Loading...
HomeMy WebLinkAbout033.1 - L600 - IRRIGATION PLANSYMBOLSIZEDETAILDESCRIPTIONIRRIGATION LEGEND LEVEL 1BACKFLOW PREVENTERWATTS 009 RPZ OR EQUIVALENT1.0"2, L700IRRIGATION CONTROLLERHUNTER ICC2 OR EQUIVALENT1, L700CONNECTION POINTDRIP CONTROL VALVEHUNTER PCZ, ICZ DRIP CONTROL ORSIMILAR8-10,L700PVC MAINLINE, SCH 40 PVC4, L700LATERAL LINE, SCH 40 PVC OR PE***4, L700DRIP LINE, SOFT WALL DRIP TUBINGSHRUB EMMITER: HUNTER HE-10-BPERENNIAL EMMITER: HUNTER HE-05-B(OR EQUIVALENT)3-4, L701IRRIGATION SLEEVE, SCH 40 PVC5, L700VALVE SCHEDULEIRR MAINIRRIRRDDQTY1115SEE PLANSEE PLANSEE PLANSEE PLANSEE PLAN7, L7003, L70021QUICK COUPLER FOR BLOW OUT USERAINBIRD HQ44-RC OR SIMILARISOLATION VALVE/GATE VALVE DRAINNIBCO T-113 BRONZE GATE VALVE ORSIMILARTREE DRIP, SOFT WALL DRIP TUBINGTREE EMMITER: HUNTER HE-10-B(OR EQUIVALENT)3-4, L701SEE PLANZONE #/TYPESIZEGPMBFCPC1.0"NOTES:1.ALL BUILDING LANDSCAPE IRRIGATION TO BE COORDINATED WITHLANDSCAPE CONTRACTOR, G.C., MEP, ARCH., AND PLUMBER.---CONNECTION POINT TO BE DETERMINED BY OTHERS,GRAPHICALLY SHOWN FOR INTENT ONLY---PROVIDE BACKFLOW PREVENTION IN WET MECH ROOM ABOVEFLOOR DRAIN AND STUB OUT OF THE BUILDING DURINGCONSTRUCTION2.FINAL IRRIGATION AND PLUMBING EQUIPMENT SUBJECT TO CHANGE.3.IRRIGATION SLEEVING TO BE PROVIDED BY CIVIL CONTRACTOR/GC; SETSLEEVES UNDER ROADS PER PLAN COORDINATE WITHLANDSCAPE/IRRIGATION INSTALLER PRIOR TO POURING ROADS ORCONCRETE AND SETTING BOULDER RETAINING WALLS4.SEE IRRIGATION PLANS FOR MORE INFORMATION SHEETS L600S & L700SZONE TYPESD= DRIP IRRIGATIONDT = DRIP TREE IRRIGATION1.0"1.0"1.0"1.0"1.0"0.75"0.75"SOLAR SYNC SENSORHUNTER WSS-SEN OR SIMILARPER MFG1SS4"DDD LOW WATER USEHYDROZONE(0.3 OR LESS)DDHIGH WATER USEHYDROZONE(0.6 +)GENERAL IRRIGATION NOTES AND SPECIFICATIONS1.ALL VALVE BOXES TO BE STANDARD SIZE OR LARGER.2.IRRIGATION MAIN LINE TO BE 1" SCH 40 PVC.3.ALL TREES TO BE IRRIGATED THROUGH DEDICATED BUBBLERS.BUBBLERS TO BE EVENLY DISTRIBUTED AROUND BASE OF TREE WITHFOUR (4) EVENLY SPACED BUBBLER EMITTERS.4.TREES AND SHRUBS PLACED WITHIN PLANTING BEDS MAY UTILIZE DRIPIRRIGATION. DRIP IRRIGATION TO BE ADJUSTED PER REQUIREMENTS OFEACH INDIVIDUAL PLANT.5.ALL SHRUBS OUTSIDE OF DEDICATED PLANTING BEDS TO HAVEDEDICATED BUBBLERS. BUBBLERS TO BE EVENLY DISTRIBUTEDAROUND BASE OF SHRUB WITH TWO (2) EVENLY SPACED BUBBLEREMITTERS.6.ALL MIXED SHRUB AND PERENNIAL PLANTINGS TO BE IRRIGATED WITHDEDICATED DRIP TUBING. DRIP EMITTERS TO BE ADJUSTED PERREQUIREMENTS