HomeMy WebLinkAbout021 Sanitary Sewer ReportSANITARY SEWER REPORT
The Cottonwood Apartments – BLOCK 1, LOTS 1 & 2
The Cottonwood Apartments – Phase 2, Bozeman, Montana 59718
Block 1 – Lots 1 and 2, Cottonwood Subdivision (Site Plan Packages F
& G)
Prepared For:
Roundhouse
Attn: Patrick Boel
Director of Development & Construction
1100 West Idaho Street, Ste 630
Boise, ID 83702
Prepared By:
Cushing Terrell
411 E. Main Street, Ste. 101
Bozeman, MT 59715
www.cushingterrell.com
Cushing Terrell Project No. Cottonwood_P2
December 18, 2024
Adam Schlegel, PE
Sanitary Sewer Report
The Cottonwood Apartments – Block 1, Lots 1 & 2 and Block 2, Lot 1
Project No.
Cottonwood_P1
cushingterrell.com i
TABLE OF CONTENTS
1.0 INTRODUCTION ................................................................................................................................................. 1
1.1 Zoning ............................................................................................................................................................... 3
1.2 Existing Ground Cover and Vegetation ................................................................................................ 3
1.3 Topographic Features, and Slopes ......................................................................................................... 4
1.4 FEMA Floodplain Classification................................................................................................................ 4
1.5 Wetlands .......................................................................................................................................................... 4
1.6 Geologic Features and Geotechnical Data .......................................................................................... 4
2.0 SANITARY SEWER DESIGN ............................................................................................................................. 4
2.1 Pipe Capacity Analysis – 8” Sanitary Sewer Main Extension ......................................................... 4
2.2 Flow Analysis .................................................................................................................................................. 5
3.0 CONCLUSION ..................................................................................................................................................... 6
LIST OF FIGURES
Figure 1.1: Overall Location Map .............................................................................................................................. 2
Figure 1.2: Project Map ................................................................................................................................................ 3
LIST OF TABLES
Table 2.1: SS Main Extension Flows ........................................................................................................................ 5
Table 2.2: Package E Flows ......................................................................................................................................... 5
APPENDICES
Appendix A: Geotechnical Report Excerpts
Appendix B: Cottonwood Subdivision Sanitary Sewer Report Excerpts
Appendix C: Cottonwood Phase 1 Sanitary Sewer Report
Appendix D: Loyal Garden Lift Station Analysis Excerpts
Appendix E: Calculations and Back-Up Data
Sanitary Sewer Report
The Cottonwood Apartments – Block 1, Lots 1 & 2 and Block 2, Lot 1
Project No.
Cottonwood_P1
cushingterrell.com 1
1.0 INTRODUCTION
Roundhouse Development Group proposes a multifamily housing development on Lots 1 and 2
of Block 1 and Lot 1 of Block 2 of the Cottonwood Subdivision, Phase 2, generally located east
of Cottonwood Road and south of Huffine Lane. The housing development will utilize the
previously approved and installed public water and sewer utilities (EQ#20-1840). Additionally,
the housing development will utilize the existing subdivision stormwater detention facilities and
connect to the existing stormwater infrastructure in Stafford Avenue and along the north side of
the property boundary. The development has been separated into three different site plan
packages (E, F, and G). Site plan package E covers Lot 1, Block 2. Package F covers Lot 1, Block 1.
Package G covers Lot 2, Block 1. The following figures show the boundaries of the different site
plan packages and project location.
The intent and purpose of this report is to request a public sewer main extension to service
Building #19 - #23 within in Block 1, as it is not practical to service the buildings from the
adjacent streets with traditional services. Additionally, the report will provide an update to
overall wastewater flows for the subdivision to account for the actual proposed development.
This report will reference the previously approved subdivision engineering reports prepared by
Madison Engineering titled “WASTEWATER SYSTEM DESIGN REPORT FOR: COTTONWOOD
SUBDIVISION BOZEMAN, MT” dated March 2020 and by Cushing Terrell titled “SANITARY SEWER
REPORT The Cottonwood Apartments – Block 3, Lots 1 & 2” dated December 23, 2020. See
Appendix B and C for original report excerpts.
It is important to note that buildings 15 and 18 within Package E will be served by existing
sanitary sewer stubs from Stafford Ave. Buildings 16 and 17 within Package E will not contain
water/wastewater facilities.
The following references were used in the design of the sanitary sewer main extension.
• EQ# 20 -1840
• Wastewater System Design Report – For: Cottonwood Subdivision, Bozeman, MT.
Prepared by: Madison Engineering. Dated: March 2020. See Appendix B.
• Sanitary Sewer Report The Cottonwood Apartments – Block 3, Lots 1 & 2” dated
December 23, 2020. See Appendix C.
