%App1161 be1111M Itm Vp11- $0 CRT.1.01%AppIN1 W.1111wlem t/p11. 50.00 B02enln OBce page 1 of 2 Printed On:511512024 07:55 AM Dows,gn Envelope ID:EDF2A850-2EFB4071-AOC4-76C7BO5C8188 PCO #32 JaC,�(5017 CON7RACTva swnua Mr. cnnd rom: Ir.ro Ali Vassralla(CuaNng Terrell-Msaoula) CNy of Bozeman Jackson Contractor Group,Inc. 306 W Railroad Street,Ste 104 PO Box 1230 PO Box 967 MTilantana 59902 Bozeman Montana 597 71-1 230 Missoula Montana 59W6 Gt/i�l. 05/29/2024 5/29/2024 [ )yaw-In' 5n512024 SIGNATURE DATE SIGNATURE UAIt SIGNATURE DATE Bozeman Orice page 2ei2 Printed On:SM 512024 07:55 AM Dows,gn Envelope ID:EDF2A850-2EFB4071-AOC4-76C7BO5C8188 Bezenlat 011ke Project:03282262 City oT Bozeman Construction 146 Lase Louise Ln Services Contracts Bozeman,Montane 59718 20 East Olive Street .Jl wks n P:(406)577-2772 Bozeman,Montana 59715 EVATRAC20R 6111110UP.OVC. F-(406)587-4282 P:406-595-8470 RFI #40: Dehumidifier Concrete Pad Design Status Open To Samantha Fox(DCI Engineers-Bozeman) Rom Colton Morgan(Jackson Contractor Group,Inc.) Jane Zanteson(DCI Engineers-Bozeman) 146 Laura Louise Ln Bozeman,Montana 59718 Date Initiated May 8.2024 Due Date May 15,2024 Location Bozeman Swm Center Project Stage Cost Impact $1175.00 Schedule Impact Spec Section Cost Code D rawng Number 212M101 Reference Linked Drawings Received From Colton Morgan(Jackson Contractor Group,Inc) Sub Job 03 Bozeman Swm Center-Ph 2 Copies To Caftan CrolAe(C om fort System s of Montana-Bozeman),Jim Des Iva(Jim Des Iva C onstruction LLC),C hase Hardee(Jackson Contractor Group,Inc.),Chris Webb(Jackson Contractor Group,Inc.) You are directed to Proceed mith this RFI.Ifthe response to this RFI constitutes an increase in time and/or cost to your verk,you must notify this office vathin five(5)calendar days tom the date of this RFI response.Should you fail to respond by this date vie wil consider this a'no cost"charge to your contract. Activity Question Question from Colton Morgan Jackson Contractor Group,Inc.on Wednesday,May 8,2024 at 10:17 AM MDT P lease refer to the attached drawing(Equipment Pad Markup)on page 1 for the suggested pad design,as shovvn in green.A couple of issues were encountered wth the current pad.The first one is that the current pad in place is sloping,as show)in the drawng.It has been confirmed with Comfort Systems that the newunt will need a fiat surface and that the unit cannot be shimmed to level.The second issue is"the concrete around the pad has a roughly 32%slope.The ground height ends up being higher than the wnent concrete pad elevation by the time you get over to the south,where the pad needs to extend. We are proposing to build the pad up and over the current pad,as shove in green.Please confirm ifthis design vwuld be acceptable and suflaem to support the might ofthe dehumidiler unit(see attached submittal for the unit)and confirm if any additional reinforcement is needed-We have drain t to have a minimum of 6"of concrete thc:ness at all locations.We have confirmed wth Comfort Systems that this increase in elevation will not affect their installation or m aintenanoe of the dehumidlficabon unit. Athichunes s Equipment Pad Markup 5.824(1)pdf.Submitlal t238416.2M-1 1 Mechanical Equipment Product Data and Shop Drawngs- CT-FAC.pdf Awatelg an OfficelResponae DCIRESPONSE: THE PROPOSED SLAB BUILDUP IS ACCEPTABLE.SEE MARKUPS ON THE FOLLOWING SHEET IN RED. Bozeman Office P age 1 of 1 Printed On:May 14.2024 09:35 AM MDT Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 PCO #33 Jackson CO/YTRAICTOR GROUP,Nw. Bozeman Office Project:03202202-City of Bozeman Construction Services Contracts 146 Laura Louise Ln 20 East Olive Street Bozeman, Montana 59718 Bozeman, Montana 59715 Phone:(406)577-2772 Phone:406-595-8470 Fax:(406)587-4282 Prime Contract Potential Change Order #33: Replace Pool Shell Lights TO: City of Bozeman FROM: Jackson Contractor Group, Inc. PO Box 1230 PO Box 967 Bozeman Montana,59771-1230 Missoula Montana,59806 PCO NUMBER/REVISION: 33/0 CONTRACT: 03202202-01 -City of Bozeman Swim Center REQUEST RECEIVED FROM: Nick Strub (SES Electrical Systems LLC) CREATED BY: Colton Morgan (Jackson Contractor Group, Inc.) STATUS: Pending-In Review CREATED DATE: 5/15/2024 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: Bozeman Swim Center ACCOUNTING Amount Based METHOD: SCHEDULE IMPACT- PAID IN FULL: No TOTAL AMOUNT: $0.00 POTENTIAL CHANGE ORDER TITLE: Replace Pool Shell Lights CHANGE REASON:Allowance POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE#053-Replace Pool Shell Lights Remove and replace 20-EA Pool Shell lights. Lights are provided by the owner. Pricing assumes owner-provided fixtures are a direct,screw-in replacement and no modifications to existing housing are necessary for fitment and or sealing of pool shell and existing light housings. ATTACHMENTS: CE2376.02 Pool lights.pdf_ _FW Pool Iights.msq_ # SubJob Cost Code Description Type Amount Remove and replace 20-EA Pool Shell lights.Lights are provided 26-0001-SES ELECTRICAL by the owner.Pricing assumes owner-provided fixtures are a 1 03 Bozeman Swim Center-Ph 2 COMPLETE direct,screw-in replacement and no modifications to existing Subcontract $3,600.00 housing are necessary for fitment and or sealing of pool shell and existing light housings. 