RESOLUTION 5461
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN,
MONTANA,
WHEREAS, the City of Bozeman is proceeding with the Bozeman Swim Center
renovation and is in need of a General Contractor / Construction Manager to provide
preconstruction and construction services; and
WHEREAS, Sec. 18-2-502, MCA, authorizes a local governing body,upon adoption of a
resolution to use an alternative project delivery contract upon showing specific statutory criteria
have been met; and
WHEREAS, the City Commission determines the use of a general
contractor/construction manager for preconstruction and construction services is in the best
interest of the City.
NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of
Bozeman, Montana:
Section 1
The Bozeman City Commission hereby authorizes the use of an alternative delivery project
contract for a General Contractor / Construction Manager for services related to the Bozeman
Swim Center renovation.
Section 2
The City Commission determines:
1. The City has knowledgeable staff including the Strategic Services Director as
Project Manager, City Attorney, Facilities Superintendent, Facilities Project
Coordinator, and its Architectural and Engineering consultants,who have the
capacity to manage an alternative project delivery contract.
2. The contract will be awarded in a manner consistent with state law and City
policies through publication of a request for qualifications and a request for proposals
submitted to qualified applicants with a final selection to be made upon merit and
DocuSign Envelope ID: B67AOED7-1FEA-416D-9E26-D74CB71A310D
qualifications. The process will be conducted in a manner that will not encourage
favoritism or bias nor substantially diminish competition, by conducting the process in
such a manner that only qualified contractors will be eligible, and that the award of the
contract will be based on experience and expertise of the applicants.
3. The contract between the City and the General Contractor / Construction Manager
will require all subcontractors to be selected through a competitive bidding process
in compliance with applicable state and local law.
Section 3
The City Commission determines that by using a General Contractor/Construction Manager, the
involvement of such a professional will contribute to significant cost savings for the Bozeman
Swim Center renovation. Significant cost savings that justify an alternative project delivery
contract in this case derive from but are not limited to value engineering, life cycle
analysis, and construction planning. In addition, the City Commission determines the
project presents significant complexities related to the phasing of construction that necessitate
the use of a General Contractor/Construction Manager.
PASSED, ADOPTED, AND APPROVED by the City Commission of the City of
Bozeman, Montana, at a regular session thereof held on the 6 day of December , 2022
DocuSigned by:
B5588C7C 1 BB14E6...
CYNTHIA L. ANDRUS
Mayor
ATTEST: DocuSigned by:
DocuSigned by: '92
F 1F9 2095AB475...
MIKE MAAS
City Clerk
APPROVED AS TO FORM:
DocuSigned by:
876992AC9ACA44B...
GREG SULLIVAN
City Attorney