• Loyal Garden Lift Station Analysis Report – For: Cottonwood Subdivision, Bozeman, MT.
Prepared by: Madison Engineering. Dated: March 2020. See Appendix D.
• COB Design Standards and Specifications Policy, 2004. Addendum #6 (DSSP)
• COB Modifications to Montana Public Works Standard Specifications (MPWSS),
Addendum #3
• City adopted MPWSS and Adopted Addenda
• COB Wastewater Facility Plan, 2015
• WQB Circular No. 2
• City of Bozeman Zoning Map
Sanitary Sewer Report
The Cottonwood Apartments – Block 1, Lots 1 & 2 and Block 2, Lot 1
Project No.
Cottonwood_P1
cushingterrell.com 2
Figure 1.1: Overall Location Map
Sanitary Sewer Report
The Cottonwood Apartments – Block 1, Lots 1 & 2 and Block 2, Lot 1
Project No.
Cottonwood_P1
cushingterrell.com 3
Figure 1.2: Project Map
1.1 Zoning
The subject properties are zoned R5: Residential Mixed-Use High-Density District. This zoning
matches the zoning assumed in the original engineering report.
1.2 Existing Ground Cover and Vegetation
The subject properties are serviced by the existing subdivision streets and City utilities (water,
sewer, and storm). Internal lot areas are stripped of topsoil and have various stockpile locations
as a result of the construction of the off-site infrastructure.
Sanitary Sewer Report
The Cottonwood Apartments – Block 1, Lots 1 & 2 and Block 2, Lot 1
Project No.
Cottonwood_P1
cushingterrell.com 4
1.3 Topographic Features, and Slopes
Blocks 1 & 2 slope from the east to the west towards S Cottonwood. Significant topographic
features on site include stockpiles reaching heights of 15’ as a result of construction during phase
1 of this development. Stockpiles and excess dirt in these lots will be removed during the
construction of phase 2.
1.4 FEMA Floodplain Classification
Per FEMA FIRM Panel #30031C0811D, there are no FEMA determined floodplains on or near the
subject property.
1.5 Wetlands
Wetlands were previously located within the subdivision but have since been mitigated as part
of the subdivision infrastructure work (Corps No. NWO-2017-02234-MTH, Type: NWP 29).
1.6 Geologic Features and Geotechnical Data
See Appendix A for the geotechnical investigation excerpts from the report prepared by Allied
Engineering Services, Inc. titled, “Cottonwood Subdivision Southeast Side of Huffine Ln/Cottonwood
Rd Bozeman MT” dated January 2019. The full report can be provided upon request.
1.6.1 Soils
Overall, the report indicates the soils in the area consist of topsoil in the upper ten inches,
underlain by eight inches of native silt/clay, underlain by approximately ten feet of a native
sandy gravel. Borehole logs and an excerpt on subsurface conditions are located in Appendix
A.
1.6.2 Groundwater
The report does indicate the presence of groundwater in the project area. The borehole logs
indicate varying levels throughout the site from 3.7’ to 5.1’ below the ground surface. See
Appendix A for excerpts.
2.0 SANITARY SEWER DESIGN
2.1 Pipe Capacity Analysis – 8” Sanitary Sewer Main Extension
The proposed 371 linear foot 8” main extension will slope to the south with an approximate
slope of 0.4% and connect to an existing stub that extends north from the W Garfield Street 8”
main. Assuming a 0.4% slope, 8” diameter pipe, roughness coefficient of 0.013, and 75% full flow
capacity the proposed extension will have an approximate capacity of 0.70 cfs or 316 gpm. The
proposed main extension has adequate capacity to convey the proposed peak hour flow of 0.08
cfs.
Sanitary Sewer Report
The Cottonwood Apartments – Block 1, Lots 1 & 2 and Block 2, Lot 1
Project No.
Cottonwood_P1
cushingterrell.com 5
2.2 Flow Analysis
The following table indicates the expected flows required to be conveyed by the proposed
extension. The total approximate average daily flow required to be conveyed by the extension is
13,416 GPD (9.32 gpm or 0.16 cfs).
Table 2.1: SS Main Extension Flows
Table 2.2: Package E Flows
The City approved Loyal Garden Lift Station Analysis Report prepared for Cottonwood
Subdivision indicated approximately 76,778 gpd was available for use by the Cottonwood
Subdivision. Additionally, the report estimated an average daily flow of 55,900 gpd for the
Cottonwood Subdivision (400 units at full build) and excess lift station capacity of 20,878 gpd to
be utilized on a first come, first serve basis. Roundhouse has paid for the additional capacity
available.
