Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
4 C002G CONSTRUCTION MANAGEMENT PLAN SITE PLAN PACKAGE 'G'
oh oh UPBUILDING #23APARTMENTTYPE A3,895 SFFFE = 4857.10BUILDING #22APARTMENTTYPE C8,234 SFFFE = 4857.00BUILDING #21APARTMENTTYPE C8,234 SFFFE = 4854.60CCCCCCCCCCCCCC C C C C S89° 58' 35"W 398.25'L=33.97, R=195.00 D=9°58'48"N89° 58' 35"E 382.39'L=77.93,R=195.00D=22°53'50" S0° 05' 02"E 195.73'N89° 54' 58"E 222.02'S0° 05' 02"E 78.53'S89° 54' 58"W 145.00'N00° 05' 02"W 30.00'N00° 05' 02"W 193.47'N00° 05' 02"W 78.53'N89° 58' 35"E 382.39'ABCDABCD1234512345COPYRIGHT GGLO. ALL RIGHTS RESERVED.ORIGINAL SHEET SIZE IS 24"x36"SHEET NO.SHEET TITLEGGLO PROJECT MANAGER:GGLO PRINCIPAL IN CHARGE:PROJECT NO.:OWNER APPROVAL:MARKDATEDESCRIPTIONISSUE INFORMATIONPROJECT:OWNER:PROJECT ADDRESS:OXBOW APARTMENTS4650 W GARFIELD STBOZEMAN, MT 59718OXBOW APARTMENTSPHASE IIOXBOW LAND HOLDING LLC3112 LOS FELIZ BOULEVARDBOISE, ID 847032023075®REVISIONSA10.18.2024FORMAL SITE DEVELOPMENTREVIEWMARKDATEDESCRIPTIONC002GCONSTRUCTIONMANAGEMENT PLANSITE PLAN PACKAGE 'G'03060120SCALE: 1" = 60'NORTH1C002GCONSTRUCTION MANAGEMENT PLANNORTH2C002GCONSTRUCTION ROUTE PLANPROJECTLOCATION0250500SCALE: 1" = 250'CONSTRUCTION ROUTEFOR LOCAL HARDWAREHIGHWAY 191 TO SERVE AS THEPRIMARY CONSTRUCTION ROUTEFOR MAJOR BUILDING SUPPLIESAND EQUIPMENT FROMBELGRADE/JACKRABBIT AREA40 YD ROLL OFFDUMPSTERSPOILS PILE TO BE REMOVED PRIORTO PROJECT COMPLETIONMATERIALSSTAGING