Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
023.1 - L202 - Level 2 Enlarged Plan
2'2'3'-11"12'-4"14'-4"10'-4"10'-11"6'-9"10'-11"12'-4"FINISH FLOOR116'-0"FINISH FLOOR116'-0"+115.96+115.96+TW PARAPET:117.00+TW GUARDRAIL:119.5026'-3" 17'-1"8'-10"FINISH FLOOR116'-0"+115.96+TW PARAPET:117.00+TW GUARDRAIL:119.504'-3"14'SYMBOLPRODUCTSITE MATERIALSCHEDULE - LEVEL2PEDESTALPAVERSBARK DUSTMULCHGREEN ROOFTRAYS15'-1"6'-10"31'-7"FINISH FLOOR116'-0"+115.96+115.96+TW PARAPET:116.67+TW GUARDRAIL:119.50Level 2Hotel WestEnlargementL 202design5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\north central hotel bozeman & residences\autocad\01_sheets\24x36 d5 titleblock\l000_hotel-bozeman_landscape.dwg North Central The Hotel Bozeman Bozeman, Montana KHM/HU TMS 02/10/23100% SD06/19/23SP106/30/23Pricing Set01/31/24SP1 RC102/09/24Pricing04/26/24SP1 RC210/31/24SP1 RC34208N1L2021/4" = 1'-0"Level 2 Hotel West Patio Enlargement - West4208N3L2021/4" = 1'-0"Level 2 Hotel West Patio Enlargement - EastRAISED PLANTERS WITH SCREENFENCE ATTACHMENT5L503PEDESTAL PAVERSGREEN ROOF TRAY SYSTEMPEDESTAL PAVERSGREEN ROOF TRAY SYSTEMPEDESTAL PAVERSGREEN ROOF TRAY SYSTEMGUARDRAIL AT BUILDING PARAPET WALLPARAPET WALL, SEE ARCHPARAPET WALL, SEE ARCHGUARDRAIL AT BUILDING PARAPET WALLROOF DRAIN BELOWPEDESTAL PAVERS, SEEARCH & STRUCTURAL6L5035L5036L503TRAY EDGING, FINAL SPECAND ATTACHMENT TBDTRAY EDGING, FINAL SPECAND ATTACHMENT TBDROOF DRAIN BELOWPEDESTAL PAVERS, SEEARCH & STRUCTURALSITE FURNITURE,SEE ARCH FOR DETAILSSITE FURNITURE,SEE ARCH FOR DETAILS4208N2L2021/4" = 1'-0"Level 2 Hotel West Amenity EnlargementPEDESTAL PAVERS4'X2'X2' RAISED PLANTERS,SET ON PEDESTAL PAVERSGUARDRAIL AT PARAPET WALLPARAPET WALL, SEE ARCH4'X2'X2' RAISED PLANTERS,SET ON PEDESTAL PAVERSROOF DRAIN BELOW PEDESTALPAVERS, SEE ARCH & STRUCTURALSITE FURNITURE,SEE ARCH FOR DETAILS