CONTRIBUTING BUILDINGS # OF UNITS
DENSITY
(PERSONS
/UNIT)
POPULATION
(PERSONS)
AVG. DAILY
UNIT FLOW
RATE (GPD
PER CAPITA)
ADF
(GPD)
1BUILDING #19 - TYPE C 24 2.17 52 64.4 3,354
1BUILDING #20 - TYPE A 12 2.17 26 64.4 1,677
1BUILDING #21 - TYPE C 24 2.17 52 64.4 3,354
1BUILDING #22 - TYPE A 12 2.17 26 64.4 1,677
1BUILDING #23 - TYPE C 24 2.17 52 64.4 3,354
96 208 TOTAL ADF =13,416
COTTONWOOD APARTMENTS | SANITARY SEWER USAGE - SITE PLAN PACKAGES F & G
1AVERAGE DAILY FLOW IS BASED ON THE UNIT DEMAND OF 64.4 GAL./PERSON/DAY AND 2.17 PERSONS PER
HOUSEHOLD. THIS INFORMATION IS PROVIDED ON PAGE OF 2015 WASTEWATER COLLECTION FACILITIES PLAN
UPDATE.
CONTRIBUTING BUILDINGS # OF UNITS
DENSITY
(PERSONS
/UNIT)
POPULATION
(PERSONS)
AVG. DAILY
UNIT FLOW
RATE (GPD
PER CAPITA)
ADF
(GPD)
1BUILDING #15 - TYPE C 12 2.17 26 64.4 1,677
1BUILDING #18 - TYPE A 24 2.17 52 64.4 3,354
36 78 TOTAL ADF =5,031
COTTONWOOD APARTMENTS | SANITARY SEWER USAGE - SITE PLAN PACKAGE E
1AVERAGE DAILY FLOW IS BASED ON THE UNIT DEMAND OF 64.4 GAL./PERSON/DAY AND 2.17 PERSONS PER
Sanitary Sewer Report
The Cottonwood Apartments – Block 1, Lots 1 & 2 and Block 2, Lot 1
Project No.
Cottonwood_P1
cushingterrell.com 6
3.0 CONCLUSION
To conclude this report, updated estimated subdivision wastewater flows are provided below.
The proposed sanitary sewer main extension has adequate capacity to convey the proposed
flows from Block 1 – Lots 1 and 2. Additionally, the downstream 0.4% sloped 8” sanitary sewer
mains have adequate capacity to carry flows from this extension as well as from the additional
flows from site plan E. See Appendix E for calculations.
Cottonwood Sub - Average Day Flow =13,416 GPD (SS Main Extension in package F & G)
+ 5,031 GPD (Flows from site plan E) + 36,376 (Total ADF from Phase 1) = 54,823 GPD or
0.08 cfs
• Note: Previous estimate showed 55,900 GPD.
Peaking Factor = 3.87. See Appendix D for calculation.
Cottonwood Sub - Peak Hour Flow = 3.87 * 54,823 GPD + 150 gal/day/acre * 28.09 acres
(4,214 GPD) = 216,379 GPD or 0.33 cfs.
• Note: Previous estimate showed 218,870 GPD or 0.34 cfs.
cushingterrell.com
Appendix A: Geotechnical Report Excerpts
Cottonwood Subdivision
Huffine Lane / Cottonwood Road – Bozeman, MT
Project: 17-170
January 9, 2019
Allied Engineering Services, Inc. Page 6
Soil Conditions
The site can simply be characterized as being underlain by good, dense, clean sandy gravel beginning at
depths of 1.5 to 2.5 feet across the entire property. The gravels in this part of Bozeman are expected to
extend at least 100 feet deep and were confirmed to the 50-foot depth during the borehole drilling that
was conducted at the Bozeman Health Ambulatory Care Facility. The presence of the shallow gravel is
not surprising and has been pretty consistent in the other nearby areas we have recently investigated,
including the Town Pump site to the north, the Bozeman Health ACF to the northwest, and the
Cottonwood Road corridor to the north of Huffine Lane. Based on the eight test pits, the gravels have a
“clean” and sandy composition and are relatively small in size. Most of the gravel is a 3” to 4”-minus
material, but it does contain scattered cobbles up to 6 to 8 inches. The gravels were uniform through-
out the 10 to 11-foot test pit depths. See Figure 4 for the distribution of gravel depth across the site.
No random/foreign surface fill material was found in any of the test pits. All soils were native and in-
place. The site is blanketed by 9 to 12 inches of organic topsoil. Underlying the topsoil and overlying
the sandy gravel is a thin, intermediate layer of silt/clay. In most locations, the silt/clay was stiff to very
stiff and the lowermost 0.5-foot of the silt/clay contained some scattered small gravels (as the interface
with the alluvial sandy gravel was neared). Really, the only anomalies were found in TP-7, which was
located on the south side of the site. At this location, the same soil stratigraphy is present, but the
topsoil was more gravelly and the silt/clay was not only more gravelly, but very moist and much less
stiff. Provided in Table 3 is a summary of the soil conditions that were observed in the eight test pits.
