Loading...
HomeMy WebLinkAbout03-25-25 DURD Agenda and Packet MaterialsA. Call meeting to order - 12:00 p.m. B. Disclosures C. Changes to the Agenda D. Approval of Minutes D.1 Approve February Meeting Minutes(Staley) E. Public Comments on Non-agenda Items Falling within the Purview and Jurisdiction of the Board THE DOWNTOWN AREA URBAN RENEWAL DISTRICT BOARD OF BOZEMAN, MONTANA DURD AGENDA Tuesday, March 25, 2025 General information about the Downtown Area Urban Renewal District Board is available in our Laserfiche repository. If you are interested in commenting in writing on items on the agenda please send an email to comments@bozeman.net or visit the Public Comment Page prior to 12:00pm on the day of the meeting. At the direction of the City Commission, anonymous public comments are not distributed to the Board or staff. Public comments will also be accepted in-person and through Video Conference during the appropriate agenda items. As always, the meeting will be streamed through the Commission's video page and available in the City on cable channel 190. For more information please contact Ellie Staley, ellie@downtownbozeman.org This meeting will be held both in-person and also using an online video conferencing system. You can join this meeting: Via Video Conference: Click the Register link, enter the required information, and click submit. Click Join Now to enter the meeting. Via Phone: This is for listening only if you cannot watch the stream, channel 190, or attend in- person United States Toll +1 346 248 7799 Access code: 956 1935 4304 This is the time to comment on any non-agenda matter falling within the scope of the Downtown Urban Renewal District Board. There will also be time in conjunction with each agenda item for public comment relating to that item but you may only speak once per topic. Please note, the Board cannot take action on any item which does not appear on the agenda. All persons addressing the Board shall speak in a civil and courteous manner and members of the 1 F. FYI/Discussion F.1 Executive Director's March 2025 Report (Staley) F.2 Monthly Finance Report (Staley) F.3 2nd Draft FY26 Budget & DURD Board Member Priorities Review (Staley) F.4 Pedlet Pilot Program Review (Staley) G. Adjournment audience shall be respectful of others. Please state your name, and state whether you are a resident of the city or a property owner within the city in an audible tone of voice for the record and limit your comments to three minutes. For more information please contact Ellie Staley, Downtown Bozeman Partnership, ellie@downtownbozeman.org This board generally meets the 3rd Tuesday of the month from 12:00 to 1:30pm City Board meetings are open to all members of the public. If you have a disability that requires assistance, please contact our ADA Coordinator, David Arnado, at 406.582.3232. 2 Memorandum REPORT TO:Downtown Area Urban Renewal District Board FROM:Ellie Staley, Downtown Bozeman Partnership SUBJECT:Approve February Meeting Minutes MEETING DATE:March 25, 2025 AGENDA ITEM TYPE:Minutes RECOMMENDATION:I move to approve the meeting minutes from the February 2025 board meeting. STRATEGIC PLAN:4.4 Vibrant Downtown, Districts & Centers: Promote a healthy, vibrant Downtown, Midtown, and other commercial districts and neighborhood centers – including higher densities and intensification of use in these key areas. BACKGROUND:Meeting minutes from February 2025. UNRESOLVED ISSUES:None. ALTERNATIVES:As suggested by board. FISCAL EFFECTS:None. Attachments: Downtown URD February 2025 Minutes.pdf Report compiled on: March 11, 2025 3 Downtown URD Board Meeting Minutes, February 18, 2025 Page 1 of 2 THE DOWNTOWN URD BOARD MEETING OF BOZEMAN, MONTANA MINUTES February 18, 2025 General information about the Downtown Area Urban Renewal District Board is available in our Laserfiche repository. A) 00:07:39 Call meeting to order - 12:30 p.m. Present: Jake Van Dusen, Tony Renslow, John How, Nicholas Wickes Absent: None Excused: Marley McKenna, Amy Horton, Sky Cook B) 00:07:41 Disclosures C) 00:07:45 Changes to the Agenda D) 00:07:51 Approval of Minutes D.1 00:24:41 Approve January Meeting Minutes 00:24:41 Motion to approve I move to approve the meeting minutes from the January 2025 board meeting. Jake Van Dusen: Motion Tony Renslow: 2nd 00:24:41 Vote on the Motion to approve I move to approve the meeting minutes from the January 2025 board meeting. The Motion carried 3 - 0. Approve: Jake Van Dusen Tony Renslow Nicholas Wickes 4 Downtown URD Board Meeting Minutes, February 18, 2025 Page 2 of 2 Disapprove: None E) 00:08:42 Public Comments on Non-agenda Items Falling within the Purview and Jurisdiction of the Board F) 00:09:01 FYI/Discussion F.1 00:09:02 Executive Director's February 2025 Report 00:13:13 Ellie Staley provided project updates on URD projects including downtown parking group, I-Ho Peace Park and the downtown streetscape standard. F.2 Monthly Finance Report F.3 