Loading...
HomeMy WebLinkAbout010.1 A4.01 - BUILDING SECTIONSFirst Floor 0' -0" Second Floor 10' -5 7/8" Foundation -4' -0" Second Floor T/O Plate 19' -7" B G TRUSS PER MANUFACTURER D1 BED D2 BED BATHDININGENTRY A4.12 4 First Floor 0' -0" Second Floor 10' -5 7/8" Foundation -4' -0" Second Floor T/O Plate 19' -7" DINING KITCHEN LIVING MECH PANTRY KITCHEN LIVING TRUSS PER MANUFACTURER A B H WE2 WE2 WE1 W2 W2 W2 F1 A4.11 1 A4.11 3 First Floor 0' -0" Second Floor 10' -5 7/8" Basement -9' -5" Foundation -4' -0" Second Floor T/O Plate 19' -7" D1 BATH D3 BED BED A5.00 5 TRUSS PER MANUFACTURER D G R1 WE2 W2 W2 W2 W2 W2 WE1 W3 WE2 F1 F2 A4.11 4 CONCRETE STAIRS -PER STRUCTURAL RECESSED MECH ROOM WATER LINE & GENERAL MECH SERVICES WATER LINE TO COME INTO BUILDING UNDER SLAB AND PENETRATE THROUGH FROM BABCOCK -REFER TO CIVIL First Floor 0' -0" Second Floor 10' -5 7/8" Foundation -4' -0" Second Floor T/O Plate 19' -7" 1 2 TRUSS PER MANUFACTURER LIVING D3 BED D2 BED BEDKITCHENE2 BED SCALE: DRAWN: PROJECT NO: DATE: 1/4" = 1'-0" 3/17/2025 1:40:46 PM A4.01 22-013 BUILDING SECTIONS Babcock 5 Plex Maloney Holdings, LLC 1920 W Babcock Street, Bozeman MT 1/4" = 1'-0"3 N/S - SECTION 2 NOT FOR CONSTRUCTION1/4" = 1'-0"2 N/S - SECTION 1 1/4" = 1'-0"1 STAIRS - OVERALL SECTION 1/4" = 1'-0"4 E/W SECTION 3