Loading...
HomeMy WebLinkAboutPRE & POST BASIN MAP1 OF 1PRE-DEVELOPED BASIN MAP BASIN A NPGIS AREA= 26,232 SFTOTAL AREA= 26,232 SFTc=260 LFSHEETDESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:REV DATE REVISION NOT FORCONSTRUCTION INTERMOUNTAIN INFRASTRUCTURE GROUP BOZEMAN, MONTANA S23-021-0712/17/2024LAMSNMDAPEngineering 303 EAST 2ND AVE. • SPOKANE, WASHINGTON 99202 509.622.2888 • tdhengineering.com AG NN PORONALE FESSIANTMOR INEE PERMIT SET - NOT FOR CONSTRUCTIONLEGENDMAJOR EXISTINGCONTOURMINOR EXISTINGCONTOURTIME OF CONCENTRATION (TOC)LEASE LOT AREA 1 OF 1POST-DEVELOPED BASIN MAPSHEET DESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:REV DATE REVISION NOT FORCONSTRUCTION INTERMOUNTAIN INFRASTRUCTURE GROUP BOZEMAN, MONTANA S23-021-0712/17/2024LAMSNMDAPEngineering 303 EAST 2ND AVE. • SPOKANE, WASHINGTON 99202 509.622.2888 • tdhengineering.com AG NN PORONALE FESSIANTMOR INEE PERMIT SET - NOT FOR CONSTRUCTIONBASIN B NPGIS AREA= 22,483 SFTOTAL AREA= 22,483 SFTc=260 LFLEGENDMAJOR EXISTINGCONTOURMINOR EXISTINGCONTOURTIME OF CONCENTRATION (TOC)LEASE LOT AREABASIN A ROOF AREA= 432 SFCONCRETE AREA= 256 SFGRAVEL AREA= 2640 SFSWALE/DITCH AREA = 447 SFTOTAL AREA= 3,775 SFTc=110 LF