2 03 Bozeman Swim Center-Ph 2 01-2116-CONTINGENCY Contingency Draw Other ($3,600.00) Subtotal: $0.00 Insurance:1.00%Applies to all line item types. $0.00 Contractor's Fee:8.00%Applies to all line item types. $0.00 GIRT:1.00%Applies to all line item types. $0.00 Grand Total: $0.00 Bozeman Office page 1 of 2 Printed On:5/15/2024 12:00 PM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 PCO #33 Jar ksnn COIYTR"eirmR GROUP,Mr. Ali Vasarella(Cushing Terrell-Missoula) City of Bozeman Jackson Contractor Group,Inc. 306 W Railroad Street,Ste 104 PO Box 1230 PO Box 967 Missoula Montana 59802 Bozeman Montana 59771-1230 Missoula Montana 59806 illf& 14 05/29/2024 '�' �i 5/23/24 evibin/�� 5/15/2024 G TU E DATE SIGNATURE DATE SIGNATURE DATE Bozeman Office page 2 of 2 Printed On:5/15/2024 12:00 PM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 PCO #034 Bozeman Office Project:03202202-City of Bozeman Construction Services Contracts 146 Laura Louise Ln 20 East Olive Street Bozeman, Montana 59718 Bozeman, Montana 59715 Phone:(406)577-2772 Phone:406-595-8470 Fax:(406)587-4282 Prime Contract Potential Change Order #034: Wainscot Wall Change & Added ADA Grab Bar Per City Review TO: City of Bozeman FROM: Jackson Contractor Group, Inc. PO Box 1230 PO Box 967 Bozeman Montana,59771-1230 Missoula Montana,59806 PCO NUMBER/REVISION: 034/0 CONTRACT- 03202202-01 -City of Bozeman Swim Center REQUEST RECEIVED FROM: CREATED BY: Colton Morgan (Jackson Contractor Group, Inc.) STATUS: Pending-In Review CREATED DATE: 5/21 /2024 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: Bozeman Swim Center ACCOUNTING Amount Based METHOD: SCHEDULE IMPACT: PAID IN FULL: No TOTAL AMOUNT- $0.00 POTENTIAL CHANGE ORDER TITLE:Wainscot Wall Change&Added ADA Grab Bar Per City Review CHANGE REASON: Design Development POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) Phase 2 Permit Drawings Wainscot Wall Change&Added ADA Grab Bar Per City Review See attached drawing 2A102 details 7 and 8.Per the City's review,an ADA grab bar had to be added and they extended the height and width of the Wainscot wall in the ADA bathroom. Abbott: -Procure and install 1-EA 18"grab bar per detail 8/2A102. Pierce Flooring: -Procure and install additional wall tile per details 7/2A102 and 8/2A102. ATTACHMENTS: 2A102 NEW—LOCKER ROOM_FLOOR_PLAN_AND REFLECTED_CEILING_PLAN.pdf # SubJob Cost Code Description Type Amount 1 03 Bozeman Swim Center-Ph 2 09-6800-PIERCE TILING Procure and install additional wall tile per details 7/2A102 and Subcontract $432.00 8/2A102. 2 03 Bozeman Swim Center-Ph 2 22-0001-PLUMBING COMPLETE Procure and install 1-EA 18"grab bar per detail 8/2A102. Subcontract $96.00 3 03 Bozeman Swim Center-Ph 2 01-2116-CONTINGENCY Contingency Draw Other ($528.00) Subtotal: Bozeman Office page 1 of 2 Printed On:5/21/2024 04:30 PM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 PCO #034 Insurance:1.00%Applies to all line item types. $0.00 Contractor's Fee:8.00%Applies to all line item types. $0.00 GRT:1.00%Applies to all line item types. $0.00 Grand Total: $0.00 Ali Vasarella(Cushing Terrell-Missoula) City of Bozeman Jackson Contractor Group,Inc. 306 W Railroad Street,Ste 104 PO Box 1230 PO Box 967 Miss la Montana 59802 Bozeman Montana 59771-1230 Missoula Montana 59806 05/29/2024 FA .�"f5/23/2024 SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE Bozeman Office page 2 of 2 Printed On:5/21/2024 04:30 PM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 PCO #35 Jackson rmAr R ii GROUP,Nw. Bozeman Office Project:03202202-City of Bozeman Construction Services Contracts 146 Laura Louise Ln 20 East Olive Street Bozeman, Montana 59718 Bozeman, Montana 59715 Phone:(406)577-2772 Phone:406-595-8470 Fax:(406)587-4282 Prime Contract Potential Change Order #35: Credit Flat Siding from PCO #024 TO: City of Bozeman FROM: Jackson Contractor Group, Inc. PO Box 1230 PO Box 967 Bozeman Montana,59771-1230 Missoula Montana,59806 PCO NUMBER/REVISION: 35/0 CONTRACT: 03202202-01 -City of Bozeman Swim Center REQUEST RECEIVED FROM: CREATED BY: Colton Morgan (Jackson Contractor Group, Inc.) STATUS: Pending-In Review CREATED DATE: 5/29/2024 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: Bozeman Swim Center ACCOUNTING Amount Based METHOD: SCHEDULE IMPACT: PAID IN FULL: No TOTAL AMOUNT: $0.00 POTENTIAL CHANGE ORDER TITLE: Credit Flat Siding from PCO#024 CHANGE REASON:Allowance POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE#057-Credit Flat Siding from PCO#024 Per RFI#43 the flat metal siding that was added in PCO#24 has been removed and changed to the standard MS3 siding. ATTACHMENTS: Swim Center PCO#024.pdf_ # SubJob Cost Code Description Type Amount 1 03 Bozeman Swim Center-Ph 2 07-4623-DIVISION 7 