OF EACH INDIVIDUAL PLANT.RECOMMENDED EMITTERS PER PLANT TYPE:PERENNIALS- (1) 0.5 GPH EMITTERSHRUBS- (2) 1.0 GPH EMITTERS/0.25-1.0 GPM BUBBLERSTREES- (4) 1.0 GPH EMITTERS/0.25-1.0 GPM BUBBLERS***TREES UTILIZING DRIP IN PLANTING BEDS MAY NEED ADDITIONAL EMITTERS TO MEET WEEKLY WATERING REQUIREMENTS.7.LAWN AND SEED AREAS TO BE IRRIGATED WITH SPRAY OR ROTOROVERHEAD IRRIGATION AS INDICATED ON PLAN.8.ALL HEADS MUST ACHIEVE HEAD-TO-HEAD COVERAGE.9.SYSTEM SHALL UTILIZE WATER SENSE WEATHER / MOISTURE MONITOR.10.BACKFLOW ASSEMBLY AND BLOWOUT ASSEMBLY SHALL BE LOCATED INMECHANICAL ROOM OR APPROVED EXTERNAL GRADEBOX. IT IS THERESPONSIBILITY OF THE LANDSCAPE CONTRACTOR TO COORDINATEINSTALLATION PER LOCAL CODES AND ORDINANCES AS WELL AS WITH ARCHITECTURE AND ALL OTHER TRADES.11.POWER SOURCE FOR IRRIGATION CONTROLLER TO BE COORDINATEDWITH ELECTRICAL ENGINEER, ELECTRICAL CONTRACTOR ANDLANDSCAPE CONTRACTOR.12.DO NOT INSTALL IRRIGATION SYSTEM WHEN OBVIOUS OBSTRUCTIONSOR GRADE CHANGES ARE PRESENT.13.ALL INFORMATION TO BE FIELD-VERIFIED BY CONTRACTOR PRIOR TOINSTALLATION.14.THE CONTRACTOR SHALL MAINTAIN AN ACCURATE & CURRENT'AS-BUILT' IRRIGATION PLAN ON SITE AT ALL TIMES.15.SYSTEM DESIGNED TO FALL WITHIN OPERATING PRESSURE OF 50 PSIAND 12 GPM. IF NOT WITHIN LIMITS, CONTRACTOR MUST CONTACTLANDSCAPE ARCHITECT.H2ODAYGPMLEVEL 1 PROPOSED IRRIGATION SCHEDULE- PHASE 1, HOTEL EAST149.8548721(MON)DURATIONMINUTES456090H2OINITIAL GPD1494872H2OEST. GPD742436ZONE1D2D***3DTTOTAL DAILYH2O INITIAL269.8 GALTOTAL DAILYH2O EST.134 GAL2(TUES)3(WED)4(THUR)5(FRI)6(SAT)7(SUN)149.85487245609014948727424361D2D***3DT269.8 GAL134 GAL149.85487245609014948727424361D2D***3DT269.8 GAL134 GAL149.85487245609014948727424361D2D***3DT269.8 GAL134 GAL0000N/A0 GAL0 GAL0000N/A0 GAL0 GAL0000N/A0 GAL0 GALSYMBOLSIZEDETAILDESCRIPTIONIRRIGATION LEGEND LEVEL 2BACKFLOW PREVENTERWATTS 009 RPZ OR EQUIVALENT1.0"2, L700IRRIGATION CONTROLLERHUNTER ICC2 OR EQUIVALENT1, L700CONNECTION POINTDRIP CONTROL VALVEHUNTER PCZ, ICZ DRIP CONTROL ORSIMILAR8-12 ,L700LATERAL LINE, SCH 40 PVC OR PE***4, L700HUNTER, HDL-09-12, DRIP LINE OR EQ.1-2, L7013-4, L700VALVE SCHEDULEIRRIRRNNQTY1115PER PLANPER PLANSEE PLAN7, L7003, L70021QUICK COUPLER FOR BLOW OUT USERAINBIRD HQ44-RC OR SIMILARISOLATION VALVE/GATE VALVE DRAINNIBCO T-113 BRONZE GATE VALVE ORSIMILARZONE #/TYPESIZEGPM1.0"ZONE TYPESD/N= POINT SOURCE/ INLINE DRIP IRRIGATION1.0"1.0"1.0"SOLAR SYNC SENSORHUNTER WSS-SEN OR SIMILARPER