The material descriptions and soil depths in the table match the data shown on the logs.
Table 3. Summary of Soil Conditions in Test Pits 1 - 8
TP # TP LOCATION NATIVE
TOPSOIL
NATIVE
SILT/CLAY
NATIVE
SANDY GRAVEL
1 N1/2 of Site, NW Corner 0.0’ - 1.0’ 1.0’ - 1.7’ 1.7’ - 10.0’
2 N1/2 of Site, NE Corner 0.0’ - 0.8’ 0.8’ - 2.0’ 2.0’ - 11.0’
3 N1/2 of Site, Center 0.0’ - 0.8’ 0.8’ - 1.8’ 1.8’ - 11.0’
4 Middle of Site, Center 0.0’ - 0.8’ 0.8’ - 1.5’ 1.5’ - 11.0’
5 Middle of Site, East Side 0.0’ - 0.8’ 0.8’ - 2.2’ 2.2’ - 11.0’
6 S1/2 of Site, SE Corner 0.0’ - 1.0’ 1.0’ - 2.3’ 2.3’ - 10.0’
7 S1/2 of Site, South Side 0.0’ - 1.0’ 1.0’ - 2.0’ 2.0’ - 10.0’
8 S1/2 of Site, West Side 0.0’ - 0.8’ 0.8’ - 2.2’ 2.2’ - 10.0’
Notes: 1) All soil measurements are depths below existing ground. 2) The native silt/clay is an unsuitable bearing material and shall be removed from under all footing locations.
3) The “target” bearing material for all foundation elements is the dense, native sandy gravel starting at 1.5’ to 2.5’.
4) Generally, the lower 0.5-foot of silt/clay (in all test pits) contained some scattered, small gravels. 5) In TP-7, the silt/clay was more gravelly, more moist, and less stiff (as compared to the other seven pits).
6) PVC monitoring wells were installed in TP-1 through TP-8 for future groundwater monitoring purposes.
Cottonwood Subdivision
Huffine Lane / Cottonwood Road – Bozeman, MT
Project: 17-170
January 9, 2019
Allied Engineering Services, Inc. Page 7
Provided below is a general description of the soil conditions encountered in the test pits. Following
each soil description is a statement regarding foundation bearing potential for the particular soil type.
• Native Topsoil: Generally consists of moist; medium stiff; black to dark brown; organic clayey
SILT with abundant roots.
The native topsoil is an unsuitable foundation bearing material that must be removed
from under all footings. In addition, all organic topsoil must be stripped/removed from
building footprints, utility trench locations, and under exterior slabs and asphalt areas.
• Native Silt/Clay: Generally consists of moist; stiff to very stiff; brown to orangish brown; sandy
SILT to sandy lean CLAY. The lower six inches (+/-) of silt/clay directly above the underlying
sandy gravel contains some scattered gravels. This transitional zone does not constitute clean
sandy gravel. In most pits, the silt/clay was on the dry side (due to relatively deep groundwater)
and consequently these soils were in a stiff to very stiff condition. Really the only exception was
in TP-7, which is located on the south side of the property and closest to the Farmers Canal. At
this location, the silt/clay was very moist and hence less stiff (ie. little softer than other areas).
The native silt/clay is an unsuitable foundation bearing material that must be removed
from under all footings.
• Native Sandy Gravel: Generally consists of slightly moist to wet; dense; brown; clean sandy
GRAVEL with abundant 3” to 4”-minus gravels and scattered 6” to 8”-minus cobbles. The on-site
gravel is a very good reserve of high-quality, sandy pitrun gravel and can be re-used as granular
structural fill under buildings or as sub-base gravel under asphalt areas.
The native, clean sandy gravel is the “target” foundation bearing material for all footings,
including perimeter, interior, and exterior footings.
Groundwater Conditions
During our test pits in January, groundwater was encountered at depths of 7.0 to 9.0 feet in the north,
central, and eastern parts of the site. Two pits (TP-7 and TP-8) were dug in the southwest portion of the
property where the surface terrain appeared to be a little lower. In both of these pits, the groundwater
table was shallower and found at 5.0 feet. The depth of the water relative to the top of the native sandy
gravel was generally 5.0 to 7.0 feet below the gravel in most areas, but decreased to 2.8 to 3.0 feet in
the southwest corner. See Figure 5 for the distribution of groundwater depth across the site.
Provided in Table 4 (on the following page) is a summary of the groundwater measurements in each of
the test pits, along with its positon relative to the top of the sandy gravel. As stated previously, all test
pits were backfilled with PVC monitoring wells. The approximate casing height of each well is also listed
in the table.
DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, OMAHA DISTRICT HELENA REGULATORY OFFICE 10 WEST 15TH STREET, SUITE 2200 HELENA, MONTANA 59626 REPLY TO ATTENTION OF
Printed on Recycled Paper
January 19, 2018 Regulatory Branch
Montana State Program Corps No. NWO-2017-02234-MTH
Subject: TKO Enterprises (Vaughn Environmental Services) - Cottonwood Subdivision - Farmer's Canal - (Gallatin County)
Tyson Olsen TKO Enterprises Po Box 10303 Bozeman, Montana 59719 Dear Mr. Olsen: We are responding to your request for Nationwide Permit (NWP) verification for the above-mentioned project. The project is located at Latitude 45.665522°, Longitude -111.101588°, on or near Farmers Canal, within Section 15, Township 2 S, Range 5 E, Gallatin County, Montana.
Specifically, you requested authorization for the following work in waters of the U.S.:
Work Item Description
a.
Approximately 1,095 cubic yards (cy3) of native fill, 361 cy3 of 6-inch minus of uncrushed subbase course, 123 cy3 of 1.5-inch crushed gravel and 96 cy3 of
asphalt will be used to fill 0.307 acre of jurisdictional wetland in preparation to develop are for a residential subdivision. In addition, a 30-inch reinforced concrete culvert will be placed across Cottonwood road and will be extended 22 linear feet.
Based on the information you provided, the proposed activity, permanently affecting approximately 0.307 acre of jurisdictional Wetlands, is authorized by NWP 29, found in the
January 6, 2017, Federal Register (82 FR 1860), Reissuance of Nationwide Permits. Enclosed is a fact sheet that fully describes this NWP and lists the General and Regional Conditions that must be adhered to for this authorization to remain valid. Please note that deviations from the
original plans and specifications of your project could require additional authorization from this office.
In addition to conditions referenced above, the following special conditions apply: Condition Description
1.
Compensatory mitigation will be required for the 0.307 acre of unavoidable impacts to the wetlands adjacent to Farmers Canal. It has been determined that a practicable alternative to compensate for the aquatic resource functions that will be lost as a result of the permitted activity is mitigation by a third party provider. You have selected the Upper Missouri Mitigation Bank (SRI Missouri Headwaters,
-2-
Printed on Recycled Paper
LLC and Eco-Asset Management, LLC) as the party or parties responsible for the implementation, performance, and long-term management of the compensatory
mitigation project (332.3[l][1]) and so the following specific provisions apply: 1. Credits must be secured from a third party provider authorized by the U.S. Army Corps of Engineers to provide the mitigation;
2. Credits must come from the same service area as the permitted impacts, as specified in the authorized third party provider’s mitigation strategy or executed Banking Agreement; and The applicant must use the authorized third party provider’s credit multipliers in determining the amount of credits to be purchased (for Upper Missouri Mitigation Bank the multipliers are the same as for the Omaha District) namely (i) released credits are secured on a 1:1 ratio (1 impact debit to 1 mitigation credit), and (ii) after-the-fact credits are secured on a 1:1.5 ratio. In this case 0.307 acres of wetland mitigation credits will be required prior to working in Waters of the U.S., provide this office with documentation of completion of the transaction for securing credits. This can be a letter from the third party provider stating its acceptance of
responsibility for the specified mitigation.
You are responsible for ensuring that all work is performed in accordance with the terms and conditions of the NWP. If a contractor or other authorized representative will be conducting work on your behalf it is strongly recommended that they be provided a copy of this letter and the enclosed conditions. Failure to comply with the General and Regional Conditions of this NWP, or the project-specific special conditions of this authorization, may result in the suspension or revocation of your authorization and may be subject to appropriate enforcement action. The Montana Department of Environmental Quality has provided the enclosed CWA
Section 401 water quality certification for this NWP which includes General Conditions, all of which must be complied with for that certification to remain valid. This does not eliminate the need to obtain other permits that may be required by that agency. This verification is valid until March 18, 2022, when the existing NWPs are scheduled to be modified, reissued, or revoked. Furthermore, if you commence or are under contract to
commence this activity before the date that the relevant NWP is modified, reissued or revoked, you will have twelve (12) months from the date of the modification, reissuance or revocation of the NWP to complete the activity under the present terms and conditions unless discretionary authority has been exercised on a case-by-case basis to modify, suspend, or revoke the authorization in accordance with 33 CFR 330.4(e) and 33 CFR 330.5 (c) or (d). Project specific special conditions listed in this letter continue to remain in effect after the NWP verification expires, unless the district engineer removes those conditions. Activities completed under the authorization of an NWP which was in effect at the time the activity was completed continue to
be authorized by that NWP. In compliance with General Condition 30, we have enclosed a "compliance certification"
form, which must be signed and returned within 30 days of completion of the project, including
-3-
Printed on Recycled Paper
any required mitigation. Your signature on this form certifies that you have completed the work in accordance with the terms and conditions of the NWP. The Omaha District, Regulatory Branch is committed to providing quality and timely service to our customers. In an effort to improve customer service, please take a moment to complete our Customer Service Survey found on our website at: http://corpsmapu.usace.army.mil/cm_apex/f?p=regulatory_survey. If you do not have Internet access, you may call and request a paper copy of the survey that you can complete and return to us by mail or fax.