SIDING Credit Flat Siding Credit from PCO#024 Subcontract ($4,800.00) 2 03 Bozeman Swim Center-Ph 2 01-2116-CONTINGENCY Contingency Other $4,800.00 Subtotal: $0.00 Insurance:1.00%Applies to all line item types. $0.00 Contractor's Fee:8.00%Applies to all line item types. $0.00 GIRT:1.00%Applies to all line item types. $0.00 Grand Total: $0.00 Bozeman Office page 1 of 2 Printed On:5/29/2024 03:47 PM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 PCO #35 Jar ksnn COIYTR"eirmR GROUP,Mr. Ali Vasarella(Cushing Terrell-Missoula) City of Bozeman Jackson Contractor Group,Inc. 306 W Railroad Street,Ste 104 PO Box 1230 PO Box 967 Missoula Montana 59802 Bozeman Montana 59771-1230 Missoula Montana 59806 IliA'A YI/ �' 05/30/2024 �� �� 5 ' C/Y� 5.29.24 /30/24 �' SIG T E DATE SIGNATURE DATE SIGNATURE DATE Bozeman Office page 2 of 2 Printed On:5/29/2024 03:47 PM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 0 0 PCCO #006 Jackson COWRACIOR GROUP,WC. Bozeman Office Project: 03202202 - City of Bozeman Construction Services Contracts 146 Laura Louise Ln 20 East Olive Street Bozeman, Montana 59718 Bozeman, Montana 59715 Phone: (406)577-2772 Phone: 406-595-8470 Fax: (406)587-4282 Prime Contract Change Order #006: June 2024 Approved PCO's TO: City of Bozeman FROM: Jackson Contractor Group,Inc. PO Box 1230 PO Box 967 Bozeman, Montana 59771-1230 Missoula Montana 59806 DATE CREATED: 6/20/2024 CREATED BY: Colton Morgan(Jackson Contractor Group, Inc.) CONTRACT STATUS: Pending-In Review REVISION: 0 DESIGNATED REVIEWER: Colton Morgan (Jackson Contractor Group, REVIEWED BY: Inc.) DUE DATE: 07/25/2024 REVIEW DATE: INVOICED DATE: PAID DATE: SCHEDULE IMPACT: EXECUTED: No CONTRACT FOR: 03202202-01:City of Bozeman Swim Center TOTAL AMOUNT: $0.00 DESCRIPTION: See below the listed approved PCO's for June 2024. Approved PCO's #36 #37 #38 #39 ATTACHMENTS: PCO#38-Unknown Existing Condition Gutter Structure-Signed.pdf PCO#39-Pool Mechanical Boiler Room Roof-Signed(1).pdf PCO#37- Natatorium North Wall Paintingpdf PCO#36-Plumbing Investigation and Slab Cutting-Executed(1).pdf This proposal is based on the usual cost elements such as labor,material,and normal mark ups,and does not include any amount for changes in the sequence or work delays,disruption, rescheduling,extended overhead,acceleration and or impacts,and the right is expressly reserved to make claim for any and all of these related items of cost prior to any final settlement of the contract. POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO# Title Schedule Impact Amount 36 Plumbing Investigation and Slab Cutting 0.00 37 Natatorium North Wall Painting 0.00 38 Unknown Existing Condition-Gutter Structure 10 days 0.00 39 RFI#48:Pool Mechanical/Boiler Room Roof Unknown Conditions 17 days 0.00 TOTAL: $0.00 CHANGE ORDER LINE ITEMS: Bozeman Office page 1 of 3 Printed On:7/2/2024 02:39 PM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 0 0 PCCO #006 Jackson iCOAfMArTDR 6AOLIP,MC. PCO#36: Plumbing Investigation and Slab Cutting # SubJob Cost Code Description Type Amount 1 03 Bozeman Swim Center-Ph 2 22-1000-PLUMBING GPR-Scan and locate underground utilities in the locker rooms. Material $1,687.50 INVESTIGATION 2 03 Bozeman Swim Center-Ph 2 22-1000-PLUMBING Stokke-Cut concrete for investigation Material $1,775.00 INVESTIGATION 3 03 Bozeman Swim Center-Ph 2 22-1000-PLUMBING Jackson-Demo and dispose of cut-up concrete. Subcontract $1,765.96 INVESTIGATION 4 03 Bozeman Swim Center-Ph 2 22-0001-PLUMBING COMPLETE Additional investigation time to help us find and expose the lines Subcontract $1,200.00 to tie into. 5 03 Bozeman Swim Center-Ph 2 03-1150-DASILVA CONCRETE Pour back concrete after plumbing investigation Subcontract $2,246.07 17-0010-PLUMBING INVSTGTN& 9 ($7,500.00) 6 03 Bozeman Swim Center-Ph 2 SLAB CTTNG Plumbing Investigation Allowance Other 7 03 Bozeman Swim Center-Ph 2 01-2116-CONTINGENCY Contingency For Allowance Overrun Other ($1,174.53) Subtotal: $0.00 Insurance:1.00%Applies to all line item types. 0.00 Contractor's Fee:8.00%Applies to all line item types. 0.00 GIRT:1.00%Applies to all line item types. 0.00 Grand Total: PCO#37 : Natatorium North Wall Painting # SubJob Cost Code Description Type Amount 1 03 Bozeman Swim Center-Ph 2 09-9100-ANOTHER PETERS Prep and paint the North mural wall with 2-3 coats as needed to Subcontract $4,000.00 PAINTING fully cover the current dark paint colors on the wall. 2 03 Bozeman Swim Center-Ph 2 01-2116-CONTINGENCY Draw from Contingency Other ($4,000.00) Subtotal: $0.00 Insurance:1.00%Applies to all line item types. 0.00 Contractor's Fee:8.00%Applies to all line item types. 0.00 GIRT:1.00%Applies to all line item types. 