HomeMy WebLinkAbout034.2 - L602 - LEVEL 2 IRRIGATION PLANUPDNUP6A403C10A412C10A603D2A604G3A311B52'-11 3/4"G6GG.8HFDG10G10A202A601E3A6002E1THE HOTELBOZEMANHOTEL WESTTHE HOTELBOZEMANHOTEL EASTNNNNNNNNIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRDD DIRR IRR IRR IRR IRR NNN NNNNNNNNN NNN NNNNNNNNNN NNNNNNNNNNNNNNNNNNNN NNNNN NNNNN NNNNN NNNNN NNNNNNNNNNNNN NNNNNNNMEP TO PROVIDE 1.0"STUB W/ BACKFLOWAND SELF DRAININGCONNECTION POINTWALL MOUNTEDCONTROLLERVERIFY LOCATION IN FIELD, ELECTRICAL AND ARCH. TOPROVIDE & COORDINATEPOWER OUTLET QUICK COUPLERFOR BLOW OUT USESOLAR SYNC STATIONVERIFY LOCATIONIN FIELD, SOUTH FACINGNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNIRRIRRIRRIRRIGATION SLEEVE, TYPBFCPCSSBFCPCBFCPIRRDIRRIRRIRRSSSSSOLAR SYNC STATIONVERIFY LOCATIONIN FIELD, SOUTH FACING QUICK COUPLERFOR BLOW OUT USEWALL MOUNTEDCONTROLLERVERIFY LOCATION IN FIELD, ELECTRICAL AND ARCH. TOPROVIDE & COORDINATEPOWER OUTLETCMEP TO PROVIDE 1.0"STUB W/ BACKFLOWAND SELF DRAININGCONNECTION POINTSOLAR SYNC STATIONVERIFY LOCATIONIN FIELD, SOUTH FACINGWALL MOUNTED CONTROLLERVERIFY LOCATION IN FIELD, ELECTRICAL AND ARCH. TO PROVIDE& COORDINATE POWER OUTLET QUICK COUPLERFOR BLOW OUT USEMEP TO PROVIDE 1.0"STUB W/ BACKFLOWAND SELF DRAININGCONNECTION POINTZONE 2D1.0"4.40ZONE 1D1.0"0.1ZONE 3D1.0"1.5ZONE 4D1.0"0.1SYMBOLSIZEDETAILDESCRIPTIONIRRIGATION LEGEND LEVEL 2BACKFLOW PREVENTERWATTS 009 RPZ OR EQUIVALENT1.0"2, L700IRRIGATION CONTROLLERHUNTER ICC2 OR EQUIVALENT1, L700CONNECTION POINTDRIP CONTROL VALVEHUNTER PCZ, ICZ DRIP CONTROL ORSIMILAR8-12 ,L700LATERAL LINE, SCH 40 PVC OR PE***4, L700HUNTER, HDL-09-12, DRIP LINE OR EQ.1-2, L7013-4, L700VALVE SCHEDULEIRRIRRNNQTY1115PER PLANPER PLANSEE PLAN7, L7003, L70021QUICK COUPLER FOR BLOW OUT USERAINBIRD HQ44-RC OR SIMILARISOLATION VALVE/GATE VALVE DRAINNIBCO T-113 BRONZE GATE VALVE ORSIMILARZONE #/TYPESIZEGPM1.0"NOTES:1.ALL BUILDING LANDSCAPE IRRIGATION TO BE COORDINATED WITHLANDSCAPE CONTRACTOR, G.C., MEP, ARCH., AND PLUMBER.---CONNECTION POINT TO BE DETERMINED BY OTHERS,GRAPHICALLY SHOWN FOR INTENT ONLY---PROVIDE BACKFLOW PREVENTION IN WET MECH ROOM ABOVEFLOOR DRAIN AND STUB OUT OF THE BUILDING DURINGCONSTRUCTION2.FINAL IRRIGATION AND PLUMBING EQUIPMENT SUBJECT TO CHANGE.3.IRRIGATION SLEEVING TO BE PROVIDED BY CIVIL CONTRACTOR/GC; SETSLEEVES UNDER ROADS PER PLAN COORDINATE WITHLANDSCAPE/IRRIGATION INSTALLER PRIOR TO POURING ROADS ORCONCRETE AND SETTING BOULDER RETAINING WALLS4.SEE IRRIGATION PLANS FOR MORE INFORMATION SHEETS L600S & L700SZONE TYPESD/N= POINT SOURCE/ INLINE DRIP IRRIGATION1.0"1.0"1.0"SOLAR SYNC SENSORHUNTER WSS-SEN OR SIMILARPER MFG11.0"DRIP LINE, SOFT WALL DRIP TUBINGSHRUB EMMITER: HUNTER HE-10-BPERENNIAL EMMITER: HUNTER HE-05-B(OR EQUIVALENT)DD.75"IRRIGATION SLEEVE, SCH 40 PVC1"PER PLANPER PLANBFCPCSS5, L700105020N1L6021"=10'-0"Level 2 Irrigation PlanLevel 2 IrrigationPlanL 602design5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\north central hotel bozeman & residences\autocad\01_sheets\24x36 d5 titleblock\l602_hotel-bozeman_irrigation-l2.dwg
North Central
The Hotel Bozeman
Bozeman, Montana
KHM/HU TMS
02/10/23100% SD06/19/23SP106/30/23Pricing Set01/31/24SP1 RC102/09/24Pricing04/26/24SP1 RC210/31/24SP1 RC32ND LEVEL IRRIGATION NOTES:1.IRRIGATION SCHEDULE NOT PROVIDED FOR LEVEL 2 ROOF DECK.ROOF DECK NOT APPLICABLE TO CITY OF BOZEMAN WATERCONSERVATION STANDARDS, IT WILL BE THE RESPONSIBILITY OFTHE LANDSCAPE CONTRACTOR TO ENSURE BEST MEANS ANDMETHODS FOR WATERING PLANTING MATERIALS ON ROOF WHILECONSERVING WATER. FUTURE DETAILING TO BE COORDINATEDWITH NATIVE TRAY INSTALLER, MEP, ARCHITECT, AND LANDSCAPEARCHITECT DURING DEVELOPMENT OF CONSTRUCTIONDOCUMENTATION.2.LEVEL 2 PLANT MATERIALS ARE NOT INCLUDED IN THE WATERBUDGET CALCULATOR.