Please refer to identification number NWO-2017-02234-MTH in any correspondence concerning this project. If you have any questions, please contact Timothy McNew at Helena
Regulatory Office 10 West 15 Street, Suite 2200 Helena, Montana 59626, by email at
Timothy.M.McNew@usace.army.mil, or telephone at (406) 441-1375.
Sincerely, Todd N. Tillinger P.E. Montana Program Manager Enclosures: Compliance Certification NWP 29 Fact Sheet with Regional Conditions
Montana DEQ CWA Section 401 Water Quality Certification cc:
Barb Vaughn via e-mail: bvaughn@montana.com
-4-
Printed on Recycled Paper
COMPLIANCE CERTIFICATION Corps File Number: NWO-2017-02234-MTH Permit Type: NWP 29
Name of Permittee: Tyson Olsen County: Gallatin County, Montana Date of Issuance: January 18, 2018
Corps Project Manager: Timothy McNew Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US Army Corps of Engineers Omaha District Helena Regulatory Office 10 West 15 Street, Suite 2200 Helena, Montana 59626 Please note that your permitted activity is subject to a compliance inspection by a U.S. Army
Corps of Engineers representative. If you fail to comply with the conditions of this permit, you are subject to permit suspension, modification, or revocation.
- - - - - - - - - - - - - - - - - - - - - - - - - - - I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and conditions of the said permit, and required mitigation was completed in accordance with the permit conditions. _______________________________________ Signature of Permittee
___________________ Date
cushingterrell.com
Appendix B: Cottonwood Subdivision Sanitary Sewer Report Excerpts
Cottonwood Subdivision
Wastewater Design Report
Page 1 of 5
COTTONWOOD SUBDIVISION
WASTEWATER SYSTEM DESIGN REPORT
A. General
This report will give an overview of the proposed wastewater collection system for the
development of the Cottonwood Subdivision, located at the intersection of Cottonwood Road and
Loyal Drive in Bozeman. The 28.09-acre subdivision is zoned R-5 (Residential Mixed-Use High
Density District) and will consist of multi-residential units. The proposed improvements are
anticipated to be phased, with the first phase being constructed in 2021.
Included in this report is a description of the proposed wastewater collection system and design
parameters. Once the wastewater system is constructed and approved, the system will become a
part of the City of Bozeman system. The following references were used in the wastewater
facilities design and capacity analysis:
a. COB Design Standards and Specifications Policy, 2004. Addendum #6 (DSSP)
b. COB Modifications to Montana Public Works Standard Specifications (MPWSS),
Addendum #3
c. City adopted MPWSS and Adopted Addenda
d. COB Wastewater Facility Plan, 2015
e. WQB Circular No. 2
f. City of Bozeman Zoning Map
The procedures and parameters outlined in the COB Design Standards and Specifications Policy
(DSSP) were used in the design of the sewer infrastructure for the proposed development. This
project will require the approval of the City Engineer and the Montana Department of
Environmental Quality (MDEQ).
A.1. Site Conditions
Soil conditions on site consist of a native topsoil to a depth of approximately 12 inches, which is
underlain by a thin, intermediate layer of stiff, silt/clay. Beginning at depths of 1.2 to 2.5 feet is
an alluvial deposit of clean, sandy gravel that underlies much of the Bozeman area at relatively
shallow depths. This clean, sandy gravel extended to the bottom of all 10 to 11 foot test pits.
Groundwater depths on site are, on average, to a depth of 7 to 9 feet in the north, central, and east
sides of the property, but at a shallower 5-foot depth on the south and southwest sides.
Groundwater levels were monitored during the spring and summer of 2018. The highest
groundwater levels were recorded in mid-April and showed shallow water conditions across the
site. Throughout most of the site, the seasonal high-water depths ranged from 3 to 4 feet, but rose
to as high as 1.0 to 2.5 feet below the ground surface in the site’s southwest corner. Water flows
on site in a northwesterly direction. Buoyancy calculations can be found in Appendix 6 of this
report. Although groundwater is highest in the southwestern most area of the site, there are no
manholes proposed in that area and so buoyancy calculations were performed on the southernmost
manhole (SSMH#15). Buoyancy calculations were based on the highest groundwater elevation of
1-foot depth because this is an incredibly conservative estimate for all manholes in the entire site.
