587-01 Babcock 5-plex - Stormwater Design Report Page 1
1/3/2025
TABLE OF CONTENTS
Overview ......................................................................................................................................... 2
Existing Conditions ........................................................................................................................... 2
Stormwater Design Criteria ............................................................................................................. 2
APPENDIX
Appendix A ........................................................................................................ Drainage Basin Map
Appendix B ............................................................................................ Storage Facility Calculations
Appendix C ..................................................................................... Stormwater Facilities O&M Plan
Appendix D ........................................................................................................ Geotechnical Report
587-01 Babcock 5-plex - Stormwater Design Report Page 2
1/3/2025
OVERVIEW
The purposed of this report is to detail the stormwater management design for the multi-family
development at 1920 W Babcock Street Bozeman, MT. The property is located on the SE corner of the
intersection of W Babcock Street and 29Th Avenue and is legally described as Lot 10 of Kirk Subdivision
Block 1, Section 11, Township 2S, Range 5E. The proposed project will include the construction of a 6,860
square foot 5-plex apartment building with associated parking area and sidewalks.
EXISTING CONDITIONS
Although the site is currently vacant, the property previously contained an office building for Allstate
insurance with a paved parking area and perimeter landscaping. The existing building and parking area
were demolished within the last two years to prepare the site for the proposed 5-plex. The previous
structure had a slightly smaller footprint than the proposed building, but the existing parking area was
significantly larger, resulting in a similar lot coverage coefficient to the proposed development.
Based on an existing conditions survey and historical street view and aerial imagery, it is estimated that
the north / northwestern portion of the property previously drained off site to the curb inlet in W Babcock
Street (see pre-development drainage basin 1). The southern and eastern portions of the site appeared
to drain to low points on site or on the southern property line (pre-development drainage basin 2).
Rawhide Engineering completed a geotechnical investigation for the property in March 2023 which found
that the property is generally covered by several feet of either fill or a native sandy lean clay, followed by
native gravel starting at depths of 3-6 feet bgs. The test pits were excavated to 7-9 feet bgs and
groundwater was not encountered in any of the pits. A groundwater monitoring well will be installed in
Spring of 2025 to capture seasonal high groundwater elevations, but based on the geotechnical
investigation, groundwater is not expected to impact the proposed stormwater retention system.
STORMWATER DESIGN CRITERIA
The proposed stormwater water improvements are designed to meet the requirements of the City of
Bozeman Standards and Specifications, adopted in March of 2020. The drainage policy requires retention
facilities to be designed using the modified rational method to retain the 10-year, two-hour storm
intensity. Figure I-3 in the city standards provides a table of rainfall intensities for use in the City of
Bozeman. The intensity for a 10-year, two-hour storm is 0.41in/hr. In order to determine the stormwater
retention requirements for the proposed improvements, the project site is divided into 3 individual
drainage basins. Dimensionless C-Coefficients used in the Rational Peak Discharge Method were assigned
to impervious and pervious areas for each drainage basin. Impervious areas such as concrete, asphalt, and
impervious roofing were assigned a C-Coefficient of 0.95. Pervious landscaped and pervious areas were
assigned a C-Coefficient of 0.20. A drainage basin map outlining the proposed drainage basin and
retention facilities is included in Appendix A of this report.
A combination of site grading, curb and gutter, and roof downspouts will be used to convey water to the
proposed vegetated swales and on-site drywells. The dry well system will consist of two concrete
structures connected via 40’ of 8” HDPE Perforated Pipe surrounded by 24” of washed rock backfill. This
system is shown on C5.0 and detailed on C6.0 of the site plan.
587-01 Babcock 5-plex - Stormwater Design Report Page 3
1/3/2025
Post-development Drainage Basins 1 and 2 include the northern and western portions of the site that will
sheet flow to the adjacent street right-of-ways. These areas do not generate any additional stormwater
runoff when compared to pre-development Drainage Basin 1 and thus meet the allowable runoff from
the site. Post-development Drainage basin 3 includes the southern and eastern portions of the site that
historically did not drain off-site. Therefore, Drainage Basin 3 is designed to retain all stormwater from
the 10-year, 2-hour event on-site in the dry well system. Runoff volumes for each basin are provided in
Appendix B and are summarized in Table A below.
Drainage Basin Runoff Volume Summary (2-year, 1 hour Storm Event)
Drainage
Basin
Area
(Ac.)
