Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
051.1 - A.203 - EAST AND WEST ELEVATIONS HOTEL WEST
LEVEL 0216' -0"ROOF WEST70' -0"LEVEL 010' -0"15LEVEL 03 WEST26' -5"LEVEL 04 WEST36' -10"LEVEL 05 WEST47' -3"LEVEL 06 WEST57' -8"MTL-15WD-02WD-028' - 9"12' - 4"10' - 5"10' - 5"10' - 5"10' - 5"16' - 0"OPEN TO INTERIORMTL-09WIN-04MTL-10MTL-15WIN-04ST-02RS-01WIN-02WIN-02WIN-02WIN-02TYP.TYP.141211101311.19.8PENT ROOF WEST78' -9"WIN-02ST-02WIN-02CON-01ST-02W/ DIVIDED LITES AS SHOWNOVERHANG15' - 0"MTL-08OVERHANG13' - 0"ST-019LEVEL 0216' -0"ROOF WEST70' -0"LEVEL 010' -0"15LEVEL 03 WEST26' -5"LEVEL 04 WEST36' -10"LEVEL 05 WEST47' -3"LEVEL 06 WEST57' -8"CON-0112' - 4"10' - 5"10' - 5"10' - 5"10' - 5"16' - 0"MTL-02MTL-10MTL-15WD-03WD-02MTL-07RS-01ST-02MTL-12MTL-02MTL-15WIN-04TYP.LANDSCAPE SCREEN; SEE LANDSCAPE PLANS141211101311.19.8PENT ROOF WEST78' -9"MTL-02MTL-12MTL-12OVERHANG15' - 9"ST-02GAS METER9ECPROJECTDRAWINGPROJ. NO.SHEETGENERAL NOTESISSUANCESDATEBA1EDCBAPROJECT TEAM© 2023 COPYRIGHT G|R|E|C ARCHITECTSBUILDING DEPT STAMPDSEAL1. THIS DOCUMENT WITH THE ACCOMPANYING DRAWINGS, SPECIFICATIONS AND/OR PROJECT MANUAL, DESCRIBES THE GENERAL SCOPE OF THE PROJECT AND DESIGN CONCEPT AND DESIGN CONCEPT IN TERMS OF THE INTERIOR DESIGN, ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING SYSTEMS. THESE DOCUMENTS DO NOT NECESSARILY INDICATE OR DESCRIBE ALL OF THE WORK REQUIRED FOR THE FULL PERFORMANCE AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE SCOPE INDICATED, DESCRIBED OR INFERRED, THE CONTRACTOR SHALL DETERMINE AND INCLUDE IN THE PROPOSALS ALL ITEMS NECESSARY TO PROVIDE PROPER EXECUTION AND COMPLETION OF THE WORK.2. DO NOT SCALE DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONFIRM ANY EXISTING SITE CONDITIONS, AND SHALL NOTIFY THE ARCHITECT OF ANY DIMENSIONAL DISCREPANCIES PRIOR TO BEGINNING WORK.GRECArchitects| | |OWNER2345678123456784/26/2024 12:23:31 PM Autodesk Docs://2215 - Bozeman MT/ARCH- 2215 BOZEMAN.rvtHOTEL BOZEMAN205 N TRACY AVE.BOZEMAN, MTA.203EAST AND WESTELEVATIONS -HOTEL WEST2215ARCHITECTG|R|E|C ARCHITECTS, LLCINTERIOR DESIGNG|R|E|C ARCHITECTS, LLCSTRUCTURAL ENGINEERD'AMATO CONVERSANO INC.MEPFP ENGINEERIMEG CORP.CIVIL ENGINEERSTAHLY ENGINEERING & ASSOCIATESLANDSCAPE ARCHITECTDESIGN.5 LANDSCAPE ARCHITECTUREHOTEL BOZEMAN INVESTORS, LLCSCALE3/32" = 1'-0"E8EAST ELEVATION - HOTEL WESTSCALE3/32" = 1'-0"C8WEST ELEVATION - HOTEL WESTNO. ISSUED FOR DATESITE PLAN REVIEW 06/16/2023SITE PLAN REVIEW RC1 01/31/2024SITE PLAN REVIEW RC2 04/26/2024EXTERIOR MATERIALS & COMPONENTSDESIGNATION DESCRIPTIONBRK-01 MODULAR FACE BRICK; INTERSTATE 'MOUNTAIN RED' SMOOTH, RUNNING BOND U.N.O.BRK-02 MODULAR FACE BRICK; INTERSTATE 'IRONSTONE' RUFF, BOND AS INDICATEDBRK-03 MODULAR FACE BRICK; INTERSTATE 'OBSIDIAN' MATTE, BOND AS INDICATEDCON-01 EXPOSED C.I.P. ARCHITECTURAL FINISH CONCRETE, BOARD-FORM LINER, WITH CLEARSEALERGL-01 