Loading...
HomeMy WebLinkAbout23 L542 IRRIGATION DETAILS1234567891011121312345678910111213A-FRONT VIEW(IRRIGATION CONTROLS)B-SIDE VIEWC-REAR VIEW(POWER METER)STRONG BOX MODEL #SB-24SS/120V STAINLESS STEEL 2SIDED METERED ENCLOSURE (UL LISTED, NEMA TYPE 3R RATED).#CH751 RAIN BIRD KEY CORE ON IRRIGATION CONTROL SIDE.32"x32"x14" POURED IN PLACE CONCRETE BASE WITH 1"CHAMFERED EDGES.FINISH GRADE TO BE 1", OR SPECIFIED DEPTH OF MULCHPLUS 1", BELOW TOP OF CONCRETE BASE, TYP.COMPACTED NATIVE SOIL.5/8" MINUS CRUSHED AGGREGATECOMPACTED TO 95% DENSITY.CONDUIT AND WIRE FROM POWER SOURCE FOR LINE FEEDINTO METER SOCKET.2" CONDUIT FOR VALVE AND FLOW SENSOR WIRE FEED INTOIRRIGATION CONTROL PANEL.DIRECT BURIAL VALVE AND FLOW SENSOR WIRES.IRRIGATION CONTROL PANELLOOP AND ZIP TIED VALVE AND FLOW SENSOR WIRES. PROVIDEA MIN. 48" OF SLACK COILED WITHIN CABINET.PAD LOCK TO BE PLACED BY UTILITY PROVIDER AFTERMETER HAS BEEN INSTALLED AND CHARGED.CONTRACTOR SHALL PROVIDE ALL CONDUIT, WIRES, POLEMOUNTING BRACKETS, WEATHERHEADS AND ALL OTHER MISC.EQUIPMENT REQUIRED FOR UTILITY PROVIDER TOCONNECT CABINET TO POWER SOURCE AND CHARGE METER.CA10FINISH GRADE/TOP OF MULCHVALVE BOX W/ COVERPVC SCHEDULE 40 TEEPVC LATERAL PIPEFILTERED AUTOMATIC DRAIN VALVE(2) BRICK SUPPORTS3/4" DIA WASHED GRAVELMIN2"MIN6"NOTE: DRAIN VALVE TO BE LOCATED AT LOWEST POINT OF ZONE.BRASS PIPEFROM DCVAASSEMBLYBRASSELBOWSCH 80 PVCTOE NIPPLESCH 80 PVCSxS ELBOWSCH 80 PVCSCH 80 PVC SxS UNION(BOTH SIDES), TO LOOSENOUTWARD AWAY FROM VALVESCH 80 PVC TOE NIPPLE(BOTH SIDES)MASTER VALVELOOPED AND ZIP TIED 14 GA. INSULATED COMMON AND LEAD WIRES -PLACE ALL SPLICES IN DBY -PROVIDE 48" COILED SLACK WITHIN VALVE BOXCOMPACT NATIVE SOIL(8) PAVING BRICKS AT CORNERSSCH 80 PVCFLOW SENSORCABLE TO CONTROLLER RUN CONTINUOUS FROM SENSOR TO CONTROLLER LOOPED AND ZIP TIED PROVIDE 48" COILDED SLACK WITHIN VALVE BOXSCH 80 PVCSCH 80 PVCSxS BUSHINGSCH 40 PVCSxS ELBOWSCH 40 PVCSCH 40 PVCSxS ELBOWSCH 40 PVC TO CONTROLVALVES OR QUICK COUPLERSSEAL ALLPENETRATIONSFINISH GRADE TO BE 1", OR SPECIFIED DEPTH OF MULCH PLUS 1", BELOW TOP OF VALVE BOX, TYP.JUMBO VALVE BOX(S) WITH BOLT DOWN LID DOUBLE STACK BOXES AS NECESSARY36" MAX24" MIN12" MIN36" MAX24" MIN4"-6" DEPTH 3/8" GRAVEL BACKFILL FOR DRAINS OVER GEOTEXTILE FABRIC10x PIPE I.D. MIN5x PIPE I.D. MINSUPER JUMBO VALVE BOX WITHBOLT DOWN T LID REVERSE STACKED AND SECURED TOGETHER WITH SCREWSBRASS NIPPLE,LENGTH AS REQUIREDBRASS 9012" BRASS NIPPLE,TYP.DOUBLE CHECK BACKFLOW PREVENTER W/ BUILT IN UNIONSBRASS 90SEAL ALL PENETRATIONSCOMPACT NATIVEMATERIALCURB VALVE, SEE ______4" DEPTH 5/8" CRUSHED AGGREGATE COMPACTED TO 95% DENSITY OVER GEOTEXTILE FABRICFINISH GRADE TO BE 1", ORSPECIFIED DEPTH OF MULCH PLUS1", BELOW TOP OF VALVE BOX, TYP.FERTILIZER INJECTOREZ FLOW FERTILIZER TANK, EZ 001-CX MODEL, 1.5 GAL FOR UP TO 6,000 SFVALVE BOX MINIMUM DIMENSIONS 17" X L X 12" W X 12" HWATER FLOW OUT TO HEADSBALL VALVE COUPLING CONNECTIONCONTROL VALVE, SEE _ _ _ _MAINLINEPAVING BRICKS @ CORNERS4"-6" DEPTH 3/8" GRAVEL BACKFILL FOR DRAINS OVER GEOTEXTILE FABRICLATERAL LINELOOPED AND ZIP TIED 14 GA. COMMON (WHITE), LEAD (BLACK) AND SPARE WIRES (ORANGE) PLACE ALL SPLICES IN DBY SPLICE KIT -PROVIDE A MIN. 48" OF SLACK COILED WITHIN BOXTANK CAP WITH FEED ADJUSTMENT KNOBSHUT OFF VALVESTAARC-LAR-LIC-8876EOFTOMNNAT A MARKSINDELLNo.LANDSCAPEARCHITECTABCDABCD1234512345COPYRIGHT GGLO. ALL RIGHTS RESERVED.ORIGINAL SHEET SIZE IS 24"x36"SHEET NO.SHEET TITLEGGLO PROJECT MANAGER:GGLO PRINCIPAL IN CHARGE:PROJECT NO.:OWNER APPROVAL:MARKDATEDESCRIPTIONISSUE INFORMATIONREVISIONSPROJECT:OWNER:PROJECT ADDRESS:PLOT DATE/TIME:A10.18.2024FORMAL SITE DEVELOPMENT REVIEWAPPROVAL STAMPS10/17/2024 6:52:20 PMBurton YuenMark Sindell2023075OXBOW APARTMENTS4650 W GARFIELD STBOZEMAN, MT 59718L-542IRRIGATION DETAILSOXBOW APARTMENTSPHASE IIPERMIT SET DRAFT -NOT FOR CONSTRUCTIONOXBOW LAND HOLDINGS LLC3112 LOS FELIZ BOULEVARDBOISE, ID 837021/2" = 1'-0"B22 SIDED IRRIG. CONTROL PEDESTAL WITH COMMERCIAL POWER METER SOCKET1 1/2" = 1'-0"A1AUTOMATIC DRAIN VALVE3/4" = 1'-0"B4COMBINED MASTER VALVE & FLOW SENSOR ASSEMBLY1" = 1'-0"A4DOUBLE CHECK VALVE ASSEMBLY IN VALVE BOX1" = 1'-0"A2FERTILIZER INJECTORMARKDATEDESCRIPTION