Cottonwood Subdivision
Wastewater Design Report
Page 2 of 5
No basements are advised on site. Crawl spaces are only recommended if the depth is limited
below existing site grades, in-filling the crawl space up to the top of footings with a clean crushed
rock layer, and installing subsurface drainage measure. Otherwise, at-grade slabs with perimeter
footings and frost wall are recommended.
The site is in an “Area of Minimal Flood Hazard” per the FEMA Panel 30031C0811D.
A.2. Environmental Impacts
Potential environmental impacts could include affecting the soil, groundwater, waterways, and
wetlands on or off site. Cumulative and secondary impacts have been taken into consideration and
minimized through design and permitting processes. Impacts to the soil, groundwater, and
waterways will be minimized and mitigated through directing all stormwater runoff from on site
into retention and detention basins that will allow any contaminants and sediment to settle before
being discharged.
Wetland impacts on site have been fully permitted.
B. Capacity Analysis
The proposed wastewater system will provide service to Cottonwood Subdivision as well as
16.71 acres of future development to the east. The 16.71 acres to the east is currently in Gallatin
County, so it was assumed that it will be zoned as R-4 (Residential High Density District) when
it is annexed into the City of Bozeman.
The wastewater demand was estimated on a per capita basis for Cottonwood Subdivision and on
a per acre basis for the future 16.71 acres of future development to the east (see Tables 2 & 3).
The City of Bozeman's Design Standards do not specify an average daily flow rate for R-5
zoning, so the flow rates were calculated using the proposed number of units (400 units) and the
updated residential daily flow of 64.4 gal./person/day combined with the value of 2.17 persons
per household. This information is not published in the City Design Standards, but rather found
on page 5 of the 2015 Wastewater Collection Facilities Plan Update (see Appendix 7). It has
been confirmed with the City of Bozeman Engineering Department that these updated figures
should be used for design of sanitary sewers and not the values of 89 gal./person/day and 2.11
person per household published in the design standards.
The Standards specify an average daily flow rate of 1,950 gal/acre/day for R-4 development,
obtained from Table V-1. This value is used to estimate flows from the adjacent 16.71-acre
future development to the east.
Inflow and Infiltration (I&I) were estimated based on the City Standard 150 gallons per acre per
day (see Table 1).
The proposed sewer mains have been sized to flow at no more than 75-percent of full capacity at
peak hour conditions of full build out, and a Manning coefficient of 0.013 was used for PVC
pipe.
Cottonwood Subdivision
Wastewater Design Report
Page 3 of 5
Table 1: I & I Estimates for Cottonwood Subdivision
and future development to the east
Sewer
System
I & I
(gal/acre/day)
Area
(acres)
Total I & I
(gal/day)
Cottonwood
Subdivision 150 28.09 4,214
Future
Development
to the East
150 16.71 2,507
Total 6,721
Table 2: Sanitary Sewer Flow Estimates for Cottonwood Subdivision
Sewer
System
Proposed
no. of
units
Density
(Persons
/unit)
Total
no. of
people
Avg. Daily
Flow Rate
(gpd)
Peaking
factor
Peak Flow
Rate (gpd)
Peak Flow
Rate + I&I
(gpd)
Peak Flow
Rate + I&I
(cfs)
Cottonwood
Subdivision 400 2.17 868 55,900 3.84 214,656 218,870 0.34
Table 3: Sanitary Sewer Flow Estimates for future development to the east
Sewer
System
Wastewater
Loading
(gpd/acre)
Area Served
(acres)
Avg. Daily
Flow Rate
(gpd)
Peaking
Factor
Peak Flow
Rate (gpd)
Peak Flow
Rate + I&I
(gpd)
Peak Flow
Rate + I&I
(cfs)
Future
Development
to the East
1,950
(assumed)
16.71
(assumed) 32,585 4.03 131,318 133,825 0.21
The calculated peaking factors are included in Appendix 5 of this report. The peak flow rate
anticipated from the development was calculated by multiplying the average daily flow rate by the
peaking factor and then adding the I &I. The peak flow rate was then converted from gallons per
day (gpd) to cubic feet per second (cfs). Adding the peak flow rate from Cottonwood Subdivision
of 0.34 cfs to the peak flow rate from the future development to the east of 0.21 cfs yields a design
peak flow rate value of 0.55 cfs.