00:30:53 Draft FY26 Budget & DURD Board Member Priorities Review G) 01:46:05 Adjournment For more information please contact Ellie Staley, Downtown Bozeman Partnership, ellie@downtownbozeman.orgThis board generally meets the 3rd Tuesday of the month from 12:00 to 1:30pm 5 Memorandum REPORT TO:Downtown Area Urban Renewal District Board FROM:Ellie Staley, Executive Director Downtown Bozeman Partnership SUBJECT:Executive Director's March 2025 Report MEETING DATE:March 25, 2025 AGENDA ITEM TYPE:Plan/Report/Study RECOMMENDATION:Discuss STRATEGIC PLAN:7.3 Best Practices, Creativity & Foresight: Utilize best practices, innovative approaches, and constantly anticipate new directions and changes relevant to the governance of the City. Be also adaptable and flexible with an outward focus on the customer and an external understanding of the issues as others may see them. BACKGROUND:Ellie will present the monthly report of general program updates and updates to topics relating to downtown. Board will discuss relevant matters. UNRESOLVED ISSUES:None ALTERNATIVES:None FISCAL EFFECTS:None. Attachments: 24006_04_BOZEMAN_URD_TASK_3_PACKAGE_1 1.pdf DBP Monthly ED Report 3-25 - URD.pdf Downtown Tracking Sheet-Dev. Q1_2025.pdf Downtown Tracking Sheet-Bus. Q1_2025.pdf Report compiled on: March 11, 2025 6 PREPARED FOR:SITEBOZEMAN, MTCITY OF BOZEMANMAIN STREET LIGHTING DESIGN PACKAGE 1CITY OF BOZEMANBOZEMAN, MT20 EAST OLIVEVICINITY MAPPROJECT NO:24006_04ISSUED FOR CONSTRUCTIONFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION24006_04-------ISSUED FOR CONSTRUCTION-----03/11/25RELIMINARY - FOR REVIEW02/12/25HGC/KRK24006_04_ELEC_PROD_PACKAGE_1.DWGJHS12345671098PROJECT NO:24006_04ISSUED FOR CONSTRUCTIONE1.1106 East Babcock, Suite L1Bozeman, Montana 59715406.522.9876sanbell.comSHEETTITLEE1.1COVERE1.2LEGENDE1.3ELECTRICAL SITE PLANE1.4ELECTRICAL WIRING DIAGRAME1.5ELECTRICAL DETAILSE1.6ELECTRICAL DETAILSE1.7ELECTRICAL DETAILSE1.8ELECTRICAL DETAILSE1.9ELECTRICAL DETAILSE1.10LUMINAIRE CUT SHEETSP:\24006_04_Bozeman_URD_Task_3_Main_St_Lighting\CADD_C3D\PRODUCTION_DWG\Updates packages\24006_04_ELEC_PROD_Package_1.dwg, E1.1, 3/11/2025 4:28:42 PM, kketterling, 1:1 7 ELECTRIC JUNCTION BOXEXISTING STORM DRAIN MANHOLEEXISTING CATCH BASINSIGNPOWER POLEEXISTING WATER VALVEEXISTING FIRE HYDRANTBOLLARDBUSHEXISTING CURB STOPFIRE DEPT. CONNECTIONFIBER OPTIC PEDESTALGAS METERGAS MANHOLEGAS VALVEGUYWIREIRRIGATION VALVEIRRIGATION BOXLIGHT POLEPOWER METERPOWER MANHOLEELECTRIC PEDESTALROOF DRAINSIGNAL POLEEXISTING SANITARY SEWER MANHOLESANITARY SEWER CLEAN OUTTELEPHONE BOXTELEPHONE MANHOLETELEPHONE PEDESTALTRANSFORMERCONIFEROUS TREEDECIDUOUS TREECOMMUNICATIONS MANHOLECOMMUNICATIONS PEDESTALWELLYARD HYDRANTEW = FINISHED GRADE AT EDGE OF WALKTC = FINISHED GRADE AT TOP BACK OF CURBBC = FINISHED GRADE AT BUILDING CORNERTW = FINISHED GRADE AT TOP OF WALLAC = FINISHED GRADE AT ASPHALTEA = FINISHED GRADE AT EDGE OF ASPHALTEC = FINISHED GRADE AT EDGE OF CONCRETESDI = STORM DRAIN INLETSDMH = STORM DRAIN MANHOLEFL = FINISHED GRADE AT FLOWLINEFG = FINISHED GRADE EX = APPROXIMATE EXISTING ELEVATIONPOC = POINT ON CURVEEXISTING WATER REDUCERGAS WELLFOUND CORNER MONUMENT AS NOTEDSET CORNER MONUMENT, REBAR WITH CAPBENCHMARKSECTION QUARTER CORNERSECTION CORNERWTR = WATERPI = POINT OF INTERSECTIONPRC = POINT OF REVERSE CURVERT = RIGHTLT = LEFTSS = SANITARY SEWERPT = POINT OF TANGENCYSD = STORM DRAINGV = GATE VALVEBFV = BUTTERFLY VALVERED = REDUCERLF = LINEAL FOOTFT = FEETSSMH = SANITARY SEWER MANHOLEBVC = BEGIN VERTICAL CURVECS = CURB STOPEVC = END VERTICAL CURVEPVI = POINT OF VERTICAL INTERSECTIONLINETYPESABBREVIATIONSSYMBOLSPROPOSED CATCH BASINPROPOSED WATER REDUCERPROPOSED WATER VALVEPROPOSED FIRE HYDRANTPROPOSED CURB STOPPROPOSED SANITARY SEWER MANHOLEPROPOSED STORM DRAIN MANHOLEKEYNOTE CALL OUT(SEE KEYNOTE LEGEND)SRVC = SERVICE(TYP.) = TYPICALPC = POINT OF CURVATUREEXISTING MONUMENT BOXPROPOSED MONUMENT BOXGR = EXISTING GRADE AT GROUNDBRK = GRADE BREAKFIBER OPTICGAS PIPELINEOIL PIPELINEUNDERGROUND POWERSANITARY SEWERSTORM DRAINTELEPHONETELEVISION/CABLEWATERCONTOUROVERHEAD POWERFENCE - VINYLFENCE - BARBED WIREFENCE - WOODCURB AND GUTTEREDGE OF ASPHALTEDGE OF GRAVELFENCE - CHAINLINK/WOVEN WIREEXISTINGPROPOSEDHP = HIGH POINTDEMO AREAPROPOSED ASPHALTPROPOSED CONCRETEPROPOSED GRAVELISSUED FOR CONSTRUCTIONEXISTING WATER MANHOLEWATER METERLIQUID PROPANE PIPELINEFILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION MAIN STREET LIGHTING DESIGN PACKAGE 1 LEGEND CITY OF BOZEMAN URBAN RENEWAWAL DISTRICT TASK ORDER NO. 3 BOZEMAN, MTE1.2JHS 24006_04_ELEC_PROD_PACKAGE_1.DWG HGC/KRK 02/12/25 RELIMINARY - FOR REVIEW 03/11/25 - - - - - ISSUED FOR CONSTRUCTION - - - - - -- 24006_04NOTE:-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BESTINFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCHINFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BESTRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITYCOMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.-ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARDSPECIFICATIONS 7TH EDITION, APRIL, 2021, AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS, DATEDOCTOBER, 2024.-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THERESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY APARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUESAS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.P:\24006_04_Bozeman_URD_Task_3_Main_St_Lighting\CADD_C3D\PRODUCTION_DWG\Updates packages\24006_04_ELEC_PROD_Package_1.dwg, E1.2, 3/11/2025 4:28:43 PM, kketterling, 1:1 8 L3L4L5L1L2ISSUED FOR CONSTRUCTION020SCALE: 1" = 20'401020FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION MAIN STREET LIGHTING DESIGN PACKAGE 1 ELECTRICAL SITE PLAN CITY OF BOZEMAN URBAN RENEWAWAL DISTRICT TASK ORDER NO. 3 BOZEMAN, MTE1.3JHS 24006_04_ELEC_PROD_PACKAGE_1.DWG HGC/KRK 02/12/25 RELIMINARY - FOR REVIEW 03/11/25 - - - - - ISSUED FOR CONSTRUCTION - - - - - -- 24006_04CONDUIT & WIRE SCHEDULEABCP:\24006_04_Bozeman_URD_Task_3_Main_St_Lighting\CADD_C3D\PRODUCTION_DWG\Updates packages\24006_04_ELEC_PROD_Package_1.dwg, E1.3, 3/11/2025 4:28:46 PM, kketterling, 1:1 9 ISSUED FOR CONSTRUCTIONAWG NO.2SERVICE120/240 VOLTGROUND RODBARE AWG NO.6SERVICE RATED200 AMP METERMAINCIRCUIT BREAKER20 AMP,2 POLE,SINGLE THROWMAIN DISCONNECT200 AMPAWG NO.14AWG NO.6TO LUMINAIRESAWG NO.10(120 V)(120 V)N.E.M.A.TYPE 3RCABINETAUTO-OFF-MANUALSWITCHPHOTO-ELECTRICCONTROLTO GROUND LUGOF EACH POLEAWG NO.820 AMP CONTACTOR2 POLE,SINGLE THROWLIGHTNINGARRESTORFILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION MAIN STREET LIGHTING DESIGN PACKAGE 1 ELECTRICAL WIRING DIAGRAM CITY OF BOZEMAN URBAN RENEWAWAL DISTRICT TASK ORDER NO. 3 BOZEMAN, MTE1.4JHS 24006_04_ELEC_PROD_PACKAGE_1.DWG HGC/KRK 02/12/25 RELIMINARY - FOR REVIEW 03/11/25 - - - - - ISSUED FOR CONSTRUCTION - - - - - -- 24006_04 P:\24006_04_Bozeman_URD_Task_3_Main_St_Lighting\CADD_C3D\PRODUCTION_DWG\Updates packages\24006_04_ELEC_PROD_Package_1.dwg, E1.4, 3/11/2025 4:28:50 PM, kketterling, 1:1 10 ISSUED FOR CONSTRUCTION FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION MAIN STREET LIGHTING DESIGN PACKAGE 1 ELECTRICAL DETAILS CITY OF BOZEMAN URBAN RENEWAWAL DISTRICT TASK ORDER NO. 3 BOZEMAN, MTE1.5JHS 24006_04_ELEC_PROD_PACKAGE_1.DWG HGC/KRK 02/12/25 RELIMINARY - FOR REVIEW 03/11/25 - - - - - ISSUED FOR CONSTRUCTION - - - - - -- 24006_04 P:\24006_04_Bozeman_URD_Task_3_Main_St_Lighting\CADD_C3D\PRODUCTION_DWG\Updates packages\24006_04_ELEC_PROD_Package_1.dwg, E1.5, 3/11/2025 4:28:50 PM, kketterling, 1:1 11 ISSUED FOR CONSTRUCTION FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION MAIN STREET LIGHTING DESIGN PACKAGE 1 ELECTRICAL DETAILS CITY OF BOZEMAN URBAN RENEWAWAL DISTRICT TASK ORDER NO. 3 BOZEMAN, MTE1.6JHS 24006_04_ELEC_PROD_PACKAGE_1.DWG HGC/KRK 02/12/25 RELIMINARY - FOR REVIEW 03/11/25 - - - - - ISSUED FOR CONSTRUCTION - - - - - -- 24006_04 P:\24006_04_Bozeman_URD_Task_3_Main_St_Lighting\CADD_C3D\PRODUCTION_DWG\Updates packages\24006_04_ELEC_PROD_Package_1.dwg, E1.6, 3/11/2025 4:28:52 PM, kketterling, 1:1 12 ISSUED FOR CONSTRUCTION FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION MAIN STREET LIGHTING DESIGN PACKAGE 1 ELECTRICAL DETAILS CITY OF BOZEMAN URBAN RENEWAWAL DISTRICT TASK ORDER NO. 3 BOZEMAN, MTE1.7JHS 24006_04_ELEC_PROD_PACKAGE_1.DWG HGC/KRK 02/12/25 RELIMINARY - FOR REVIEW 03/11/25 - - - - - ISSUED FOR CONSTRUCTION - - - - - -- 24006_04 P:\24006_04_Bozeman_URD_Task_3_Main_St_Lighting\CADD_C3D\PRODUCTION_DWG\Updates packages\24006_04_ELEC_PROD_Package_1.dwg, E1.7, 3/11/2025 4:28:56 PM, kketterling, 1:1 13 ISSUED FOR CONSTRUCTION FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION MAIN STREET LIGHTING DESIGN PACKAGE 1 ELECTRICAL DETAILS CITY OF BOZEMAN URBAN RENEWAWAL DISTRICT TASK ORDER NO. 3 BOZEMAN, MTE1.8JHS 24006_04_ELEC_PROD_PACKAGE_1.DWG HGC/KRK 02/12/25 RELIMINARY - FOR REVIEW 03/11/25 - - - - - ISSUED FOR CONSTRUCTION - - - - - -- 24006_04 P:\24006_04_Bozeman_URD_Task_3_Main_St_Lighting\CADD_C3D\PRODUCTION_DWG\Updates packages\24006_04_ELEC_PROD_Package_1.dwg, E1.8, 3/11/2025 4:29:02 PM, kketterling, 1:1 14 ISSUED FOR CONSTRUCTION FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION MAIN STREET LIGHTING DESIGN PACKAGE 1 ELECTRICAL DETAILS CITY OF BOZEMAN URBAN RENEWAWAL DISTRICT TASK ORDER NO. 3 BOZEMAN, MTE1.9JHS 24006_04_ELEC_PROD_PACKAGE_1.DWG HGC/KRK 02/12/25 RELIMINARY - FOR REVIEW 03/11/25 - - - - - ISSUED FOR CONSTRUCTION - - - - - -- 24006_04 P:\24006_04_Bozeman_URD_Task_3_Main_St_Lighting\CADD_C3D\PRODUCTION_DWG\Updates packages\24006_04_ELEC_PROD_Package_1.dwg, E1.9, 3/11/2025 4:29:05 PM, kketterling, 1:1 15 ISSUED FOR CONSTRUCTION FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION MAIN STREET LIGHTING DESIGN PACKAGE 1 LUMINAIRE CUT SHEETS CITY OF BOZEMAN URBAN RENEWAWAL DISTRICT TASK ORDER NO. 3 BOZEMAN, MTE1.10JHS 24006_04_ELEC_PROD_PACKAGE_1.DWG HGC/KRK 