Loading...
HomeMy WebLinkAbout049.1 - A.201 - EAST AND WEST ELEVATIONS HOTEL EAST1 LEVEL 02 16' -0" LEVEL 03 26' -10 1/2" LEVEL 04 37' -1 1/4" LEVEL 05 47' -4" LEVEL 06 58' -0" LEVEL 01 0' -0" MECH. PENTHOUSE 80' -0" ROOF 70' -0" 7 6 3 I8J547.1 MTL-09 WD-01 WIN-03 BRK-02 BRK-01 MTL-01 BRK-0370' - 0"10' - 0"12' - 0"10' - 8"10' - 2 3/4"10' - 2 3/4"10' - 10 1/2"16' - 0"WD-01 WIN-03 BRK-01 BRK-02 MTL-01 WIN-03 OPEN TO INTERIOR WIN-01 TYP. BRK-03WOOD UTILITY SCREEN; SEE LANDSCAPEOVERHANG16' - 6 1/2"32' - 9"79' - 6"18' - 10"27' - 5"33' - 10" MTL-05 1 LEVEL 02 16' -0" LEVEL 03 26' -10 1/2" LEVEL 04 37' -1 1/4" LEVEL 05 47' -4" LEVEL 06 58' -0" LEVEL 01 0' -0" MECH. PENTHOUSE 80' -0" ROOF 70' -0" 763I 8J547.1 70' - 0"12' - 0"10' - 8"10' - 2 3/4"10' - 2 3/4"10' - 10 1/2"16' - 0"MTL-05 MTL-09 BRK-03 WIN-05 NORTH/SOUTH PROJECTING SIGN 64SF MTL-05 WEATHER PROTECTION & TRANSPARENCY 18' - 0" WEATHER PROTECTION & TRANSPARENCY 22' - 0" WEATH PROTECTION 12' - 2" WEATHER PROTECTION & TRANSPARENCY 22' - 1" WEATHER PROTECTION & TRANSPARENCY 21' - 4"2' - 9 1/2" BRK-01 WIN-03 WD-01 TYP. BRK-02 MTL-01 MTL-03 BT/ OVERHANG15' - 1 1/2"BRK-03WIN-01 BRK-03 WIN-01TRANSPARENCY7' - 6"2' - 6"SCULPTURAL BRICK INFILL PANELS - SEE SHEET A.204 OVERHANG16' - 11 1/2"33' - 10"17' - 0"10' - 5"18' - 10"79' - 6"32' - 9" N E C PROJECT DRAWING PROJ. NO. SHEET GENERAL NOTES ISSUANCES DATE B A 1 E D C B A PROJECT TEAM © 2024 COPYRIGHT G|R|E|C ARCHITECTS BUILDING DEPT STAMP D SEAL 1. THIS DOCUMENT WITH THE ACCOMPANYING DRAWINGS, SPECIFICATIONS AND/OR PROJECT MANUAL, DESCRIBES THE GENERAL SCOPE OF THE PROJECT AND DESIGN CONCEPT AND DESIGN CONCEPT IN TERMS OF THE INTERIOR DESIGN, ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING SYSTEMS. THESE DOCUMENTS DO NOT NECESSARILY INDICATE OR DESCRIBE ALL OF THE WORK REQUIRED FOR THE FULL PERFORMANCE AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE SCOPE INDICATED, DESCRIBED OR INFERRED, THE CONTRACTOR SHALL DETERMINE AND INCLUDE IN THE PROPOSALS ALL ITEMS NECESSARY TO PROVIDE PROPER EXECUTION AND COMPLETION OF THE WORK. 2. DO NOT SCALE DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONFIRM ANY EXISTING SITE CONDITIONS, AND SHALL NOTIFY THE ARCHITECT OF ANY