C-
Value I (in/hr) Q (2-yr)
(cfs)
Vreq
(ft3)
Vpro
(ft3) Facility
Pre-1 0.11 0.6 0.41 0.03 189 - Pre-Development Basin 1
Pre-2 0.14 0.67 0.41 0.04 282 - Pre-Development Basin 2
1 0.03 0.58 0.41 0.01 44 - Off - Site (Babcock St Inlet)
2 0.06 0.71 0.41 0.02 131 - Off - Site (Babcock St Inlet)
3 0.16 0.67 0.41 0.04 322 394.5 Drywell System A
Table A – Runoff and Retention Volume Summary
Appendix A
Drainage Basin Map
STMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTM STM STM STM STM STM STM STM STM STM STM STM STM STM
STMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMN 00°08'37" E74.61'N 89°31'56" E
144.75'S 00°08'35" W75.21'S 89°46'01" W
144.74'OSW C O
WEST BABCOCK ST.SOUTH 20TH AVE.4825 4825
4825
4824
482
5
4824
4823
4825
PROJECT NO:
DATE:
ENGINEER:
REVISIONS
DATENO.DESC.
587-01
12/23/2024
ELC
FIGURE
1
10'0 20'
1" = 10'SCALE
N
SHEET OF 21BABCOCK 5-PLEXPRE-DEVELOPMENT DRAINAGE BASIN MAPBOZEMAN, MONTANALOT 10, BLOCK 1, KIRK SUBDIVISIONLEGEND
DRAINAGE BASIN BOUNDARY
DRAINAGE BASIN COVER TYPE - PERVIOUS
SYMBOL DESCRIPTION
DRAINAGE BASIN COVER TYPE - IMPERVIOUS
DRAINAGE BASIN 1
0.11 AC
DRAINAGE BASIN 2
0.14 AC
EX. CURB INLET (TYP.)
DRAINAGE DIRECTION
GASGASGASGASGASGASGASGASGASGASGASGASGASSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTM STM STM STM STM STM STM STM STM STM STM STM STM STM
STMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMN 00°08'37" E74.61'N 89°31'56" E
144.75'S 00°08'35" W75.21'S 89°46'01" W
144.74'OSW
DRYWELL A-1 (2.0') (BEEHIVE GRATE)
RIM:4824.10
INV OUT:4820.40 (8")(W)
DRYWELL A-2 (2.0') (BEEHIVE GRATE)
RIM:4824.10
INV IN:4820.40 (8")(E)
43' of 8" HDPE PIPE @ 0.00%
WEST BABCOCK ST.SOUTH 20TH AVE.PROJECT NO:
DATE:
ENGINEER:
REVISIONS
DATENO.DESC.
587-01
1/3/2025
ELC
FIGURE
2
10'0 20'
1" = 10'SCALE
N
SHEET OF 22
LEGEND
DRAINAGE BASIN BOUNDARY
DRAINAGE BASIN COVER TYPE - PERVIOUS
STORM MANHOLE
STORM INLET
STORM CATCH BASIN
STORM POND / SWALE
SYMBOL DESCRIPTION
ST
DRAINAGE BASIN COVER TYPE - IMPERVIOUS
BABCOCK 5-PLEXPOST-DEVELOPMENT DRAINAGE BASIN MAPBOZEMAN, MONTANALOT 10, BLOCK 1, KIRK SUBDIVISIONCURB CHASE
DRAINAGE BASIN 1
0.02 AC
DRAINAGE BASIN 2
0.06 AC
DRAINAGE BASIN 3
0.16 AC
RETENTION SYSTEM
REQ. STORAGE VOL: 320 FT3
PRO. STORAGE VOL: 394.5 FT3
BOT. OF STONE ELEV: 4817.40'
SHGW ELEV: 4817.10'
EX. CURB INLET TO
RECEIVE RUNOFF
FROM DB 1 AND 2
DRAINAGE DIRECTION
Appendix B
Drainage Basin & Storage Facility Calculations
Design Rainfall Frequency (year):10 Storage Method:N/A
Rational Method Peak Runoff Equation:Q = CIA Discharge Method:N/A
Q = Peak Runoff Rate (cfs)Facility Type:N/A
C = Runoff Coefficient Facility Make/Model:N/A
I = Rainfall Intensity (in/hr):0.41
A = Drainage Basin (acres)
Land Use Drainage Basin
Number Contributing Area (sf)Contributing Area (Ac)
Runoff Coe.