0.00 Grand Total: $0.00 PCO#38: Unknown Existing Condition-Gutter Structure # SubJob Cost Code Description Type Amount Provide all labor,supervision,equipment,and materials to accomplish the scopes listed herein.Demolish the existing front gutter wall down to solid concrete.Dowel in#3 FRP rebar at 10" O.C.with(2)#3 FRP horizontal bars at the top of the wall and mid-span.Completely remove/strip the existing waterproofing. Form and rebuild the front gutter wall with shotcrete to 1 03 Bozeman Swim Center-Ph 2 13-1101-ANDERSON POOLS accommodate the new coping.Specific Inclusions:MT GIRT Subcontract $0.00 Prevailing Wage and Certified Payroll The total amount of $66,238 is a not-to-exceed value.Jackson and Anderson Poolworks will track work on a T&M basis(rates listed below). Daily timesheets will be signed by the superintendents of Jackson and APW.Upon completion of the work,a reconciliation will occur to determine the final value,and a subsequent CCO will be sent with the approved value. 2 03 Bozeman Swim Center-Ph 2 01-2116-CONTINGENCY Draw Remainder from Contingency Other $0.00 3 03 Bozeman Swim Center-Ph 2 17-0005-STRUCT.REPAIR AT Draw from Structural Pool Repairs Allowance Other $0.00 POOL(60 LF) Subtotal: $0.00 Insurance:1.00%Applies to all line item types. 0.00 Contractor's Fee:8.00%Applies to all line item types. 0.00 GIRT:1.00%Applies to all line item types. 0.00 Grand Total: $0.00 Bozeman Office page 2 of 3 Printed On:7/2/2024 02:39 PM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 0 PCCO #006 Jar ksnn CONTRACTOR GROUP,AW. PCO#39 : RFI#48: Pool Mechanical/Boiler Room Roof Unknown Conditions # SubJob Cost Code Description Type Amount Remove&dispose existing roofing system Remove&Replace roof sheathing,5/8"OSB Supply&Install 725TR Vapor Barrier `Supply&Install 2 layers 2.6"polyiso insulation(R-30)Supply& 1 03 Bozeman Swim Center-Ph 2 07-7200-ACE ROOFING Install'/:"HD ISO coverboard(mechanically attached)Supply& Subcontract $41,871.00 Install 60mill EPDM membrane(fully adhered)Supply&Install flashing&Copings(standard 24 gauge galvanized steel) Specific Inclusions:-MT GIRT-Prevailing wage and certified payroll 2 03 Bozeman Swim Center-Ph 2 01-2116-CONTINGENCY Draw from Contingency Other ($41,871.00) Subtotal: $0.00 Insurance:1.00%Applies to all line item types. 0.00 Contractor's Fee:8.00%Applies to all line item types. 0.00 GRT:1.00%Applies to all line item types. 0.00 Grand Total: $0.00 The original(Contract Sum) $ 5,036,097.68 Net change by previously authorized Change Orders $434,678.12 The contract sum prior to this Change Order was $ 5,470,775.80 The contract sum would be changed by this Change Order in the amount of $ 0.00 The new contract sum including this Change Order will be $ 5,470,775.80 The contract time will not be changed by this Change Order Ali Vasarella(Cushing Terrell-Missoula) City of Bozeman Jackson Contractor Group,Inc. 306 W Railroad Street,Ste 104 PO Box 1230 PO Box 967 Z/Z/ 4/2024 02 Bozeman Montana 59771-1230 Missoula Montana 59806 oln 67k�aWln 7/18/2024 U DATE SIGNATURE DATE SIGNATURE DATE Bozeman Office page 3 of 3 Printed On:7/2/2024 02:39 PM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 PCO #36 Jackson CONTRACTOR GROUP,Nw. Bozeman Office Project:03202202-City of Bozeman Construction Services Contracts 146 Laura Louise Ln 20 East Olive Street Bozeman, Montana 59718 Bozeman, Montana 59715 Phone:(406)577-2772 Phone:406-595-8470 Fax:(406)587-4282 Prime Contract Potential Change Order #36: Plumbing Investigation and Slab Cutting TO: City of Bozeman FROM: Jackson Contractor Group, Inc. PO Box 1230 PO Box 967 Bozeman Montana,59771-1230 Missoula Montana,59806 PCO NUMBER/REVISION: 36/0 CONTRACT: 03202202-01 -City of Bozeman Swim Center REQUEST RECEIVED FROM: CREATED BY: Colton Morgan (Jackson Contractor Group, Inc.) STATUS: Pending-In Review CREATED DATE: 6/7/2024 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: Bozeman Swim Center ACCOUNTING Amount Based METHOD: SCHEDULE IMPACT: PAID IN FULL: No TOTAL AMOUNT: $0.00 POTENTIAL CHANGE ORDER TITLE: Plumbing Investigation and Slab Cutting CHANGE REASON:Allowance POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE#042-PH2 Allowance-Plumbing Investigation and Slab Cutting $7,500 allowance for plumbing investigation and slab cutting for plumbing lines in added family restrooms.See the attached photos of cutting required to find the plumbing lines.They were not where they were supposed to be per the plans and additional cutting,demoing and investigation were needed. GPR:$1,687.50 -Scan and locate underground utilities in the locker rooms. Stokke Concrete Cutting:$1,775 -Cut concrete for investigation. Jackson:$1,765.96 -Demo and dispose of cut-up concrete. Abbott:$1,200.00 -Additional investigation time to help us find and expose the lines to tie into. Dasilva Concrete:$2,246.07 -Pour back concrete after plumbing investigation. ATTACHMENTS: 899FBBDA-21 C7-4BBB-8998-61 BA7941 FEB 1.'peg _FD14564F-9A20-4OF6-A73D-AEDD1444FB29.jpeg 31979BFE-8D9D-42CD-BB55- 8C1 FFF7AD97E.jpeg_ 62F7952F-5207-4AD6-9FO7-2341 D59OC873.jpeo Bozeman Office page 1 of 2 Printed On:6/7/2024 11 :29 AM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 PCO #36 Jar ksnn Unit/ R wmR GROUP,VW. # SubJob Cost Code Description Type Amount 1 03 Bozeman Swim Center-Ph 2 22-1000-PLUMBING