DIMENSIONAL DISCREPANCIES PRIOR TO BEGINNING WORK. OWNER 2345678 12345678 11/1/2024 4:37:53 PM Autodesk Docs://2215 - Bozeman MT/ARCH - 2215 BOZEMAN.rvt HOTEL BOZEMAN 205 N TRACY AVE. BOZEMAN, MT A.201 EAST AND WEST ELEVATIONS HOTEL EAST 2215 ARCHITECT G|R|E|C ARCHITECTS, LLC OWNER NAME NO. ISSUED FOR DATE TRANSPARENCY - EAST ELEVATION TABLE 38.510.030.D - MIXED-BLOCK FRONTAGE BLOCK FRONTAGE STANDARDS FRONTAGE DESIGNATION ELEVATION AREA (SQ FT) TRANSPARENCY REQUIRED (SQ FT) TRANSPARENCY PROVIDED (SQ FT) MIXED 1328.39 SF 531.36 SF 625.49 SF AREA OF TRANSPARENCY 40% 47% SIGNAGE TABLE 38.560.060 BLOCK FRONTAGE STANDARDS MAX ALLOWABLE SQ FT ALLOWABLE SQ FT SIGN AREA PER LINEAR FOOT OF BUILDING FRONTAGE FOR FIRST 25 FT ALLOWABLE SQ FT SIGN AREA PER LINEAR FOOT OF BUILDING FRONTAGE > 25 FT ALLOWABLE SIGNAGE BASED ON BUILDING FRONTAGE 187 25 162 LINEAR FOOT OF BUILDING FRONTAGE 250 PER LOT 2 1.5 293 12 EXTERIOR MATERIALS & COMPONENTS DESIGNATION DESCRIPTION BRK-01 MODULAR FACE BRICK; INTERSTATE 'MOUNTAIN RED' SMOOTH, RUNNING BOND U.N.O. BRK-02 MODULAR FACE BRICK; INTERSTATE 'IRONSTONE' RUFF, BOND AS INDICATED BRK-03 MODULAR FACE BRICK; INTERSTATE 'OBSIDIAN' MATTE, BOND AS INDICATED CON-01 EXPOSED C.I.P. ARCHITECTURAL FINISH CONCRETE, BOARD-FORM LINER, WITH CLEAR SEALER GL-01 CLEAR, LOW-E INSULATED GLAZING AT STOREFRONTS / GRADE LEVEL GL-02 CLEAR, LOW-E INSULATION GLAZING AT HOTEL GUESTROOMS GL-03 CLEAR, LOW-E INSULATED SAFETY GLAZING AT SKYLIGHTS GL-04 CLEAR, LOW-E INSULATED GLAZING WITH BIRD-FRIENDLY FRIT PATTERN AT BRIDGE LV-01 LOUVER AT HOTEL EAST; THINLINE, FINISH-A LV-02 LOUVER AT HOTEL WEST; THINLINE, FINISH-B MTL-01 PRE-FORMED METAL CLADDING RAINSCREEN SYSTEM WITH VERT. & HORIZ. PROFILES, AT HOTEL EAST GRADE LEVEL; ACM, FINISH-A MTL-02 PRE-FORMED METAL CLADDING RAINSCREEN SYSTEM AT HOTEL WEST GRADE LEVEL; MORIN 'PULSE' P-1, FINISH-B MTL-03 PRE-FABRICATED HOTEL ENTRANCE CANOPY, FINISH-A MTL-04 PRE-FORMED METAL CLAD RAINSCREEN SYSTEM AT HOTEL EAST LEVELS 5 & 6; ACM, FINISH-A MTL-05 METAL PANEL CLADDING SYSTEM AT HOTEL EAST MECHANICAL PENTHOUSE; MORIN 'PULSE' P-1, FINISH-A MTL-06 METAL PANEL MECH. SCREEN SYSTEM AT HOTEL EAST; MORIN 'PULSE' P-1, FINISH-A MTL-07 METAL PANEL CLADDING