(C)A (Ac) x C
DB - Impervious 1 2484 0.057 0.95 0.0542
DB - Pervious 1 2117 0.049 0.2 0.0097
Totals 4,601 0.11 0.0639
Weighted C:0.60
Total Area (Acres) = 0.11
Weighted C =0.60
Intensity (in/hr) = 0.41
Duration (hr)2.00
Q (cfs) =0.03
Pre-Development Runoff Volume (ft3)=189
Generated Runoff Volume - 10 year
Storage Facility Calculations
Pre-Development Basin 1
Basis For Calculations Storage Facility Information
Contributing Area & Runoff Coefficient Tabulation
Design Rainfall Frequency (year):10 Storage Method:N/A
Rational Method Peak Runoff Equation:Q = CIA Discharge Method:N/A
Q = Peak Runoff Rate (cfs)Facility Type:N/A
C = Runoff Coefficient Facility Make/Model:N/A
I = Rainfall Intensity (in/hr):0.41
A = Drainage Basin (acres)
Land Use Drainage Basin
Number Contributing Area (sf)Contributing Area (Ac)
Runoff Coe.
(C)A (Ac) x C
DB - Impervious 2 3889 0.089 0.95 0.0848
DB - Pervious 2 2352 0.054 0.2 0.0108
Totals 6,242 0.14 0.0956
Weighted C:0.67
Total Area (Acres) = 0.14
Weighted C =0.67
Intensity (in/hr) = 0.41
Duration (hr)2.00
Q (cfs) =0.04
Pre-Development Runoff Volume (ft3)=282
Generated Runoff Volume - 10 year
Storage Facility Calculations
Pre-Development Basin 2
Basis For Calculations Storage Facility Information
Contributing Area & Runoff Coefficient Tabulation
Design Rainfall Frequency (year): 10 Storage Method: N/A
Rational Method Peak Runoff Equation: Q = CIA Discharge Method: N/A
Q = Peak Runoff Rate (cfs) Facility Type: N/A
C = Runoff Coefficient Facility Make/Model: N/A
I = Rainfall Intensity (in/hr): 0.41
A = Drainage Basin (acres)
Land Use Drainage Basin
Number Contributing Area (sf) Contributing Area (Ac)
Runoff Coe.
(C)A (Ac) x C
DB - Impervious 1 577 0.013 0.95 0.0126
DB - Pervious 1 517 0.012 0.2 0.0024
Totals 1,094 0.03 0.0149
Weighted C:0.60
Total Area (Acres) = 0.03
Weighted C = 0.60
Intensity (in/hr) = 0.41
Duration (hr) 2.00
Q (cfs) = 0.01
Req. Runoff Volume (ft3)=44
Storage Facility Calculations
Drainage Basin 1
Basis For Calculations
Contributing Area & Runoff Coefficient Tabulation
Generated Runoff Volume - 10 year
Storage Facility Information
Design Rainfall Frequency (year):10 Storage Method:N/A
Rational Method Peak Runoff Equation:Q = CIA Discharge Method:N/A
Q = Peak Runoff Rate (cfs)Facility Type:N/A
C = Runoff Coefficient Facility Make/Model:N/A
I = Rainfall Intensity (in/hr):0.41
A = Drainage Basin (acres)
Land Use Drainage Basin
Number Contributing Area (sf)Contributing Area (Ac)
Runoff Coe.
(C)A (Ac) x C
DB - Impervious 2 1856 0.043 0.95 0.0405
DB - Pervious 2 857 0.020 0.2 0.0039
Totals 2,714 0.06 0.0444
Weighted C:0.71
Total Area (Acres) = 0.06
Weighted C =0.71
Intensity (in/hr) = 0.41
Duration (hr)2.00
Q (cfs) =0.02
Req. Runoff Volume (ft3)=131
Generated Runoff Volume - 10 year
Storage Facility Calculations
Drainage Basin 2
Basis For Calculations Storage Facility Information
Contributing Area & Runoff Coefficient Tabulation
Design Rainfall Frequency (year): 10 Storage Method: Retention
Rational Method Peak Runoff Equation: Q = CIA Discharge Method: N/A
Q = Peak Runoff Rate (cfs) Facility Type: Dry Well
C = Runoff Coefficient Facility Make/Model: N/A
I = Rainfall Intensity (in/hr): 0.41
A = Drainage Basin (acres)
Land Use Drainage Basin
Number Contributing Area (sf) Contributing Area (Ac)
Runoff Coe.