CLEAR, LOW-E INSULATED GLAZING AT STOREFRONTS / GRADE LEVELGL-02 CLEAR, LOW-E INSULATION GLAZING AT HOTEL GUESTROOMSGL-03 CLEAR, LOW-E INSULATED SAFETY GLAZING AT SKYLIGHTSGL-04 CLEAR, LOW-E INSULATED GLAZING WITH BIRD-FRIENDLY FRIT PATTERN AT BRIDGELV-01 LOUVER AT HOTEL EAST; THINLINE, FINISH-ALV-02 LOUVER AT HOTEL WEST; THINLINE, FINISH-BMTL-01 PRE-FORMED METAL CLADDING RAINSCREEN SYSTEM WITH VERT. & HORIZ. PROFILES, ATHOTEL EAST GRADE LEVEL; ACM, FINISH-AMTL-02 PRE-FORMED METAL CLADDING RAINSCREEN SYSTEM AT HOTEL WEST GRADE LEVEL;MORIN 'PULSE' P-1, FINISH-BMTL-03 PRE-FABRICATED HOTEL ENTRANCE CANOPY, FINISH-AMTL-04 PRE-FORMED METAL CLAD RAINSCREEN SYSTEM AT HOTEL EAST LEVELS 5 & 6; ACM,FINISH-AMTL-05 METAL PANEL CLADDING SYSTEM AT HOTEL EAST MECHANICAL PENTHOUSE; MORIN'PULSE' P-1, FINISH-AMTL-06 METAL PANEL MECH. SCREEN SYSTEM AT HOTEL EAST; MORIN 'PULSE' P-1, FINISH-AMTL-07 METAL PANEL CLADDING SYSTEM AT HOTEL WEST MECHANICAL PENTHOUSE; MORIN'PULSE' P-1, FINISH-BMTL-08 METAL PANEL MECH. SCREEN SYSTEM AT HOTEL WEST; MORIN 'PULSE' P-1, FINISH-BMTL-09 METAL COPING AT HOTEL EAST; FINISH-AMTL-10 METAL COPING AT HOTEL WEST; FINISH-BMTL-11 INSULATED METAL MAN DOOR AT HOTEL EAST; FINISH-AMTL-12 INSULATED METAL MAN DOOR AT HOTEL WEST; FINISH-BMTL-13 NOT USEDMTL-14 NOT USEDMTL-15 METAL SPANDREL PANEL AT HOTEL WEST; PURE+FREEFORM 'DECO-BRONZE', FINISH-CMTL-16 METAL INFILL PANEL AT HOTEL EAST LEVEL 5; MORIN 'PULSE' P-1, FINISH-AMTL-17 EXPOSED STRUCTURAL STEEL WITH HIGH PERFORMANCE COATING, FINISH-ARS-01 METAL GUARDRAIL SYSTEM AT GRADE LEVEL; SEE LANDSCAPERS-02 METAL GUARDRAIL SYSTEM, CUSTOM STEEL WITH WOVEN WIRE MESH INFILL PANELS ANDWOOD CAP AT TOP RAIL; FINISH-ARS-03 STAINLESS STEEL HANDRAIL AT EXTERIOR STAIRS AND RAMPSST-01 SOLID STONE SILL AND COPING TO MATCH ST-02ST-02 ADHERED STONE VENEER WALL CLADDING AT HOTEL WEST; SELECT STONE, 'DEEP CREEK'WD-01 INSET WOOD RAINSCREEN PANEL AT HOTEL EAST, VERT. ORIENTATION; 1X6 KEBONYCLEARWD-02 WOOD RAINSCREEN CLADDING SYSTEM AT HOTEL WEST (VERT. OR HORIZ. ORIENTATIONAS INDICATED); 1X6 KEBONY CLEARWD-03 TIMBER INFILL AT BRIDGE STRUCTUREWIN-01 GL-01 IN THERMALLY BROKEN ALUMINUM STOREFRONT WINDOW SYSTEM WITH CUSTOMINTEGRATED PROFILES AT HOTEL EAST GRADE; FINISH-AWIN-02 GL-01 IN THERMALLY BROKEN ALUMINUM STOREFRONT WINDOW SYSTEM AT HOTEL WESTGRADE; FINISH-BWIN-03 GL-02 IN THERMALLY BROKEN COMPOSITE WINDOW SYSTEM AT HOTEL EAST BUILDING;FINISH-AWIN-04 GL-02 IN THERMALLY BROKEN COMPOSITE WINDOW SYSTEM AT HOTEL WEST WITHOPERABLE CASEMENTS WHERE INDICATED; FINISH-BWIN-05 GL-02 IN THERMALLY BROKEN OPERABLE ALUMINUM WINDOW SYSTEM AT HOTEL EASTROOFTOP AMENITY; FINISH-AWIN-06 GL-03 IN THERMALLY BROKEN ALUMINUM SKYLIGHT SYSTEM AT HOTEL EAST ROOFTOPAMENITY; FINISH-AWIN-07 GL-04 IN THERMALLY BROKEN ALUMINUM STOREFRONT SYSTEM AT BRIDGE; FINISH-AWIN-08 NOT USEDWIN-09 NOT USEDSITE PLAN REVIEW RC310/31/2024