Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
056 - E1.1.1 - SITE PLAN -ELECTRICAL
DN S0WWV WV WV WEST BEALL STREET NORTH TRACY AVEWEST LAMME STREETNORTH WILLSON AVEEHLS2A-7 +9' AFG S2E H1A-1 +9' AFG S1 H1A-1 +9' AFG S1 EHLS2A-7 S3E H1A-1 S3 H1A-1 +9' AFG S1 H1-1 P1 EHLS1-1 +9' AFG S2E H1-1 +9' AFG S2 H1-1 +9' AFG S1 H1-1 +9' AFG S1 H1-1 +9' AFG S1H1-1 +9' AFG S1 H1-1 +9' AFG S1 H1-1 +9' AFG S2 H1-1 +9' AFG S2 EHLS1-1 +9' AFG S2E H1-1 +9' AFG S2 H1-1 P1 H1A-1 +9' AFG S1 EHLS2A-7 +9' AFG S1E H1A-1 +9' AFG S1 EHLS2A-7 +9' AFG S4E EHLS1-1 +9' AFG S2E 2107 2107 GEN-600KW MSD UTILITY TRANSFORMER MDBH ATS EQ ATS LS H1-1 P1 H1-1 P1 2107 2107 H1-1 +9' AFG S1 2241 H1A-1 +9' AFG S1 H1-1 +9' AFG S2 FACP EHLS2A-7 +9' AFG S4E H1A-1 +9' AFG S1 H1A-1 +9' AFG S1 H1A-1 +9' AFG S1 H1-1 +9' AFG S1 H1-1 +9' AFG S1 H1-1 +9' AFG S1 H1-1 +9' AFG S1 H1-1 +9' AFG S1 H1-1 +9' AFG S1 H1-1 +9' AFG S1 H1-1 +9' AFG S1 H1-1 +9' AFG S1 H1-1 +9' AFG S1 H1-1 +9' AFG S1 H1-1 +9' AFG S1 EHLS1-1 S3E H1-1 +9' AFG S1 H1-1 +9' AFG S1 H1-1 +9' AFG S2 H1-1 +9' AFG S2 H1-1 +9' AFG S2 H1-1 +9' AFG S2 H1-1 +9' AFG S2 EHLS1-1 +9' AFG S2E EHLS1-1 +9' AFG S2E H1-1 S3 EHLS1-1 S3E MTS LS 2253 2266 2243 2244 2251 2247 2242 22612256 2246 2250 2249 IMEG RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG AND SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF IMEG. ©2024 IMEG CONSULTANTS CORP. REF. SCALE IN INCHES 0 1 2 3 N E C PROJECT DRAWING PROJ. NO. SHEET GENERAL NOTES ISSUANCES DATE B A 1 E D C B A PROJECT TEAM © 2023 COPYRIGHT G|R|E|C ARCHITECTS BUILDING DEPT STAMP D SEAL 1. THIS DOCUMENT WITH THE ACCOMPANYING DRAWINGS, SPECIFICATIONS AND/OR PROJECT MANUAL, DESCRIBES THE GENERAL SCOPE OF THE PROJECT AND DESIGN CONCEPT AND DESIGN CONCEPT IN TERMS OF THE INTERIOR DESIGN, ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING SYSTEMS. THESE DOCUMENTS DO NOT NECESSARILY INDICATE OR DESCRIBE ALL OF THE WORK REQUIRED FOR THE FULL PERFORMANCE AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE SCOPE INDICATED, DESCRIBED OR INFERRED, THE CONTRACTOR SHALL DETERMINE AND INCLUDE IN THE PROPOSALS ALL ITEMS NECESSARY TO PROVIDE PROPER EXECUTION AND COMPLETION OF THE WORK. 2. DO NOT SCALE DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONFIRM ANY EXISTING SITE CONDITIONS, AND SHALL NOTIFY THE ARCHITECT OF ANY DIMENSIONAL DISCREPANCIES PRIOR TO BEGINNING WORK. GR E CArchitects| | | OWNE 2345678 12345678 PROJECT #23008933.00 10/31/2024 5:31:02 PM Autodesk Docs://2215 - Bozeman MT/MEPT24_22008933.00_GREC-Bozeman-MT-Hotel Bozeman_C.rvtHOTEL BOZEMAN 205 N TRACY AVE. BOZEMAN, MT E1.1.1 SITE PLAN - ELECTRICAL 