Loading...
HomeMy WebLinkAboutBabcock 5-Plex - Water and Sanitary Sewer Demand Memo M . �M� .� ALPINE SURVEYIIVO M ENOINEERIN O January 3, 2025 City of Bozeman Engineering Department 20 E. Olive Street Bozeman, MT 59715 RE: Water& Sewer Demand Memo Lot 10, Block 1 of Kirk Subdivision, S11,T02S,R05E,Bozeman,MT To Whom it May Concern, The intent of this memo is to outline the anticipated water and sanitary sewer demands for the proposed 5-plex project on Lot 10, Block 1 of Kirk Subdivision. The 0.248-acre site is located on the southeast corner of the intersection of W. Babcock Street and S. 20th Avenue and is currently zoned B-2M. The project site was previously developed with a single structure that was served by a 4" sanitary sewer service draining to the sewer main in the alley, and a 1/4" water service extended from the water main in S 20ffi Avenue. The structure has since been demolished and the proposed 5-unit building will be served by a new 1" water service and 4" fire service from S 20'h Avenue. The existing sanitary sewer service will be preserved and connected to the proposed building. 1.0 Water Demand In order to be consistent with the sanitary sewer estimates, the water demand calculations for the proposed project were computed using 2.17 people per dwelling unit, based on Section 2.3.5 of the 2015 City of Bozeman Wastewater Collection Facilities Plan Update. Per the COB Design Standards and Specifications Policy (COB DSSP), a water demand of 170 gallons per capita per day is to be used when calculating water demand. As outlined in the COB DSSP,peaking factors of 2.3 and 3.0 were used to calculate Maximum Day and Peak Hour Demand, respectively. The below table provides the estimated water demands based on be above assumptions. Peak water Demand Calculations Type Dwelling Units Population Average Day GPM Max Day(GPM) Peak Hour(GPM) Residential 5 10.85 1.28 2.95 3.84 714 Stoneridge Drive•Suite 3•Bozeman,MT 59718•(406)586-5599•www.alpinesuryeying.net Page 1 2.0 Sanitary Sewer Demand There are several ways to estimate Sanitary Sewer flows, including standards set forth by the Montana DEQ Circular 2, Montana DEQ Circular 4, and the COB DSSP. However,the projected wastewater flows in this memo are calculated using the values provided in the City of Bozeman Wastewater Collection Facilities Plan Update Final — 2015. This document provides an updated estimate of 2.17 persons per dwelling unit within the City of Bozeman Planning Area, which differs slightly from the 2.11 person/du estimate outlined in the COB DSSP. The facilities plan update also provides an updated wastewater generation estimate of 64.4 gallons per day per capita based on extensive research of the existing system instead of the 89 gpcd estimate outlined in the COB DSSP. The peaking factor is based on the Harmon Formula and an infiltration rate of 150 gallons per acre per day was also applied to the project,both as outlined in the COB DSSP. Based on these criteria,the estimated demands from the proposed project are included in the table below. Peak Sanitary Sewer Demand Calculation Average Day Average Day Peaking Peak Hour Infiltration Design Flow sign Dwelling Units Population Flow(GPD) Flow(GPM) Factor Flow(GPM) (GPM) Rate(GPM) Flow Rate cfs 5 11 708.4 0.49 4.41 2.16 0.03 2.19 0.0049 Total Lot Area 0.25 lAcres Infiltration Rate 150 Gal./Acre/Day Total Infiltration 0.03 JGPM 4"PVC Pipe Capacity Pipe Size(in) IFlow Depth-d(in)l Slope(ft/ft) I Manning's n I Flow(CFS) 4 1 3 1 0.02 1 0.012 1 0.27 Please feel free to contact me with any questions at(406) 586-5599, or by email at ecote allpinesurveying.net. N TA Sincerely, •• �d '• • ET HAN L • COTE No. 60593PE • w 0 . T•.�, �13Jas o •_ Ethan Cote, P.E 60593 %0ss,• �OINALI\ ����`� 714 Stoneridge Drive•Suite 3•Bozeman,MT 59718•(406)586-5599 www.alpinesurveying.net Page 2