SYSTEM AT HOTEL WEST MECHANICAL PENTHOUSE; MORIN 'PULSE' P-1, FINISH-B MTL-08 METAL PANEL MECH. SCREEN SYSTEM AT HOTEL WEST; MORIN 'PULSE' P-1, FINISH-B MTL-09 METAL COPING AT HOTEL EAST; FINISH-A MTL-10 METAL COPING AT HOTEL WEST; FINISH-B MTL-11 INSULATED METAL MAN DOOR AT HOTEL EAST; FINISH-A MTL-12 INSULATED METAL MAN DOOR AT HOTEL WEST; FINISH-B MTL-13 NOT USED MTL-14 NOT USED MTL-15 METAL SPANDREL PANEL AT HOTEL WEST; PURE+FREEFORM 'DECO-BRONZE', FINISH-C MTL-16 METAL INFILL PANEL AT HOTEL EAST LEVEL 5; MORIN 'PULSE' P-1, FINISH-A MTL-17 EXPOSED STRUCTURAL STEEL WITH HIGH PERFORMANCE COATING, FINISH-A RS-01 METAL GUARDRAIL SYSTEM AT GRADE LEVEL; SEE LANDSCAPE RS-02 METAL GUARDRAIL SYSTEM, CUSTOM STEEL WITH WOVEN WIRE MESH INFILL PANELS AND WOOD CAP AT TOP RAIL; FINISH-A RS-03 STAINLESS STEEL HANDRAIL AT EXTERIOR STAIRS AND RAMPS ST-01 SOLID STONE SILL AND COPING TO MATCH ST-02 ST-02 ADHERED STONE VENEER WALL CLADDING AT HOTEL WEST; SELECT STONE, 'DEEP CREEK' WD-01 INSET WOOD RAINSCREEN PANEL AT HOTEL EAST, VERT. ORIENTATION; 1X6 KEBONY CLEAR WD-02 WOOD RAINSCREEN CLADDING SYSTEM AT HOTEL WEST (VERT. OR HORIZ. ORIENTATION AS INDICATED); 1X6 KEBONY CLEAR WD-03 TIMBER INFILL AT BRIDGE STRUCTURE WIN-01 GL-01 IN THERMALLY BROKEN ALUMINUM STOREFRONT WINDOW SYSTEM WITH CUSTOM INTEGRATED PROFILES AT HOTEL EAST GRADE; FINISH-A WIN-02 GL-01 IN THERMALLY BROKEN ALUMINUM STOREFRONT WINDOW SYSTEM AT HOTEL WEST GRADE; FINISH-B WIN-03 GL-02 IN THERMALLY BROKEN COMPOSITE WINDOW SYSTEM AT HOTEL EAST BUILDING; FINISH-A WIN-04 GL-02 IN THERMALLY BROKEN COMPOSITE WINDOW SYSTEM AT HOTEL WEST WITH OPERABLE CASEMENTS WHERE INDICATED; FINISH-B WIN-05 GL-02 IN THERMALLY BROKEN OPERABLE ALUMINUM WINDOW SYSTEM AT HOTEL EAST ROOFTOP AMENITY; FINISH-A WIN-06 GL-03 IN THERMALLY BROKEN ALUMINUM SKYLIGHT SYSTEM AT HOTEL EAST ROOFTOP AMENITY; FINISH-A WIN-07 GL-04 IN THERMALLY BROKEN ALUMINUM STOREFRONT SYSTEM AT BRIDGE; FINISH-A WIN-08 NOT USED WIN-09 NOT USED 530.84 SF 627.1 SF SITE PLAN REVIEW 06/16/2023 SITE PLAN REVIEW RC1 01/31/2024 SITE PLAN REVIEW RC2 04/26/2024 SITE PLAN REVIEW RC3 10/31/2024 SCALE 3/32" = 1'-0"E8 EAST ELEVATION - HOTEL EAST SCALE 3/32" = 1'-0"C8 WEST ELEVATION - HOTEL EAST