02/12/25 RELIMINARY - FOR REVIEW 03/11/25 - - - - - ISSUED FOR CONSTRUCTION - - - - - -- 24006_04 P:\24006_04_Bozeman_URD_Task_3_Main_St_Lighting\CADD_C3D\PRODUCTION_DWG\Updates packages\24006_04_ELEC_PROD_Package_1.dwg, E1.10, 3/11/2025 4:29:08 PM, kketterling, 1:1 16 Downtown Bozeman Partnership – ED Report March 2025 Downtown Updates: • SAVE THE DATE! The DBP Annual Breakfast is on May 21, 2025 at 7:30am. More details to come! • DBP, DBA, BID & DURD Draft & Final FY26 Budgets to be presented to boards during March & April Board meetings or at committee meetings…BID & DURD FY26 Budgets to be presented to City Commission on Tuesday, May 6. • Downtown Bozeman or City of Bozeman? Check out our latest news article that highlights the services offered by both: https://downtownbozeman.org/news/dtnbznorcob Upcoming Public Meetings: https://www.bozeman.net/departments/city-commission/advisory- boards/calendar • The UDC workshops wrapped up on March 12. We will continue to update the boards on items related to the UDC update and approval process. • City Commission Meeting - Tuesday, March 25 at 6pm, https://www.bozeman.net/departments/city-commission/city-boards/calendar • Downtown URD Consent Items - PSA with Montana Lines for Phase 1-5th & Main Lighting Project, Change Order with Constructive Solutions to extend the timeline for June completion. • DURD Board Meeting – Tuesday, March 25 at 12pm at City Hall (RESCHEDULED) • BID Board Meeting – Wednesday, March 26 at 12pm at City Hall (RESCHEDULED) DURD Project/City of Bozeman Updates: • Downtown Parking Group Update: Final working group meeting was on Feb. 21. Vision document and action plan with focus on short- and long-term solutions will be made public in the coming months. The group will continue to meet as needed for updates and input. • Current DURD/CoB Project Updates: o Pedlet Pilot Project – Working with property and business owners on South Willson to hopefully install a pedlet at Bitterroot Bistro this spring/summer. Pedlet project example: https://www.independent.com/2025/01/27/santa-barbara-city-council-looks-into-short- term-fixes-for-state-street/, see FYI/Discussion item for more information. o I-Ho Peace Park – 100% site plan submitted to CoB, submitted for the Open Space Grant in coordination with Commissioner Madgic, received estimate from Langlas, prepping for community fundraising effort. o 5th & Main & Lighting Project – Phase 1 set to begin April 1, 5 luminaires at Arco site, Phase 2, signal lighting at 5th and Main intersection is slated for spring 2025 and phase 3 & 4 slated for FY 26-27. See attached Phase 1 plans. o The Alley Beautification Project - Weather extension requested/approved for lighting and sign installation. Project is slated to be complete by June 1, 2025. o Downtown Streetscape Standard – Final Draft under City Engineering Department review. See final draft version attached. 17 • For additional updates, plans or reports for any of the projects above, please email me at ellie@downtownbozeman.org Upcoming Events: • Downtown 50th Anniversary Event – Thursday, April 17 at 3;30pm at The Baxter Ballroom • 5th Annual Downtown Bozeman Restaurant Week - April 21st-27th • DBP Annual Breakfast – Thursday, May 21 at 7:30am at The Armory Music Hall. 18 DOWNTOWN DEVELOPMENT TRACKING Q1 2025 January - March CURRENT PROJECTS ADDRESS STATUS PROPERTY TYPE UNIT TYPE(S) NOTES (design professional, stories, etc) GRANT REIMBURSE MENTS Cooper Black (Dtn Antiques)122 E Main St In Progress Mixed 2 commercial, 3 residential Closure 6/3-6/8, Walkway through 2025 N/A The Baltimore 222 E Main St In Progress Mixed GL Restaurant GL Italian Restaurant, additional details TBA N/A Freestone on Main 421 W Main In Progress Residential 120, added Midtown and Downtown URD collab lghting project TBD Residential Incentive, Sewer Imp. Argreement, Streetscape Abby Hetherington Interiors 33 S Tracy In Progress Retail/Commerc ial 1 GL, 1 UG Langlas & Graphic Haus, 2 stories Streetscape, Façade, Utility, Fire- Safety grant approved and work completed 108 W Babcock 108 W Babcock Plans submitted/stre etscape deviation requested Mixed Pearson Design Group, 4 stories, proposed office/residential Mendenhall Flats 240 E Mendenhall Plans submitted Mixed Commercial, Office, 15 two and three bedroom condos Intrinsik, break ground in 2025 Schnee (left side of business)35 E Main Restaurant/Bar Western Bar Tracy Anderson 223 E Main In progress FUTURE PROJECTS ADDRESS STATUS PROPERTY TYPE UNIT TYPE(S) NOTES (design professional, stories, etc) GRANT REIMBURSE MENTS The Scully-Old US Bank Location 112 E Main St 2025 Mixed 7-9, 4 stories Residential, streetscape Fire Station One 30 N Rouse N/A Mixed 50 units at 120% AMI 1.6M Workforce Housing Agreement - 2027 Block B (Salvation Army)32 S Rouse 2025/26 Hotel/Hilton Co. 191 keys, 6 stories, 137 UG parking spaces Block A 503-519 E Babcock 2025/26 Mixed 44 units, 7 stories 75 parking spaces, high-end