Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
049 - A.201 - HOTEL BUILDING EAST AND WEST ELEVATIONS
LEVEL 0216' -0"LEVEL 0325' -9 1/4"LEVEL 0435' -6 1/2"LEVEL 0545' -4"LEVEL 0656' -0"LEVEL 010' -0"7631MECH ROOF80' -6"812' - 0"10' - 8"9' - 9 1/2"9' - 9 1/4"9' - 9 1/4"16' - 0"NORTH/SOUTH PROJECTING SIGN 64SFWALL SIGN35 SFWIN-01TYP2HOTEL ROOF68' -0"5450' - 10"10' - 4"18' - 11"67' - 6"44' - 8"2' - 6"TRANSPARENCY7' - 6"12' - 6"68' - 0"177' - 2"TRANSPARENCY19' - 0"22' - 10"22' - 10"22' - 2"2' - 10"MTL-10BRK-03CON-01WIN-01TYPMTL-01BRK-01WIN-03WD-01TYP.BRK-02MTL-01MTL-09WIN-06MTL-04WIN-05MTL-05MTL-06MTL-05MECH. PENTHOUSE = 5%MECH. PENTHOUSE = 40%OVERHANG15' - 7"OVERHANG17' - 5"TYP.MTL-09BRK-02WIN-03WD-01TYP.MTL-01TYP.BRK-02MTL-01LEVEL 0216' -0"LEVEL 0325' -9 1/4"LEVEL 0435' -6 1/2"LEVEL 0545' -4"LEVEL 0656' -0"LEVEL 010' -0"7631MECH ROOF80' -6"8OPEN TO INTERIOR12' - 0"10' - 8"9' - 9 1/2"9' - 9 1/4"9' - 9 1/4"16' - 0"2HOTEL ROOF68' -0"5412' - 6"68' - 0"OVERHANG17' - 2"WIN-01BRK-01WIN-03WD-01TYP.BRK-02MTL-01MTL-09MTL-05MTL-04WIN-05MTL-06MTL-05MTL-01WIN-01BRK-03CON-01WIN-01MTL-11TYP.TYP.BRK-03OVERHANG14' - 11"MTL-01WIN-01BRK-02BRK-01WIN-03WD-01TYP.WOOD UTILITY SCREEN; SEE LANDSCAPETRANSPARENCY - EAST ELEVATIONTABLE 38.510.030.D - MIXED-BLOCK FRONTAGE - SECONDARY FACADEBLOCK FRONTAGE STANDARDSFRONTAGE DESIGNATIONELEVATION AREA (SQ FT)TRANSPARENCY REQUIRED (SQ FT)TRANSPARENCY PROVIDED (SQ FT)MIXED1328.39 SF531.36 SF625.49 SFAREA OF TRANSPARENCY40%47%SIGNAGETABLE 38.560.060BLOCK FRONTAGE STANDARDSMAX ALLOWABLE SQ FTALLOWABLE SQ FT SIGN AREA PER LINEAR FOOT OF BUILDING FRONTAGE FOR FIRST 25 FTALLOWABLE SQ FT SIGN AREA PER LINEAR FOOT OF BUILDING FRONTAGE > 25 FTALLOWABLE SIGNAGE BASED ON BUILDING FRONTAGE18725162LINEAR FOOT OF BUILDING FRONTAGE250 PER LOT21.5293ECPROJECTDRAWINGPROJ. NO.SHEETGENERAL NOTESISSUANCESDATEBA1EDCBAPROJECT TEAM© 2023 COPYRIGHT G|R|E|C ARCHITECTSBUILDING DEPT STAMPDSEAL1. THIS DOCUMENT WITH THE ACCOMPANYING DRAWINGS, SPECIFICATIONS AND/OR PROJECT MANUAL, DESCRIBES THE GENERAL SCOPE OF THE PROJECT AND DESIGN CONCEPT AND DESIGN CONCEPT IN TERMS OF THE INTERIOR DESIGN, ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING SYSTEMS. THESE DOCUMENTS DO NOT NECESSARILY INDICATE OR DESCRIBE ALL OF THE WORK REQUIRED FOR THE FULL PERFORMANCE AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE SCOPE INDICATED, DESCRIBED OR INFERRED, THE CONTRACTOR SHALL DETERMINE AND INCLUDE IN THE PROPOSALS ALL ITEMS NECESSARY TO PROVIDE PROPER EXECUTION AND COMPLETION OF THE WORK.2. DO NOT SCALE DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONFIRM ANY EXISTING SITE CONDITIONS, AND SHALL NOTIFY THE ARCHITECT OF ANY DIMENSIONAL DISCREPANCIES PRIOR TO BEGINNING WORK.GRECArchitects| | |OWNER2345678123456782/1/2024 6:21:30 PM Autodesk Docs://2215 - Bozeman MT/ARCH- 2215 BOZEMAN.rvtHOTEL BOZEMAN205 N TRACY AVE.BOZEMAN, MTA.201HOTEL BUILDINGEAST AND WESTELEVATIONS2215ARCHITECTG|R|E|C ARCHITECTS, LLCINTERIOR DESIGNG|R|E|C ARCHITECTS, LLCSTRUCTURAL ENGINEERD'AMATO CONVERSANO INC.MEPFP ENGINEERIMEG CORP.CIVIL ENGINEERSTAHLY ENGINEERING & ASSOCIATESLANDSCAPE ARCHITECTDESIGN.5 LANDSCAPE ARCHITECTUREHOTEL BOZEMAN INVESTORS, LLCSCALE3/32" = 1'-0"E8HOTEL EAST ELEVATIONSCALE3/32" = 1'-0"C8HOTEL WEST ELEVATIONEXTERIOR MATERIALS & COMPONENTSDESIGNATION DESCRIPTIONBRK-01 MODULAR FACE BRICK; INTERSTATE 'MOUNTAIN RED' SMOOTH, RUNNING BOND U.N.O.BRK-01B NOT USEDBRK-02 MODULAR FACE BRICK; INTERSTATE 'IRONSTONE' RUFF, BOND AS INDICATEDBRK-02A NOT USEDBRK-03 MODULAR FACE BRICK; INTERSTATE 'OBSIDIAN' MATTE, BOND AS INDICATEDCON-01 EXPOSED C.I.P. CONCRETE WITH CLEAR SEALERGL-01 CLEAR, LOW-E INSULATED GLAZING AT STOREFRONTS / GRADE LEVELGL-02 CLEAR, LOW-E INSULATION GLAZING AT RESIDENTIAL UNITS AND HOTEL GUESTROOMSGL-03 CLEAR, LOW-E INSULATED SAFETY GLAZING AT SKYLIGHTSGL-04 CLEAR, LOW-E INSULATED GLAZING WITH BIRD-FRIENDLY FRIT PATTERN AT BRIDGELV-01 LOUVER AT HOTEL; THINLINE, FINISH-ALV-02 LOUVER AT RESIDENTIAL BUILDING; THINLINE, FINISH-BMTL-01 PRE-FORMED METAL CLADDING RAINSCREEN SYSTEM WITH VERT. & HORIZ. PROFILES, ATHOTEL GRADE LEVEL; ACM, FINISH-AMTL-02 PRE-FORMED METAL CLADDING RAINSCREEN SYSTEM AT RES. GRADE LEVEL; MORIN'PULSE' P-1, FINISH-BMTL-03 PRE-FABRICATED HOTEL ENTRANCE CANOPY, FINISH-AMTL-04 PRE-FORMED METAL CLAD RAINSCREEN SYSTEM AT HOTEL LEVELS 5 & 6; ACM, FINISH-AMTL-05 