Loading...
HomeMy WebLinkAboutResolutions 5461 - Resolution Title Unknown DocuSign Envelope ID: B67AOED7-1FEA-416D-9E26-D74CB71A310D V 9x r�� co ro RESOLUTION 5461 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, WHEREAS, the City of Bozeman is proceeding with the Bozeman Swim Center renovation and is in need of a General Contractor / Construction Manager to provide preconstruction and construction services; and WHEREAS, Sec. 18-2-502, MCA, authorizes a local governing body,upon adoption of a resolution to use an alternative project delivery contract upon showing specific statutory criteria have been met; and WHEREAS, the City Commission determines the use of a general contractor/construction manager for preconstruction and construction services is in the best interest of the City. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana: Section 1 The Bozeman City Commission hereby authorizes the use of an alternative delivery project contract for a General Contractor / Construction Manager for services related to the Bozeman Swim Center renovation. Section 2 The City Commission determines: 1. The City has knowledgeable staff including the Strategic Services Director as Project Manager, City Attorney, Facilities Superintendent, Facilities Project Coordinator, and its Architectural and Engineering consultants,who have the capacity to manage an alternative project delivery contract. 2. The contract will be awarded in a manner consistent with state law and City policies through publication of a request for qualifications and a request for proposals submitted to qualified applicants with a final selection to be made upon merit and DocuSign Envelope ID: B67AOED7-1FEA-416D-9E26-D74CB71A310D qualifications. The process will be conducted in a manner that will not encourage favoritism or bias nor substantially diminish competition, by conducting the process in such a manner that only qualified contractors will be eligible, and that the award of the contract will be based on experience and expertise of the applicants. 3. The contract between the City and the General Contractor / Construction Manager will require all subcontractors to be selected through a competitive bidding process in compliance with applicable state and local law. Section 3 The City Commission determines that by using a General Contractor/Construction Manager, the involvement of such a professional will contribute to significant cost savings for the Bozeman Swim Center renovation. Significant cost savings that justify an alternative project delivery contract in this case derive from but are not limited to value engineering, life cycle analysis, and construction planning. In addition, the City Commission determines the project presents significant complexities related to the phasing of construction that necessitate the use of a General Contractor/Construction Manager. PASSED, ADOPTED, AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 6 day of December , 2022 DocuSigned by: B5588C7C 1 BB14E6... CYNTHIA L. ANDRUS Mayor ATTEST: DocuSigned by: DocuSigned by: '92 F 1F9 2095AB475... MIKE MAAS City Clerk APPROVED AS TO FORM: DocuSigned by: 876992AC9ACA44B... GREG SULLIVAN City Attorney