Empire Site 606 E Main N/A Hotel Hotel Project 302 E Mendenhall 2027 Hotel Ag Depot 620-714 E Mendenhall Mixed Downtowner Building S Willson to W Main N/A Mixed Roof, brick and suppression restoration, applied for MHPG 2/29 BG Mill 714 E Mendenhall 18 condos, 5 stories NOT IN DURD Hampton Inn 507 W Main In Progress Hotel + retail 113 rooms, 3 retail, 4 stories *not in URD Sanderson Stewart Hotel Bozeman and Residences 1 W Lamme St In Progress Hotel/ Marriott 120 guest rooms, 29- two-bedroom, 5-3- bedroom, 71 keys 6 stories, Autograph Collection. *not in URD SMA Architecture 19 DOWNTOWN BUSINESS TRACKING Q1 2025 JAN-MAR NEW DBA MEMBERS 8 BUSINESS ADDRESS DATE OF MEMBERSHIP Ballroom Dance Bozeman 1632 South Rouse Ave 16-Jan The IV Element 140 E Main Street, Suite E 22-Jan Big Sky Wired of Montana 1010 E Main St 23-Jan Carlisle 25 E Mendenhall St 10-Feb Ascension Studio 521 E Peach St Suite C 12-Feb American Computer & Robotics Museum Outside Downtown - 2023 Stadium Drive, Suite 1-A 25-Feb Artists' Gallery 111 South Grand Ave, Suite 106, 4-Mar Cousins Pub 211 E Main St Suite 101 5-Mar NEW BUSINESSES 12 BUSINESS ADDRESS DATE OF OPENING The IV Element 140 E Main Street, Suite E 1-Feb Carlisle at Element Hotel 25 E Mendenhall 20-Feb Spitz Bozeman 1101 E Main St. Unit 101 13-Mar Miguel y Co 131 W Babcock 15-Apr Frugal Burger 113 E Main 1-May Meili Vodka Between Bangtail & Studio Noble (upstairs)TBA Melt House S Grand TBA Italian Restaurant (Name TBA)224 E Main St TBA Crossbow Hats 127 E Main St TBA Tommy's R&D Motobar 326 E Mendenhall TBA Gallatin Valley Organics  628 W Main St-NOT downtown TBA New Market/Wine Bar (Name TBA)33 W Main TBA CLOSED BUSINESS BUSINESS ADDRESS DATE OF CLOSURE 4 Sweet Peaks - West 628 W Main St-NOT downtown January Teton Gravity Research 9 E Main St Suite 100 April Tanoshii 113 E Main 16-Jul Berkshire Hathaway HomeServices 37 S Willson TBA VACANT LOCATIONS 6 BUSINESS ADDRESS DATE OF CLOSURE Shredmonk 121 W Main 15-Jul Cooper Black (frmly DTN Antiques)122 E Main 15-Jul Thrive 400 E Babcock 15-Jul Tanoshii 113 E Main 16-Jul Sweet Peaks - West  628 W Main St 17-Jul Teton Gravity Research 9 E Main St Suite 100 April DBA DROPPED MEMBERS 5 BUSINESS NOTES DROP DATE Langlas & Associates Moved outside of downtown core 6-Jan Wells Fargo "We don’t have anyone locally who is a decision maker on memberships as it is managed by the national team." 7-Jan Cyclebar Bozeman Closed :(8-Jan Nectar Skin Care Studio "I appreciate everything the DBA does but I’m underutilizing the service and need to trim some 22-Jan Indikoi I think we are too far out of downtown to really take advantage of the membership benefits and events given the size of our 5-Feb 20 Memorandum REPORT TO:Downtown Area Urban Renewal District Board FROM:Ellie Staley, Downtown Bozeman Partnership SUBJECT:Monthly Finance Report MEETING DATE:March 25, 2025 AGENDA ITEM TYPE:Finance RECOMMENDATION:Discuss. STRATEGIC PLAN:4.4 Vibrant Downtown, Districts & Centers: Promote a healthy, vibrant Downtown, Midtown, and other commercial districts and neighborhood centers – including higher densities and intensification of use in these key areas. BACKGROUND:Ellie will present the monthly finance report. UNRESOLVED ISSUES:None. ALTERNATIVES:None. FISCAL EFFECTS:None. Attachments: URD Finance Report 3-25.pdf Report compiled on: March 11, 2025 21 DURD - March 2025 Finance Report Category FY25 Budget FY25 YTD Recent Activity Income Starting Cash Balance $6,061,900 $6,061,900 ** not finalized Income from TIF COB Interlocal Share $2,362,500 Entitlement Share State of Montana $57,100 Interest Income $2,100 Other Income Total Income $8,483,600 $6,061,900 Expenses Operations DBP Management Fee $236,000 $236,000 City Administrative Costs/Support $61,100 Total Operations $297,100 $236,000 Infrastructure Improvements Park Improvements (Soroptimist/NBPP)$10,000 $5,474 $2405 snow removal Alley Improvements $50,000 $137,344 $4510 signs of montana Utility Infrastructure Improvements $350,000 Wayfinding & Parking Signage $15,000 $3,920 Bozeman Creek Improvements $0 Alternative Transportation Projects $40,000 Tree Replacement Project (Streetscape Imp. in FY24)$50,000 $11,850 Street Furniture/Streetscape Improvements & Furniture $25,000 $28,587 $1,685 streetlamp repair, $554 kiosk repair Intersection Cable Anchor Repairs $10,000 Parklet Infrastructure $20,000 Streetlamp Power Reconfiguration Project (SILD)$100,000 $4,600 Streetscape Assistance Grant Program $50,000 Life-Safety Grant Program $30,000 Fiber-Broadband Infrastructure Grants $10,000 $400 $400 23 W Babcock- fiber grant Art Enhancement/CPTED Grant Program $20,000 $20,000 Housing Assistance Residential Incentive Grant Program $200,000 Workforce Housing Project - Fire Station One $1,600,000 Total Improvements $2,580,000 $212,175 Planning Park Improvement Planning (Soroptimist/NBPP)$50,000 $75,442 $47,932 Sanbell Alley Planning $25,000 $10,231 $390 groundprint Utility