Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
008 A3.00 - EXTERIOR ELEVATIONS
First Floor 0' -0" Second Floor 10' -5 7/8" Second Floor T/O Plate 19' -7" METAL STAIRS & METAL HANDRAILS -SEE SPECS METAL COLUMN - STRUCTURE IN PROGRESS 12345689101113 D A B C B B D B AD1D1D1 D3D3 WE2 WE1 WE2 WE1 WE2 WE1 WE2 WE2 WE2 WE2 5" 12" 5" 12"5" 12" 3" 12" R1 5' - 7 1/2"METAL GABLE VENT -SEE SPECS METAL GABLE VENT -SEE SPECS METAL COLUMN -STRUCTURE IN PROGRESS 12 1x8 WOOD FASCIA BOARD TO MATCH SIDING -SEE SPECS PREFINISHED METAL GUTTER -BLACK - TYP. -SEE SPECS D1 LIGHT WALL SCONCE -SEE SPECS 30 YEAR ASPHALT SHINGLES -SEE SPECS 1x8 WOOD FASCIA BOARD TO MATCH SIDING -SEE SPECS PREFINISHED METAL GUTTER -BLACK - TYP. -SEE SPECS 6X6 DF WOOD ACCENT TIMBER - STAINED SEE SPECS FOR COLOR6X6 DF WOOD ACCENT TIMBER - STAINED SEE SPECS FOR COLOR 1x8 WOOD FASCIA BOARD TO MATCH SIDING -SEE SPECS PREFINISHED METAL GUTTER -BLACK - TYP. -SEE SPECS 1x8 WOOD FASCIA BOARD TO MATCH SIDING -SEE SPECS PREFINISHED METAL GUTTER -BLACK - TYP. -SEE SPECS LIGHT WALL SCONCE - SEE SPECS LIGHT WALL SCONCE - SEE SPECS METAL STAIRS & METAL HANDRAILS -SEE SPECS A5.01 3 BUILDING HEIGHT FROM GRADE29' - 8"7 0' - 4"EC EE E G 7" 12"7" 12" First Floor 0' -0" Second Floor 10' -5 7/8" Second Floor T/O Plate 19' -7" 1 2 3 4 5 6 8 9 10 11 13 A A A D13 A A A A 5" 12" 5" 12" 3" 12" 12 METAL GABLE VENT - SEE SPECS WOOD BALCONY 7 BUILDING HEIGHT FROM GRADE29' - 8"D13 D13 D13 D13 WE2 WE2 WE1 WE1 WE2 WE2 WOOD BALCONYWOOD AWNING 7" 12" 7" 12" 3" 12" PRE-FAB METAL RAILING WE1 WE1 EXTERIOR FINISH LEGEND WE2 FINISH HORIZONTAL WOOD SIDING WE1 FINISH HORIZONTAL WOOD SIDING PIONEER MILLWORKS -ACCOYA SIDING & SHIPLAP TIRAMISU R1 FINISH MALARKEY 30 YEAR SHINGLE MALARKEY PIONEER MILLWORKS -ACCOYA SIDING & SHIPLAP -STORM SCALE: DRAWN: PROJECT NO: DATE: As indicated 1/19/2025 3:02:02 PM A3.00 22-013 EXTERIOR ELEVATIONS Babcock 5 Plex Maloney Holdings, LLC 1920 W Babcock Street, Bozeman MT 1/4" = 1'-0"1 FRONT ELEVATION 1/4" = 1'-0"2 SOUTH ELEVATION NOT FOR CONSTRUCTIONSEE 1/A3.00 FOR TYPICAL MATERIAL CALLOUT FOR EXTERIOR ELEVATIONS BLOCK FRONTAGE CALCULATION NORTH ELEVATION : 2134.68 SF TOTAL FRONTAGE 15% TRANSPARENCY REQUIRED = 320.25 SF CURRENTLY 1806 SF NON-TRANSPARENT SURFACES = 328.68SF TRANSPARENCY 15.39% ACHIEVED