GPR-Scan and locate underground utilities in the locker rooms. Material $1,687.50 INVESTIGATION 2 03 Bozeman Swim Center-Ph 2 22-1000-PLUMBING Stokke-Cut concrete for investigation Material $1,775.00 INVESTIGATION 3 03 Bozeman Swim Center-Ph 2 22-1000-PLUMBING Jackson-Demo and dispose of cut-up concrete. Subcontract $1,765.96 INVESTIGATION 4 03 Bozeman Swim Center-Ph 2 22-0001-PLUMBING COMPLETE Additional investigation time to help us find and expose the lines Subcontract $1,200.00 to tie into. 5 03 Bozeman Swim Center-Ph 2 03-1150-DASILVA CONCRETE Pour back concrete after plumbing investigation Subcontract $2,246.07 17-0010-PLUMBING INVSTGTN& 9 ($7,500.00) 6 03 Bozeman Swim Center-Ph 2 SLAB CTTNG Plumbing Investigation Allowance Other 7 03 Bozeman Swim Center-Ph 2 01-2116-CONTINGENCY Contingency For Allowance Overrun Other ($1,174.53) Subtotal: $0.00 Insurance:1.00%Applies to all line item types. $0.00 Contractor's Fee:8.00%Applies to all line item types. $0.00 GIRT:1.00%Applies to all line item types. $0.00 Grand Total: Ali Vasarella(Cushing Terrell-Missoula) City of Bozeman Jackson Contractor Group,Inc. 306 W Railroad Street,Ste 104 PO Box 1230 PO Box 967 Misso la Montana 59802 Bozeman Montana 59771-1230 Missoula Montana 59806 i 06/10/202410/24 Q/YL / 9hG 6/12/2024 U DATE SIGNATURE DATE SIGNATURE DATE Bozeman Office page 2 of 2 Printed On:6/7/2024 11 :29 AM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 0 PCO #39 Jackson COWRAlCYUR SROLIP,AVC. Bozeman Office Project:03202202-City of Bozeman Construction Services Contracts 146 Laura Louise Ln 20 East Olive Street Bozeman,Montana 59718 Bozeman,Montana 59715 Phone:(406)577-2772 Phone:406-595-8470 Fax:(406)587-4282 Prime Contract Potential Change Order #39: RFI #48: Pool Mechanical/Boiler Room Roof Unknown Conditions TO: City of Bozeman FROM: Jackson Contractor Group,Inc. PO Box 1230 PO Box 967 Bozeman Montana,59771-1230 Missoula Montana,59806 PCO NUMBER/REVISION: 39/0 CONTRACT: 03202202-01 -City of Bozeman Swim Center REQUEST RECEIVED FROM: Addy Ferguson (ACE Roofing,LLC) CREATED BY: Colton Morgan (Jackson Contractor Group, Inc.) STATUS: Pending-In Review CREATED DATE: 6/19/2024 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: Bozeman Swim Center ACCOUNTING Amount Based METHOD: SCHEDULE IMPACT: 7 days PAID IN FULL: No TOTAL AMOUNT: $0.00 POTENTIAL CHANGE ORDER TITLE: RFI#48:Pool Mechanical/Boiler Room Roof Unknown Conditions CHANGE REASON: Existing Condition POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE#061 -RFI#48:Pool Mechanical/Boiler Room Roof Unknown Conditions Upon Ace Roofing pulling back the EPDM for Division 7 to tie in their siding system,substantial rot was discovered in the roof sheathing(see attached photos).It was also found that there is closed-cell insulation below,but no roof insulation.Ace Roofing has suggested that the lack of roof insulation might be causing condensation in this cavity,contributing to the rot in the sheathing.Both Jackson and Ace Roofing recommend a complete replacement of the roofing system. Per the response to RFI#48,Ace Roofing is to move forward with the scope of work listed below. Ace Roofing: Remove&dispose existing roofing system Remove&Replace roof sheathing,5/8"OSB Supply&Install 725TR Vapor Barrier 'Supply&Install 2 layers 2.6"polyiso insulation(R-30) Supply&Install%"HD ISO coverboard(mechanically attached) Supply&Install 60mill EPDM membrane(fully adhered) Supply&Install flashing&Copings(standard 24 gauge galvanized steel) Specific Inclusions: MT GRT Prevailing wage and certified payroll Total Cost:$41,871.00 Bozeman Office page 1 of 2 Printed On:6/19/2024 09:29 AM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 621 PCO #39 Jackson CLINTI7 "Dil?fimouP,INC. ATTACHMENTS: RFI#48-Pool Mechanical Boiler Room Roof Unknown Condit 2024-06-19.pdf RE-OAC-Meeting-618.msg Image-7-(2).ipg _Image-6.ipq Image-5.0pq Image-4.ipg Image-3.0pq _Image-2.' Image-1.0pg 2024-2713-Swim-C enter-Phase-2-FA-Bid-240618.pdf # SubJob Cost Code Description Type Amount Remove 8 dispose existing roofing system Remove&Replace roof sheathing,5/8"OSB Supply 8 Install 725TR Vapor Barrier 'Supply 8 Install 2 layers 2.6"polyiso insulation(R-30)Supply& 1 03 Bozeman Swim Center-Ph 2 07-7200-ACE ROOFING Install%"HD ISO coverboard(mechanically attached)Supply 8 Subcontract $41,871.00 Install 60mill EPDM membrane(fully adhered)Supply&Install flashing&Copings(standard 24 gauge galvanized steel) Specific Inclusions:-MT GIRT-Prevailing wage and certified payroll 2 03 Bozeman Swim Center-Ph 2 01.2116-CONTINGENCY Draw from Contingency Other ($41,871.00) Subtotal: $0.00 Insurance:1.00%Applies to all line item types. $0.00 Contractor's Fee:8.00%Applies to all line item types. $0.00 GIRT:1.00%Applies to all line item types. $0.00 Grand Total: $0.00 Ali Vasarella(Cushing Terrell-Missoula) City of Bozeman Jackson Contractor Group,Inc. 306 W Railroad Street,Ste 104 PO Box 1230 PO Box 967 Misso la Montana 59802 Bozeman Montana 59771-1230 