Infrastructure Improvement Planning $50,000 $13,200 Wayfinding Plan Development $35,000 Bozeman Creek Planning $20,000 $15,617 Alternative Transportation Planning $10,000 Downtown Streetscape Design Standards $10,000 $8,809 Side-Streetscape Preliminary Engineering $25,000 Parklet Planning/Program $10,000 DBIP General Implementation $50,000 $108 $63 dbp, Professional Services Term Contract $75,000 Code Amendments $0 Downtown Infrastructure & Public Realm Plan $0 Technical Assistance Grant Program $50,000 Parking - Designated Funds Parking Supply, Management Planning, and Data Collection $4,770,000 Parking Supply, Site Plans and Data Collection Parking Supply - Designated Funds Total Planning/Parking $5,180,000 $123,407 Parking Structure Garage Bond Payment $335,000 Total Parking Garage Payments $335,000 $0 Total Expenses $8,392,100 $571,582 Balance $91,500 $5,490,318 22 Memorandum REPORT TO:Downtown Area Urban Renewal District Board FROM:Ellie Staley, Executive Director SUBJECT:2nd Draft FY26 Budget & DURD Board Member Priorities Review MEETING DATE:March 25, 2025 AGENDA ITEM TYPE:Finance RECOMMENDATION:Discussion. STRATEGIC PLAN:4.4 Vibrant Downtown, Districts & Centers: Promote a healthy, vibrant Downtown, Midtown, and other commercial districts and neighborhood centers – including higher densities and intensification of use in these key areas. BACKGROUND:Ellie will present the first draft of the FY26 Budget with FY25 Year-End Projections. Board to review and discussion how this draft can be revised to better reflect the board member priorities. UNRESOLVED ISSUES:None. ALTERNATIVES:None. FISCAL EFFECTS:None. Attachments: DURD Prioritites FY25-26.pdf DTN URD Budget FY2026-DRAFT V1.pdf Report compiled on: March 11, 2025 23 Downtown URD Priorities FY25/26 – Board Meeting Review, March 19, 2024 Downtown URD Mission Statement – DURD board to read The Downtown Bozeman Urban Renewal District board (URD) will foster an economically thriving district that: 1) attracts investment; 2) stabilizes and strengthens the tax base; and 3) supports the vitality and diversity of the Gallatin Valley as its social and cultural center. Consolidated Board Member Priority List: - Improve/Upgrade Infrastructure – focus on safety, sustainability and placemaking o Ex. streetscape standard, utility improvements, improvement agreements, Bozeman creek, SILD, park improvements, fiber grant - Parking Supply/Data - o Ex. Increase long-term supply ($$), support data collection, site analysis and plan development, support policy changes for current supply improvements/maintenance, support employee parking program o Surface lot improvements – City of Bozeman (help coordinate/fund) - Transportation Improvements – accessibility upgrades, safety and alternative transportation options o Ex. Wayfinding plan and infrastructure, pedestrian safety improvements, life-safety grant - Support Residential Incentives or Housing Assistance Fund (through non-profit support?) o Current projects – 1.6 million allocated for 50 units at FS1, 100K in Residential Incentive Grants - Community Engagement/Involvement o Ex. Management support to DBP/CoB, parklet program, Policy involvement (MT TIF, Bozeman Code amendments, local option sales tax) - Beautification (separate category or combined with Infrastructure Improvements?) o Ex: Alley project, streetscape improvements (trees, benches, bike racks etc.), Soroptimist Park Improvements Downtown URD Guiding Verbiage: In 1995, the City Commission adopted the Urban Renewal Plan for downtown Bozeman which was subsequently amended in 2015. The intent and purpose of the Urban Renewal Plan emphasizes: 1. Bozeman’s historical character as a “working” downtown shall be maintained. 2. Traffic movement and access shall be designed with the emphasis on the downtown as a designation rather than improving the flow of through traffic. 3. The facilitation of private/public partnerships is encouraged in the implementation of the Plan. 4. Objectives shall be accomplished by incentives whenever possible. 5. Private property rights will be respected. 6. Administrative practices shall be conducted in a constructive manner which fosters cooperation. 7. This Plan is further detailed, refined, prioritized and implemented by the “Downtown Improvement Plan” which outlines specific programs and projects consistent with the Urban Renewal Plan. The Urban Renewal Plan established nine “Guiding Principles” to provide direction for improving Bozeman’s historic downtown. The Urban Renewal Study Committee considered the first three principles more important than the next three with the last three the least important. However, the Committee deemed all nine principles to 24 be vital to achieving the vision for downtown. Key implementation actions were identified for each principle (may apply to multiple principles but are only listed once below). 