(C)A (Ac) x C
DB - Impervious 3 4,461 0.1024 0.95 0.097283
DB - Pervious 3 2,573 0.0591 0.2 0.011815
Totals 7,034 0.16 0.1091
Weighted C:0.68
Total Area (Acres) = 0.16 Drywell A-1 - Inner Diameter (ft) 2
Weighted C = 0.68 Depth (ft) 6
Intensity (in/hr) = 0.41 Arywell A-2 - Inner Diameter (ft) 2
Duration (hr)2.00 Depth (ft) 6
Q (cfs) = 0.04 Lateral Diamter (inches) 8
Req. Runoff Volume (ft3)=322 Lateral Length (ft) 40
Volume of Lateral (ft3)14.0
Washed Rock Porosity 40%
Lateral Washed Rock Offset (inches) 24
Volume of Washed Rock Around Lateral (ft3)342.9
Volume of Drywell 5A (ft3)19
Volume of Drywell 5B (ft3)19
Total Ret Volume (ft3)394.5
Generated Runoff Volume - 10 year, 2 hour Storm Provided Retention (Drywell)
Storage Facility Information
Storage Facility Calculations
Drainage Basin 3
Basis For Calculations
Contributing Area & Runoff Coefficient Tabulation
Appendix C
Stormwater Facilities Operation and Maintenance Plan
Babcock 5-Plex – Stormwater Facilities Operation & Maintenance Plan Page 1
January 2025
STORMWATER FACILITIES OPERATION & MAINTENANCE PLAN
FOR: Babcock 5-plex – Lot 10, Block 1, Kirk Subdivision
PROPERTY DESCRIPTION
Lot 10, Block 1, Kirk Subdivision, City of Bozeman, Gallatin County, Montana
RESPONSIBLE PARTY
Maloney Holdings LLC
C/O Gallardo Trust Company
136 S Dakota Ave
Sioux Falls, SD 57104
(406) 586-5599
STORMWATER FACILITIES DESCRIPTION
Vegetated Swales: Swales should be maintained as detailed on the approved “Babcock 5-Plex
Civil Site Plan Set” by Alpine Surveying and Engineering. These swales should be fully vegetated
with grass that is trimmed regularly. Swales should maintain a minimum depth of 6” and should
have a 1% longitudinal slope to convey water to storm chases or inlets.
Storm Chases: Storm chases should adhere to City of Bozeman Standard Drawing No. 02529-14
and should have 6” minimum depth and 1’ minimum width.
Storm Sewer Network: The site storm sewer network is comprised of HDPE Perf Pipe and
Drywell Structures to capture runoff from the rear of the site and alley parking area. This system
is installed as depicted on the approved “Babcock 5-Plex Civil Site Plan Set” by Alpine Surveying
and Engineering.
INSPECTION & MAINTENANCE SCHEDULE
The stormwater facilities on site will be inspected and maintained based on the below schedule.
Inspection and maintenance will be performed by the responsible party, the facility employees, or a
contracted third party.
Inspection: Routine inspection of stormwater facilities will include visual inspection to ensure the
facilities are functioning properly and there is no debris accumulated in or clogging the
stormwater facilities. Inspections should also be performed after major storm events producing
approximately 0.5” of rainfall in a 24-hour period. These inspections shall include observations of
the stormwater facilities for areas of erosion or areas of ponding, and removal of accumulated
trash or debris in facilities.
Maintenance: Maintenance shall be performed as necessary based on inspections, and at regular
intervals throughout the year based on the schedule below. Routine Maintenance will generally
include removal of trash, overgrown vegetation, grass clippings, leaves, accumulated sediment,
and obstructions in stormwater facilities. Major maintenance will be scheduled as necessary to
Babcock 5-Plex – Stormwater Facilities Operation & Maintenance Plan Page 2
January 2025
repair or replace damaged storm structures and to revegetate areas of erosion or dead
vegetation.
Inspection & Maintenance Schedule
BMP
Inspection Frequency
A=Annual, M=Monthly, S=After Major
Storm, Q=Quarterly, SA=Semi Annually
Maintenance Frequency
Catch Basin / Storm Inlet Q 1 / year
Swale M 2-3 / year
Storm Chase Q 2-3 / year
Dry Well A 1 / year
Underground Storage System SA 1 / year
Infiltration Trenches A, S 2-3 / year
Table Source: Stormwater Equipment Manufacturers Association
Appendix D
Geotechnical Report