MFG11.0"DRIP LINE, SOFT WALL DRIP TUBINGSHRUB EMMITER: HUNTER HE-10-BPERENNIAL EMMITER: HUNTER HE-05-B(OR EQUIVALENT)DD.75"IRRIGATION SLEEVE, SCH 40 PVC1"PER PLANPER PLANBFCPCSS5, L700H2ODAYGPMLEVEL 1 PROPOSED IRRIGATION SCHEDULE- PHASE 2, HOTEL WEST0.31.290.70.62.151(MON)DURATIONMINUTES4545906045H2OINITIAL GPD13.558.05633696.75H2OEST. GPD629311848ZONE1D2D3DT4D***5DTOTAL DAILYH2O INITIAL267.7 GALTOTAL DAILYH2O EST.132 GAL02(TUES)000N/A0 GAL0 GAL***PHASE 1 ZONE 2D AND PHASE 2 ZONE 4D DESIGNED FOR HIGHER WATER USEPLANTINGSNOTE: DRIP IRRIGATION IS ALLOWED TO BE USED ANY DAY OF THE WEEK AS NEEDED PER CITYOF BOZEMAN WEBSITE:https://www.bozeman.net/departments/utilities/water-conservation/permanent-watering-restrictions. IFIT IS THE DUTY OF THE OWNER AND MAINTENANCE CONTRACTOR TO CONFORM TO ALL CITYOF BOZEMAN WATERING RESTRICTIONS UPON PROJECT OCCUPANCY.3(WED)4(THUR)5(FRI)6(SAT)7(SUN)0.31.290.70.62.15454590604513.558.05633696.756293118481D2D3DT4D***5D267.7 GAL132 GAL0.31.290.70.62.15454590604513.558.05633696.756293118481D2D3DT4D***5D267.7 GAL132 GAL0000N/A0 GAL0 GAL0.31.290.70.62.15454590604513.558.05633696.756293118481D2D3DT4D***5D267.7 GAL132 GAL0000N/A0 GAL0 GALANNUAL WATER USE BASED ON AREA USING PROPOSEDSCHEDULE- ESTABLISHEDWATERING WINDOW USED: MAY-SEPTEMBER(5 MONTHS/ 22WEEKS)PER C.O.B. WATER CONSERVATION WEBSITE-TOTAL GALLONS USED @22 WEEKS TOTAL SITE (EASTAND WEST BUILDINGS)= 1,064 GALLONS/WEEK X 22=23,408 GALLONS-AREA OF LANDSCAPE(PHASE 1 & 2) = 5,395 FT²WATER USE = 4.4 GAL/FT²IrrigationPlanL 600design5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\north central hotel bozeman & residences\autocad\01_sheets\24x36 d5 titleblock\l600_irrigation level 1 hotel bozeman.dwg North Central The Hotel Bozeman Bozeman, Montana KHM/HU TMS 02/10/23100% SD06/19/23SP106/30/23Pricing Set01/31/24SP1 RC102/09/24Pricing04/26/24SP1 RC210/31/24SP1 RC32ND LEVEL IRRIGATION NOTES:1.IRRIGATION SCHEDULE NOT PROVIDED FOR LEVEL 2 ROOF DECK. ROOF DECK NOT APPLICABLE TO CITY OF BOZEMAN WATER CONSERVATION STANDARDS, ITWILL BE THE RESPONSIBILITY OF THE LANDSCAPE CONTRACTOR TO ENSURE BEST MEANS AND METHODS FOR WATERING PLANTING MATERIALS ON ROOF WHILECONSERVING WATER. FUTURE DETAILING TO BE COORDINATED WITH NATIVE TRAY INSTALLER, MEP, ARCHITECT, AND LANDSCAPE ARCHITECT DURINGDEVELOPMENT OF CONSTRUCTION DOCUMENTATION.2.LEVEL 2 PLANT MATERIALS ARE NOT INCLUDED IN THE WATER BUDGET CALCULATOR.PHASE 1 WEST BUILDINGPHASE 2 EAST BUILDING