Missoula Montana 59806 06/20/2024 IG ATU E DATE SIGNATURE DATE SIGNATURE DATE Bozeman Office page 2 of 2 Printed On:6/19/2024 09:29 AM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 0 PCO #38 Jackson C0rVTR1WMR GROl.ip,mr. Bozeman Office Project:03202202-City of Bozeman Construction Services Contracts 146 Laura Louise Ln 20 East Olive Street Bozeman,Montana 59718 Bozeman,Montana 59715 Phone:(406)577-2772 Phone:406-595-8470 Fax:(406)587-4282 Prime Contract Potential Change Order #38: Unknown Existing Condition - Gutter Structure TO: City of Bozeman FROM: Jackson Contractor Group,Inc. PO Box 1230 PO Box 967 Bozeman Montana,59771-1230 Missoula Montana,59806 PCO NUMBER/REVISION: 38/0 CONTRACT: 03202202-01 -City of Bozeman Swim Center REQUEST RECEIVED FROM: Craig Nicholson (Anderson Pool Works) CREATED BY: Colton Morgan (Jackson Contractor Group, Inc.) STATUS: Pending-In Review CREATED DATE: 6/13/2024 REFERENCE: RFI#45 PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: Bozeman Swim Center ACCOUNTING Amount Based METHOD: SCHEDULE IMPACT: 10 days PAID IN FULL: No TOTAL AMOUNT: $0.00 POTENTIAL CHANGE ORDER TITLE: Unknown Existing Condition-Gutter Structure CHANGE REASON: Existing Condition POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE#060-Unknown Existing Condition-Gutter Structure Upon conducting an exploratory demo and removing the existing coping pieces,it was discovered that the top 4"-6"of the poolside gutter wall was built up with mortar material.This material is failing and is only approximately 3"thick,with 1/4"-1/2"of that being a cementitious waterproofing material on the inside of the gutter.Additionally,there appears to have been rebar stubbed up into the mortar bed,which shows signs of corrosion damage and lacks proper rebar coverage.Moreover,tapping on the lower half of the gutter wall produces a hollow sound until reaching the structural pool wall below the gutter.Please see the attached photos for reference. Anderson Poolworks: Provide all labor,supervision,equipment,and materials to accomplish the scopes listed herein.Demolish the existing front gutter wall down to solid concrete.Dowel in#3 FRP rebar at 10"O.C.with(2)#3 FRP horizontal bars at the top of the wall and mid-span.Completely remove/strip the existing waterproofing.Form and rebuild the front gutter wall with shotcrete to accommodate the new coping. Contractor to roughen the existing concrete to at least a''%"amplitude and thoroughly clean the existing surface prior to the placement of shotcrete. Specific Inclusions: • MT GIRT • Prevailing Wage and Certified Payroll The total amount of$66,238 is a not-to-exceed value.Jackson and Anderson Poolworks will track work on a T&M basis(rates listed below).Daily timesheets will be signed by the superintendents of Jackson and APW.Upon completion of the work,a reconciliation will occur to determine the final value,and a subsequent CCO will be sent with the approved value. Labor/Material Description UOM Rate Project Manager hr $ 95.00 Super/Foreman I hr $ 90.00 Laborer hr $ 75.00 Shotcrete yd $ 300.00 Additional Scaffolding Rental day $ 23.65 Bozeman Office page 1 of 2 Printed On:6/18/2024 09:49 AM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 691 PCO #38 Jackson CONTRlwmi?GROuP,INC. PM Travel Expenses LS I $ 2,000.00 Per Diem-Unit cost is a crew of 4 day I $ 180.00 Lodging-House(Demo Crew) night $ 500.00 Lodging-House(FRP/Shotcrete Crew) I night $ 500.00 'Other Direct Job Cost items will be recalculated during reconciliation to reflect the reconciled numbers. `OH/Profit will be recalculated during reconciliation to reflect the reconciled numbers. ATTACHMENTS: Image 11.Ipg Image 10.jpq Image 7.jpq Image 8.jpg_ Image 9.ipq_ Image 5.6pq Image 4.jpq Image 2.ipg Image 3.jpq Image 6.Ipg Image 1.jpg_ # SubJob Cost Code Description Type Amount Provide all labor,supervision,equipment,and materials to accomplish the scopes listed herein.Demolish the existing front gutter wall down to solid concrete.Dowel in#3 FRP rebar at 10" O.C.with(2)#3 FRP horizontal bars at the top of the wall and mid-span.Completely remove/strip the existing waterproofing. Form and rebuild the front gutter wall with shotcrete to 1 03 Bozeman Swim Center-Ph 2 13-1101-ANDERSON POOLS accommodate the new coping.Specifc Inclusions:MT GRT Subcontract $0.00 Prevailing Wage and Certified Payroll The total amount of $66,238 is a not-to-exceed value.Jackson and Anderson Poolworks will track work on a T&M basis(rates listed below). Daily timesheets will be signed by the superintendents of Jackson and APW.Upon completion of the work,a reconciliation will occur to determine the final value,and a subsequent CCO will be sent with the approved value. 