METAL PANEL CLADDING SYSTEM AT HOTEL MECHANICAL PENTHOUSE; MORIN 'PULSE' P-1,FINISH-AMTL-06 METAL PANEL MECH. SCREEN SYSTEM AT HOTEL; MORIN 'PULSE' P-1, FINISH-AMTL-07 METAL PANEL CLADDING SYSTEM AT RES. BUILDING MECHANICAL PENTHOUSE; MORIN'PULSE' P-1, FINISH-BMTL-08 METAL PANEL MECH. SCREEN SYSTEM AT RES. BUILDING; MORIN 'PULSE' P-1, FINISH-BMTL-09 METAL COPING AT HOTEL BUILDING; FINISH-AMTL-10 METAL COPING AT RES. BUILDING; FINISH-BMTL-11 INSULATED METAL MAN DOOR AT HOTEL BUILDING; FINISH-AMTL-12 INSULATED METAL MAN DOOR AT RES BUILDING; FINISH-BMTL-13 NOT USEDMTL-14 NOT USEDMTL-15 METAL SPANDREL PANEL AT RES. BUILDING; PURE+FREEFORM 'DECO-BRONZE', FINISH-CMTL-16 METAL INFILL PANEL AT HOTEL LEVEL 5; MORIN 'PULSE' P-1, FINISH-AMTL-17 EXPOSED STRUCTURAL STEEL WITH HIGH PERFORMANCE COATING, FINISH-ARS-01 METAL GUARDRAIL SYSTEM AT HOTEL GRADE LEVEL; SEE LANDSCAPERS-02 METAL GUARDRAIL SYSTEM AT HOTEL, CUSTOM STEEL WITH WOVEN WIRE MESH INFILLPANELS AND WOOD CAP AT TOP RAIL; FINISH-ARS-03 STAINLESS STEEL HANDRAIL AT EXTERIOR STAIRS AND RAMPSST-01 SOLID STONE SILL AND COPING TO MATCH ST-02ST-02 ADHERED STONE VENEER WALL CLADDING AT RES. BUILDING; SELECT STONE, 'DEEPCREEK'WD-01 INSET WOOD RAINSCREEN PANEL AT HOTEL, VERT. ORIENTATION; 1X6 KEBONY CLEARWD-02 WOOD RAINSCREEN CLADDING SYSTEM AT RES. BUILDING (VERT. OR HORIZ. ORIENTATIONAS INDICATED); 1X6 KEBONY CLEARWD-03 TIMBER INFILL AT BRIDGE STRUCTUREWIN-01 GL-01 IN THERMALLY BROKEN ALUMINUM STOREFRONT WINDOW SYSTEM AT HOTELGRADE; FINISH-AWIN-02 GL-01 IN THERMALLY BROKEN ALUMINUM STOREFRONT WINDOW SYSTEM AT RES. GRADE;FINISH-BWIN-03 GL-02 IN THERMALLY BROKEN COMPOSITE WINDOW SYSTEM AT HOTEL BUILDING; FINISH-AWIN-04 GL-02 IN THERMALLY BROKEN COMPOSITE WINDOW SYSTEM AT RES. BUILDING WITHOPERABLE CASEMENTS WHERE INDICATED; FINISH-BWIN-05 GL-02 IN THERMALLY BROKEN OPERABLE ALUMINUM WINDOW SYSTEM AT HOTEL ROOFTOPAMENITY; FINISH-AWIN-06 GL-03 IN THERMALLY BROKEN ALUMINUM SKYLIGHT SYSTEM AT HOTEL ROOFTOP AMENITY;FINISH-AWIN-07 GL-04 IN THERMALLY BROKEN ALUMINUM STOREFRONT SYSTEM AT BRIDGE; FINISH-AWIN-08 NOT USEDWIN-09 NOT USEDNO. ISSUED FOR DATESITE PLAN REVIEW 06/16/2023SITE PLAN REVIEW RC1 01/30/202401