Loading...
HomeMy WebLinkAbout034 - L601 - Level 2 Irrigation PlanUPUPUPDNUPDNDNWEST LAMME STREETWEST BEALL STREETNORTH TRACY AVENUETHE HOTELBOZEMANHOTEL WESTTHE HOTELBOZEMANHOTEL EASTBFCPBFCPBFCPBFCPBFCPALL PLANTERS TO BE IRRIGATEDWITH A COMMON DRIP LATERAL RUNNINGUNDER PEDESTAL PAVER SYSTEM. PLANTERSTO DRAIN UNDERNEATH PAVERSAND FLOW OVER THE ROOF TO AREA DRAINS.GREEN ROOF TO BE IRRIGATEDWITH SPRAY IRRIGATION SYSTEM.GREEN ROOF TO DRAIN TO AREA DRAINS.PROVIDE SELF-DRAININGIRRIGATION CONNECTION AT EACHROOF DECK LOCATION& BACKFLOW PREVENTERPROVIDE SELF-DRAININGIRRIGATION CONNECTION AT EACHROOF DECK LOCATION& BACKFLOW PREVENTERDD D D D D D DDD DDDDDD DDDDDDD DDDDD DDDDDDDDDIRRIGATION NOTES AND SPECIFICATIONS1.ALL VALVE BOXES TO BE STANDARD SIZE OR LARGER.2.IRRIGATION MAIN LINE TO BE 1.5" SCH 40 PVC PIPE OR 150 PSI POLY PIPE.3.ALL TREES TO BE IRRIGATED THROUGH DEDICATED BUBBLERS. BUBBLERS TO BE EVENLY DISTRIBUTED AROUND BASE OF TREE WITHFOUR (4) EVENLY SPACED BUBBLER EMITTERS.4.TREES AND SHRUBS PLACED WITHIN PLANTING BEDS MAY UTILIZE DRIP IRRIGATION. DRIP IRRIGATION TO BE ADJUSTED PERREQUIREMENTS OF EACH INDIVIDUAL PLANT.5.ALL SHRUBS OUTSIDE OF DEDICATED PLANTING BEDS TO HAVE DEDICATED BUBBLERS. BUBBLERS TO BE EVENLY DISTRIBUTED AROUNDBASE OF SHRUB WITH TWO (2) EVENLY SPACED BUBBLER EMITTERS.6.BUBBLERS TO TREES MAY BE OMITTED WHERE OVERHEAD IRRIGATION WILL PROVIDE ADEQUATE WATER.7.ALL MIXED SHRUB AND PERENNIAL PLANTINGS TO BE IRRIGATED WITH DEDICATED DRIP TUBING. DRIP EMITTERS TO BE ADJUSTED PERREQUIREMENTS OF EACH INDIVIDUAL PLANT.RECOMMENDED EMITTERS PER PLANT TYPE:PERENNIALS- (1) 0.5 GPH EMITTERSHRUBS- (2) 1.0 GPH EMITTERS/0.25-1.0 GPM BUBBLERSTREES- (4) 1.0 GPH EMITTERS/0.25-1.0 GPM BUBBLERS***TREES UTILIZING DRIP IN PLANTING BEDS MAY NEED ADDITIONAL EMITTERS TO MEET WEEKLY WATERING REQUIREMENTS.8.LAWN AND SEED AREAS TO BE IRRIGATED WITH SPRAY OR ROTOR OVERHEAD IRRIGATION AS INDICATED ON PLAN.8.1.MULTI-STREAM, MULTI-TRAJECTORY NOZZLES WILL BE USED WHERE POSSIBLE TO CONSERVE WATER.9.ALL HEADS MUST ACHIEVE HEAD-TO-HEAD COVERAGE FOR SOD AREAS.10.SYSTEM SHALL UTILIZE WEATHER / MOISTURE MONITOR.11.BACKFLOW ASSEMBLY AND BLOWOUT ASSEMBLY SHALL BE LOCATED IN MECHANICAL ROOM OR APPROVED EXTERNAL GRADEBOX. IT ISTHE RESPONSIBILITY OF THE LANDSCAPE CONTRACTOR TO COORDINATE INSTALLATION PER LOCAL CODES AND ORDINANCES AS WELLAS WITH ARCHITECTURE AND ALL OTHER TRADES.12.POWER SOURCE FOR IRRIGATION CONTROLLER TO BE COORDINATED WITH ELECTRICAL ENGINEER, ELECTRICAL CONTRACTOR ANDLANDSCAPE CONTRACTOR.13.DO NOT INSTALL IRRIGATION SYSTEM WHEN OBVIOUS OBSTRUCTIONS OR GRADE CHANGES ARE PRESENT.14.ALL INFORMATION TO BE FIELD-VERIFIED BY CONTRACTOR PRIOR TO INSTALLATION.15.THE CONTRACTOR SHALL MAINTAIN AN ACCURATE & CURRENT 'AS-BUILT' IRRIGATION PLAN ON SITE AT ALL TIMES.16.SYSTEM DESIGNED TO FALL WITHIN OPERATING PRESSURE OF 50 PSI AND 12 GPM. IF NOT WITHIN LIMITS, CONTRACTOR MUST CONTACTLANDSCAPE ARCHITECT. SYM DESCRIPTIONIRRIGATION LEGEND - LEVEL 2DRIP LINE, SOFT WALL DRIP TUBINGDRIP CONTROL VALVEBFCPCONNECTION POINT AND BACK FLOW TO BEIN LEVEL 1 MECH. ROOM. LANDSCAPECONTRACTOR TO VERIFY NECESSARYEQUIPMENT PRIOR TO INSTALLATION.** NOTE: IRRIGATION LAYOUT TO BEDESIGN/BUILD BY LANDSCAPE CONTRACTOR.DIRRIGATIONTYPEIRRIGATION SCHEDULE - LEVEL 2TOTALAREA / QTYANNUALET RATETOTALANNUAL H2O77PERENNIALS2 GAL /WEEK2,772 GALTOTAL ANNUAL H2O REQUIRED: 37,714 GALTOTAL ACRE FEET PER YEAR: 0.12 ACRE FEETH.E.PERENN.DRIP IRRIG.1,934 SF29 IN / SF34,942 GALH.E. GREEN ROOF SPRAY IRRIGATION Level 2Irrigation PlanL 601design5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\north central hotel bozeman & residences\autocad\01_sheets\24x36 d5 titleblock\l600_hotel-bozeman_irrigation.dwg North Central The Hotel Bozeman Bozeman, Montana KHM/HU TMS 202/10/23100% SD06/19/23SP106/30/23Pricing Set01/31/24SP1 RC102/09/24Pricing04/26/24SP1 RC21168032N1L6011/16" = 1'-0"Level 2 Irrigation Plan