HomeMy WebLinkAbout010.1 A4.01 - BUILDING SECTIONSFirst Floor
0' -0"
Second Floor
10' -5 7/8"
Foundation
-4' -0"
Second Floor T/O
Plate
19' -7"
B G
TRUSS PER MANUFACTURER
D1 BED D2 BED
BATHDININGENTRY
A4.12
4
First Floor
0' -0"
Second Floor
10' -5 7/8"
Foundation
-4' -0"
Second Floor T/O
Plate
19' -7"
DINING
KITCHEN
LIVING
MECH PANTRY KITCHEN
LIVING
TRUSS PER MANUFACTURER
A B H
WE2
WE2
WE1 W2 W2 W2
F1
A4.11
1
A4.11
3
First Floor
0' -0"
Second Floor
10' -5 7/8"
Basement
-9' -5"
Foundation
-4' -0"
Second Floor T/O
Plate
19' -7"
D1 BATH D3 BED
BED
A5.00
5
TRUSS PER MANUFACTURER
D G
R1
WE2
W2 W2 W2 W2 W2 WE1
W3
WE2
F1
F2
A4.11
4
CONCRETE STAIRS -PER
STRUCTURAL
RECESSED MECH
ROOM
WATER LINE & GENERAL MECH
SERVICES
WATER LINE TO COME INTO BUILDING
UNDER SLAB AND PENETRATE
THROUGH FROM BABCOCK -REFER
TO CIVIL
First Floor
0' -0"
Second Floor
10' -5 7/8"
Foundation
-4' -0"
Second Floor T/O
Plate
19' -7"
1 2
TRUSS PER MANUFACTURER
LIVING D3 BED D2 BED
BEDKITCHENE2 BED
SCALE:
DRAWN:
PROJECT NO:
DATE:
1/4" = 1'-0"
3/17/2025 1:40:46 PM
A4.01
22-013
BUILDING
SECTIONS
Babcock 5 Plex
Maloney Holdings,
LLC
1920 W Babcock
Street, Bozeman MT
1/4" = 1'-0"3 N/S - SECTION 2 NOT FOR CONSTRUCTION1/4" = 1'-0"2 N/S - SECTION 1
1/4" = 1'-0"1 STAIRS - OVERALL SECTION
1/4" = 1'-0"4 E/W SECTION 3