2 03 Bozeman Swim Center-Ph 2 01-2116-CONTINGENCY Draw Remainder from Contingency Other $0.00 3 03 Bozeman Swim Center-Ph 2 17-0005-STRUCT.REPAIR AT Draw from Structural Pool Repairs Allowance Other S 0.00 POOL(60 LF) Subtotal: $0.00 Insurance:1.00%Applies to all line item types. $0.00 Contractors Fee:8.00%Applies to all line item types. $0.00 GIRT:1.00%Applies to all line item types. $0.00 Grand Total: $0.00 Ali Vasarella(Cushing Terrell-Missoula) City of Bozeman Jackson Contractor Group,Inc. 306 W Railroad Street,Ste 104 PO Box 1230 PO Box 967 Missoula Montana 59802 Bozeman Montana 59771-1230 Missoula Montana 59806 i06/18/202' 4 Z� 6wti� ✓n 6/18/2024 r �(� �� IGNATURE DATE SIGNATURE DATE SIGNATURE DATE Bozeman Office page 2 of 2 Printed On:6/18/2024 09:49 AM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 PCO #37 Jackson CONTRACTOR GROUP,Nw. Bozeman Office Project:03202202-City of Bozeman Construction Services Contracts 146 Laura Louise Ln 20 East Olive Street Bozeman, Montana 59718 Bozeman, Montana 59715 Phone:(406)577-2772 Phone:406-595-8470 Fax:(406)587-4282 Prime Contract Potential Change Order #37: Natatorium North Wall Painting TO: City of Bozeman FROM: Jackson Contractor Group, Inc. PO Box 1230 PO Box 967 Bozeman Montana,59771-1230 Missoula Montana,59806 PCO NUMBER/REVISION: 37/0 CONTRACT: 03202202-01 -City of Bozeman Swim Center REQUEST RECEIVED FROM: Max Ziegler (City of Bozeman) CREATED BY: Colton Morgan (Jackson Contractor Group, Inc.) STATUS: Pending-In Review CREATED DATE: 6/13/2024 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: Bozeman Swim Center ACCOUNTING Amount Based METHOD: SCHEDULE IMPACT: PAID IN FULL: No TOTAL AMOUNT: $0.00 POTENTIAL CHANGE ORDER TITLE: Natatorium North Wall Painting CHANGE REASON:Allowance POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE#054-Natatorium North Wall Painting Based on conversations between Jackson and the City of Bozeman,it has been requested to paint the north wall of the natatorium.The wall will be painted white to match the other walls.This pricing assumes the current paint on the wall is suitable for repainting without needing to be stripped off.The scoreboard will remain in place.Another Peters Painting will do its best to paint behind the scoreboard;however,there will be areas behind the scoreboard that they will not be able to reach without removing it. Another Peter's Painting -Prep and paint the North mural wall with 2-3 coats as needed to fully cover the current dark paint colors on the wall. ATTACHMENTS: # SubJob Cost Code Description Type Amount 1 03 Bozeman Swim Center-Ph 2 09-9100-ANOTHER PETERS Prep and paint the North mural wall with 2-3 coats as needed to Subcontract $4,000.00 PAINTING fully cover the current dark paint colors on the wall. 2 03 Bozeman Swim Center-Ph 2 01-2116-CONTINGENCY Draw from Contingency Other ($4,000.00) Subtotal: $0.00 Insurance:1.00%Applies to all line item types. $0.00 Contractor's Fee:8.00%Applies to all line item types. $0.00 GRT:1.00%Applies to all line item types. $0.00 Bozeman Office page 1 of 2 Printed On:6/13/2024 08:06 AM Docusign Envelope ID: EDF2A850-2EFB-4071-AOC4-76C7BO5C8188 PCO #37 Jackson Unit/ "eirmR 6ROUP,Vw. Grand Total: Ali Vasarella(Cushing Terrell-Missoula) City of Bozeman Jackson Contractor Group,Inc. 306 W Railroad Street,Ste 104 PO Box 1230 PO Box 967 Missoula Montana 59802 Bozeman Montana 59771-1230 Missoula Montana 59806 06/13/2024OZ&I312024 6 / /j// • ( ��b&`a t iyL�/ 6/13/2024 T DATE SIGNATURE DATE SIGNATURE DATE Bozeman Office page 2 of 2 Printed On:6/13/2024 08:06 AM DocuSign Certificate Of Completion Envelope Id: EDF2A8502EFB4071AOC476C7B05C8188 Status:Completed Subject:Complete with Docusign: PSA_4th_Amendment_-_Jackson_Contractor_Group_-_Swim_Center_GCCM.pdf Source Envelope: Document Pages:43 Signatures:3 Envelope Originator: Certificate Pages:5 Initials:0 Mike Maas AutoNav: Enabled Stamps: 1 PO Box 1230 Envelopeld Stamping: Enabled Bozeman, MT 59771 Time Zone: (UTC-07:00)Mountain Time(US& Mmaas@bozeman.net Canada) IP Address:69.145.83.100 Record Tracking Status:Original Holder:Mike Maas Location: DocuSign 8/7/2024 4:15:17 PM Mmaas@bozeman.net Security Appliance Status:Connected Pool:StateLocal Storage Appliance Status:Connected Pool:City of Bozeman Location: DocuSign Signer Events Signature Timestamp Michael Chase Signed by: Sent:8/7/2024 4:18:20 PM mikec@jacksoncontractorgroup.com Viewed:8/8/2024 10:34:50 AM i SR PROJECT MANAGER EF63c0481E25413e... Signed:8/8/2024 2:43:55 PM JACKSON CONTRACTOR GROUP Security Level: Email,Account Authentication Signature Adoption: Uploaded Signature Image (None) Using IP Address:209.200.215.47 Electronic Record and Signature Disclosure: Accepted:8/8/2024 10:34:50 AM ID:Of9cOf5b-ad39-44fb-8944-6af42744914e Greg Sullivan E876992ACgACA44B Signed by: Sent:8/8/2024 2:43:57 PM gsullivan@bozeman.net Suw",& Viewed:8/8/2024 3:05:50 PM Bozeman City Attorney _ Signed:8/8/2024 3:06:00 PM City of Bozeman,Montana Security Level: Email,Account Authentication Signature Adoption: Pre-selected Style (None) Using IP Address:69.145.83.100 Electronic Record and Signature Disclosure: Accepted:8/8/2024 3:05:50 PM ID:4733890d-2a8e-4ad4-92f2-86f8ef41f316 Chuck Winn ESiigned II � ..II by: Sent:8/8/2024 3:06:02 PM cwinn@bozeman.net Sy