1. Strengthen downtown’s economic vitality • Provide more, better managed parking; retain public offices and anchor businesses; facilitate commercial development; eliminate unnecessary regulatory barriers to reinvestment; enable high density housing; eliminate through truck traffic and restore Main Street as pedestrian-friendly 2. Improve the safety, security and health of the district • Improve traffic flow emphasizing downtown as a destination; improve public works; improve night-time lighting; improve sidewalks; increase police presence; improve alley and parking lot appearance and safety 3. The image of downtown shall be continuously improved • Improve streetscape aesthetics and amenities; enhance appearance of and accessibility to Bozeman Creek; improve trash removal 4. Downtown’s accessibility shall be improved • Provide effective public transportation; better accommodate bicycles; reduce reliance on private automobiles 5. “Community Partnership” is fundamental to downtown’s success • Encourage growth of cultural activities; preserve historic character 6. Downtown’s diversity shall be facilitated 7. The cost of projects and programs shall be weighed against their benefits 8. Downtown shall become more user friendly 9. Cultural activities shall be nurtured and expanded downtown 25 Downtown Urban Renewal District Board - FY25/26 DRAFT Category FY25 FINAL Budget FY25 PROJ. Budget FY26 DRAFT Budget FY26 AMEND Budget Income Starting Cash Balance $6,061,900 $6,061,900 $871,500 $7,710,287 Income from TIF COB Interlocal Share $2,362,500 $2,362,500 $2,598,800 $2,598,800 Entitlement Share State of Montana $57,100 $57,100 $57,100 $57,100 Interest Income $2,100 $2,100 $2,100 $2,100 Other Income Total Income $8,483,600 $8,483,600 $3,529,500 $10,368,287 Expenses Operations DBP Management Fee $236,000 $236,000 $251,000 $251,000 City Administrative Costs/Support $61,100 $61,100 $64,300 $64,300 Total Operations $297,100 $297,100 $315,300 $315,300 Infrastructure Improvements Park Improvements (Soroptimist/NBPP)$10,000 $50,000 $250,000 $250,000 Alley Improvements $50,000 $132,834 $0 $0 Utility Infrastructure Improvements $350,000 $100,000 $400,000 $400,000 Wayfinding & Parking Signage $15,000 $3,920 $20,000 $20,000 Bozeman Creek Improvements $0 $10,000 $50,000 Alternative Transportation Projects $40,000 $25,000 $10,000 Tree Replacement Project (Streetscape Imp. in FY24)$50,000 $11,850 $50,000 $10,000 Street Furniture/Streetscape Improvements & Furniture $25,000 $25,000 $25,000 $100,000 Intersection Cable Anchor Repairs $10,000 $10,000 $10,000 Parklet Infrastructure $20,000 $0 $10,000 Streetlamp Power Reconfiguration Project (SILD)$100,000 $4,600 $0 $0 Streetscape Assistance Grant Program $50,000 $100,000 $100,000 Life-Safety Grant Program $30,000 $30,000 $30,000 Fiber-Broadband Infrastructure Grants $10,000 $10,000 $10,000 Art Enhancement/CPTED Grant Program $20,000 $20,000 $20,000 $40,000 Total Infrastructure $780,000 $348,204 $950,000 $1,630,600 Housing Assistance Residential Incentive Grant Program $200,000 $200,000 $400,000 Workforce Housing Project - Fire Station One $1,600,000 $1,600,000 Total Housing $1,800,000 $200,000 $2,000,000 Planning Park Improvement Planning (Soroptimist/NBPP)$50,000 $27,510 $0 $10,000 Alley Planning $25,000 $9,841 $10,000 $0 Utility Infrastructure Improvement Planning $50,000 $13,200 $50,000 $50,000 Wayfinding Plan Development $35,000 $10,000 $10,000 Bozeman Creek Planning $20,000 $15,617 $10,000 $50,000Alternative Transportation Planning $10,000 $25,000 $25,000 Downtown Streetscape Design Standards $10,000 $10,000 $0 Side-Streetscape Preliminary Engineering $25,000 $50,000 $50,000 Parklet Planning/Program $10,000 $20,000 $20,000 DBIP General Implementation $50,000 $50,000 $50,000 Professional Services Term Contract $75,000 $45 $75,000 $75,000 Code Amendments $0 $0 $0 Downtown Infrastructure & Public Realm Plan $0 $0 $0 Technical Assistance Grant Program $50,000 $50,000 $50,000 $50,000 Parking - Designated Funds Parking Supply, Management Planning, and Data Collection $4,770,000 $25,000 $20,000 $5,000,000 Total Planning/Parking $5,180,000 $141,213 $380,000 $5,390,000 Parking Structure Garage Bond Payment $335,000 $335,000 $335,000 $335,001 Total Parking Garage Payments $335,000 $335,000 $335,000 $335,001 Total Expenses $7,612,100 $773,313 $1,230,300 $8,040,301 Balance $871,500 $7,710,287 $2,299,200 $2,327,986 DURD FY25 DRAFT Budget 26 Memorandum REPORT TO:Downtown Area Urban Renewal District Board FROM:Ellie Staley, Executive Director SUBJECT:Pedlet Pilot Program Review MEETING DATE:March 25, 2025 AGENDA ITEM TYPE:Plan/Report/Study RECOMMENDATION:Discussion. STRATEGIC PLAN:4.4 Vibrant Downtown, Districts & Centers: Promote a healthy, vibrant Downtown, Midtown, and other commercial districts and neighborhood centers – including higher densities and intensification of use in these key areas. BACKGROUND: After the idea of a "parklet" was included in the 2019 Downtown Improvement plan, more research was needed to see how