2215 ARCHITECT G|R|E|C ARCHITECTS, LLC INTERIOR DESIGN G|R|E|C ARCHITECTS, LLC STRUCTURAL ENGINEER D'AMATO CONVERSANO INC. MEPFP ENGINEER IMEG CORP. CIVIL ENGINEER STAHLY ENGINEERING & ASSOCIATES LANDSCAPE ARCHITECT DESIGN.5 LANDSCAPE ARCHITECTURE HOTEL BOZEMAN INVESTORS, LLC NOR HT 1/16" = 1'-0" SITE PLAN - ELECTRICAL1 KEYNOTES 2107 SEE POLE BASE DETAIL ON SHEET E1.1.3, TYPICAL FOR ALL TYPE P1 POLE LIGHTS. 2241 PROVIDE CONDUITS TRENCHED UNDERGROUND FOR MAIN DISTRIBUTION BOARD MDBH, MTS-LS, ATS-LS, ATS-EQ, EPO, FUTURE FACP, FUTURE MTS AND SPARE CONDUIT. REFER TO ONE LINE DIAGRAM FOR ADDITONAL ELECTRICAL INFORMATION. 2242 (7) 3" CONDUITS FROM MAIN SERVICE DISCONNECT LOCATED AT UTILITY YARD TO MDBH. 2243 (1) 1 1/4" CONDUIT FROM GENERATOR TO MTS-LS. 2244 (2) 2 1/2" AND (1) 1" FROM GENERATOR TO ATS-EQ FOR POWER AND CONTROL. 2246 PROVIDE WEATHERPROOF, LOCKABLE EPO WITH PLACARD FOR SHUT DOWN OF GENERATOR. PLACARD TO READ "EMERGENCY SHUT DOWN OF GENERATOR LOCATED AT UTILITY YARD". COORDINATE EXACT LOCATION WITH FIRE MARSHAL, OWNER AND ARCHITECT PRIOR TO ROUGH IN. 2247 PROVIDE PERMANENT PLACARD ON MDBH THAT READS "FED FROM MSD LOCATED IN UTILITY YARD" 2249 PROVIDE (2) 1 1/4" CONDUIT WITH PULL STRING FOR FUTURE MANUAL TRANSFER SWITCH. STUB UP, CAP, AND LABEL ACCORDINGLY. 2250 PROVIDE (2) 2" SPARE CONDUIT WITH PULL STRING. STUB UP, CAP, AND LABEL AS SPARE. 2251 (1) 1" CONDUIT FROM GENERATOR TO ATS-LS FOR CONTROL. 2253 PROVIDE (1) 1" CONDUIT WITH PULL STRING TRENCHED UNDERGROUND FROM FACP LOCATED MAIN ELECTRICAL ROOM FOR FUTURE FIRE ALARM TIE IN. STUB UP IN UTILITY YARD, CAP AND LABEL ACCORDINGLY. 2256 (1) 1" CONDUIT FROM GENERATOR TO EPO. 2261 (1) 1" CONDUIT FROM GENERATOR TO GENERATOR ANNUNCIATOR PANEL. 2266 MANUAL TRANSFER SWITCH MTS-LS AND ASSOCIATED GENERATOR CONNECTION CABINET. SEE ONE LINE DIAGRAMS FOR ADDITIONAL ELECTRICAL REQUIREMENTS AND INFORMATION. GENERAL NOTES 1. REFER TO ARCHITECTURAL PLANS FOR BUILDING ELEVATIONS. 2. ALL SITE LIGHTING SHALL BE ON LIGHTING SEQUENCE {LE1}, UNLESS NOTED OTHERWISE. REFER TO SHEET E1.1.3 FOR CONTROL SEQUENCE. 3. ALL EXTERIOR SITE LIGHTING CIRCUITS SHALL TO HAVE MINIMUM #10AWG CONDUCTORS. ADJUST SIZE AS NECESSARY TO ACCOUNT FOR MAXIMUM 2.5% VOLTAGE DROP. MINIMUM CONDUIT SIZE IS 1"SCH 40 PVC. 4. REFER TO POWER PLANS FOR ADDITIONAL CONDUIT ROUTING, ELECTRICAL REQUIREMENTS AND INFORMATION.. 5. REFER TO ONE LINE DIAGRAM AND FEEDER SCHEDULE FOR ADDITIONAL ELECTRICAL REQUIREMENTS AND INFORMATION. NO. ISSUED FOR DATE SITE PLAN REVIEW 06/16/2023 SITE PLAN REVIEW RC1 01/30/2024 SITE PLAN REVIEW RC2 04/26/2024 SITE PLAN REVIEW RC3 10/31/2024 10/31/2024