g(A1& Viewed:8/8/2024 3:39:07 PM Acting City Manager Signed:8/8/2024 3:39:30 PM City of Bozeman Signature Adoption: Pre-selected Style Security Level: Email,Account Authentication (None) Using IP Address:8.22.11.88 Signed using mobile Electronic Record and Signature Disclosure: Accepted:8/8/2024 3:39:06 PM ID:621a93d9-f098-4cd7-a04c-09fcb2001e32 Mike Maas Signed Sent:8/8/2024 3:39:33 PM mmaas@bozeman.net y Viewed:8/12/2024 9:06:07 AM City Clerk °4?' Signed:8/12/2024 9:06:24 AM City of Bozeman Security Level: Email,Account Authentication (None) Using IP Address:71.15.199.6 Signed using mobile Signer Events Signature Timestamp Electronic Record and Signature Disclosure: Accepted: 1/6/20204:08:14 PM ID:79370d6f-72a4-4837-866f-9ec31 f00062f In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Max Ziegler COPIED Sent:8/12/2024 9:06:27 AM wziegler@bozeman.net Facilities Project Coordinator City of Bozeman Security Level: Email,Account Authentication (None) Electronic Record and Signature Disclosure: Accepted:4/2/2024 9:11:00 AM I D:7351 ca 1 b-bf95-48ff-9fc5-a 1 369b 1 0797f Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 8/7/2024 4:18:20 PM Certified Delivered Security Checked 8/12/2024 9:06:07 AM Signing Complete Security Checked 8/12/2024 9:06:24 AM Completed Security Checked 8/12/2024 9:06:27 AM Payment Events Status Timestamps Electronic Record and Signature Disclosure Electronic Record and Signature Disclosure created on:7/9/2018 4:06:02 PM Parties agreed to:Michael Chase,Greg Sullivan,Chuck Winn,Mike Maas, Max Ziegler CONSUMER DISCLOSURE From time to time, City of Bozeman(we,us or Company)may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through the DocuSign, Inc. (DocuSign) electronic signing system. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions,please confirm your agreement by clicking the `I agree' button at the bottom of this document. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. You will have the ability to download and print documents we send to you through the DocuSign system during and immediately after signing session and, if you elect to create a DocuSign signer account, you may access them for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign `Withdraw Consent' form on the signing page of a DocuSign envelope instead of signing it. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use the DocuSign system to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through the DocuSign system all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure,we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process,please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. How to contact City of Bozeman: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to:jolson@bozeman.net To advise City of Bozeman of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at jolson@bozeman.net and in the body of such request you must state: your previous e-mail address, your new e-mail address. We do not require any other information from you to change your email address.. In addition, you must notify DocuSign, Inc. to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in the DocuSign system. To request paper copies from City of Bozeman To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an e-mail to jolson@bozeman.net and in the body of such request you must state your e-mail address, full name, US Postal address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with City of Bozeman To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign session, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an e-mail to jolson@bozeman.net and in the body of such request you must state your e-mail, full name, US Postal Address, and telephone number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software Operating Windows® 2000, Windows®XP, Windows Vista®; Mac OS®X Systems: Final release versions of Internet Explorer® 6.0 or above (Windows only); Browsers: Mozilla Firefox 2.0 or above (Windows and Mac); SafariTM 3.0 or above (Mac only) PDF Reader: jAcrobatV or similar software may be required to view and print PDF files Screen 800 x 600 minimum Resolution: Enabled Security Allow per session cookies Settings: ** These minimum requirements are subject to change. If these requirements change, you will be asked to re-accept the disclosure. Pre-release (e.g. beta)versions of operating systems and browsers are not supported. Acknowledging your access and consent to receive materials electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you,please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the `I agree' button below. By checking the `I agree' box, I confirm that: • I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC CONSUMER DISCLOSURES document; and • I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and • Until or unless I notify City of Bozeman as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to me by City of Bozeman during the course of my relationship with you.