this may work in our downtown community. The Downtown Urban Renewal District (DURD) next developed a "Parklet & Pedlet Program Assessment Report ” in 2021 to explore ways to enhance pedestrian and café experiences in the downtown area. After extensive research, the "pedlet" model was selected as the most suitable option for Bozeman, particularly for expanding narrow sidewalk spaces on side streets off Main Street. Unlike parklets, which occupy parking spaces and create additional seating, pedlets serve as a pedestrian bypass, allowing restaurants to use the existing sidewalk space for outdoor seating while maintaining ADA-compliant walkways. We have discovered a design and manufacturer that we feel fits within the overall streetscape design in downtown. We also have interest and excitement from the property and business owner to participate in the pilot project. See attached pilot program outline and fiscal details below for more information. UNRESOLVED ISSUES:None. ALTERNATIVES:None. FISCAL EFFECTS:$30,000 is currently allocated in the FY25 DURD Budget for pedlet 27 infrastructure and planning. Currently the pedlet estimates are coming in within the budgeted amount. Future funds for upkeep and storage will be needed for continued support of this program, which is the intent. Attachments: Pedlet Pilot Program DRAFT.pdf Report compiled on: March 12, 2025 28 Pedlet Pilot Program: Downtown Bozeman Background The Downtown Urban Renewal District (DURD) developed a "Parklet & Pedlet Program Assessment Report” in 2021 to explore ways to enhance pedestrian and café experiences in the downtown area. After extensive research, the "pedlet" model was selected as the most suitable option for Bozeman, particularly for expanding narrow sidewalk spaces on side streets off Main Street. Unlike parklets, which occupy parking spaces and create additional seating, pedlets serve as a pedestrian bypass, allowing restaurants to use the existing sidewalk space for outdoor seating while maintaining ADA-compliant walkways. Pilot Program Overview The pilot program will be initiated with Bitterroot Bistro, which has agreed to formalize an Exclusive Use Permit for a Sidewalk Café through the City of Bozeman. This pilot will serve as a model for future pedlet implementations in the downtown area. Goals & Benefits • Expand outdoor dining opportunities for restaurants with limited sidewalk space. • Maintain ADA compliance by shifting pedestrian pathways to the pedlet structure. • Support local businesses by allowing the extension of state liquor licenses into the designated pedlet area. • Enhance the vibrancy of downtown Bozeman with attractive, functional outdoor seating. • Efficiently use existing public spaces while ensuring pedestrian accessibility and safety. Design & Implementation The proposed pedlet design is inspired by the Great Falls, MT program, which was adopted in 2019. The pedlet structure will be sourced from MODstreet, a Colorado-based manufacturer specializing Figure 1: Great Falls Pedlet Program Graphic 29 in high-quality pedlets. A sample rendering from a current project can be found HERE, illustrating a pedestrian bypass structure with seating space along the storefront. The City Transportation Department has been actively involved in planning and ensuring the feasibility of the project. The DURD will manage the Encroachment Permit for the seasonal leasing of two parking spaces needed for the pedlet. Budget & Costs • Pedlet Infrastructure Cost (MODstreet estimate): ~$25,000 (design phase ongoing) • Parking Space Lease Cost (5-month seasonal lease-2 spaces, May-Sept): ~$1,200 (based on current construction walkway fees) • DURD Budget Allocation (FY25): $30,000 allocated for purchase, with minimal expenses projected for installation and storage in FY26 Next Steps 1. Formalization of Permits o Bitterroot Bistro to submit an Exclusive Use Permit for a Sidewalk Café through the City of Bozeman and submit approved permit to the Montana Department of Revenue for liquor license extension into café. o DURD to secure an Encroachment Permit for the pedlet structure and lease the necessary parking spaces. 2. Final Design and Ordering o MODstreet to finalize pedlet design and production. o Coordination with City Transportation and Community Development Departments to ensure compliance with regulations and accessibility requirements. 3. Installation & Monitoring o Installation scheduled for May/June 2025. o Monitoring effectiveness and community reception throughout the summer season. Conclusion The Pedlet Pilot Program represents an innovative step toward enhancing downtown Bozeman’s walkability and outdoor dining culture to our under-represented side street eateries. If successful, the program may be expanded to additional locations, offering long-term benefits to businesses, residents, and visitors alike. For further details on relevant permits, visit: Bozeman Development Center Permits. 30