The sewer main sizes for the all streets will be 8-inch based on minimum required pipe size and
slope. An 8-inch PVC sewer main at 0.40% slope has a capacity of 0.64 cfs at 75% of full flow
capacity, which has adequate capacity for the proposed peak flows. Calculations are provided in
Appendix 1 of this report.
Cottonwood Subdivision
Wastewater Design Report
Page 4 of 5
C. Proposed Collection System
With the extension of local streets within the subdivision, 48-inch manholes (spaced a maximum
of 400-feet apart) with 8-inch sanitary sewer main will be installed to serve the proposed lots. All
8-inch sanitary sewer mains within the subdivision will drain to the west into the existing 15-inch
sanitary sewer main in Cottonwood Road. This 15-inch main in Cottonwood Road drains to the
Loyal Garden lift station. The lift station capacity is discussed in the following section D of this
report.
PVC pipe meeting COB specifications will be used for all sewer mains. The sewer main will
maintain a minimum separation of 10-feet horizontally and 18-inches vertically from any proposed
or existing public water mains.
D. Downstream Capacity Analysis
The sanitary sewer mains were designed in conformance with the City of Bozeman Wastewater
Improvement Plan. Cottonwood Subdivision will be served by the Loyal Garden Subdivision Lift
Station until sewer main improvements are installed in Cottonwood Road per the Facility Plan.
These improvements include a sewer main in Cottonwood Road from the intersection of Durston
Road to approximately 460 feet south of Huffine Lane.
The original Loyal Garden lift station was designed to serve Loyal Garden Subdivision and an
"additional 140 acres" located to the south and to the east of Loyal Garden. The 28.09-acre
Cottonwood Subdivision falls within this “additional 140-acre” area and is therefore intended to
be served by the Loyal Garden lift station. In 2019, the City of Bozeman Engineering Department
decided that the remaining capacity in the Loyal Garden lift station would be allocated on a first-
come first-served basis. A capacity analysis of the lift station was performed by Madison
Engineering during the winter of 2019-2020. As of this writing (March 2020), that report is under
review at the City of Bozeman Engineering Department. The analysis found that adequate capacity
is available in the Loyal Garden lift station to serve the entirety of Cottonwood Subdivision. The
lift station analysis report is included in Appendix 8 of this report.
It should be noted that the 16.71 future development to the east of Cottonwood Subdivision was
only included in the calculations for the Cottonwood Subdivision sanitary sewer design to ensure
adequate capacity of the 8-inch pipes within the subdivision. This 16.71-acre area was not included
in the lift station capacity analysis. If ever developed, the 16.71-acre area to the east will be
required to determine the remaining capacity of the lift station and if capacity does not exist, then
be required to install the sanitary sewer upgrade in Cottonwood Road from intersection of Durston
Road to approximately 460 feet south of Huffine Lane.
LOYAL DRIVE COTTONWOOD RD HUFFINE LANETOWN PUMPLOYALGARDENSUBDIVISIONW GARFIELD STALPHA DRIVECOTTONWOOD SUBDIVISION28.09 ACRESCOUNTY16.71 ACRES1 inch =0SCALE300 feet600'150'300'SS1.0MADISON ENGINEERING895 TECHNOLOGY BLVD, BOZEMAN, MT 59718PHONE (406) 586-0262COTTONWOOD SUBDIVISIONSANITARY SEWER DRAINAGE BASINSBOZEMAN, MT
LP
LOYAL
GARDEN
SUBDIVISION
ALPHA DRIVE
HUFFINE LANE
COTTONWOOD ROADSTAFFORD AVEGARFIELD ST
RESORT DRPARK BLVD
LOY
A
L
D
R
LOT 2
BLOCK 2
LOT 2
BLOCK 1
LOT 1
BLOCK 1 LOT 1
BLOCK 2
LOT 1
BLOCK 3
LOT 2
BLOCK 3
LOT 1
BLOCK 5
LOT 1
BLOCK 6
PUBLIC PARK
PUBLIC
PARK
PUBLIC
PARK
PUBLIC
PARK
TOWN
PUMP
-EXT'G-STAFFORD AVE(FUTURE)1 inch =
0
SCALE
200'
400'100'200'
EXHIBIT AMADISON ENGINEERING
895 TECHNOLOGY BLVD, SUITE 203
BOZEMAN, MT 59718
PHONE (406) 586-0262
COTTONWOOD ROAD IMPROVEMENTS
SEWER AND WATER MAIN EXHIBIT
BOZEMAN, MT
cushingterrell.com
Appendix C: Cottonwood Phase 1 Sanitary Sewer Report
cushingterrell.com
Appendix D: Loyal Garden Lift Station Analysis Excerpts
Loyal Garden Lift Station
Capacity Analysis Report
Page 1 of 4
LOYAL GARDEN SUBDIVISION
LIFT STATION CAPACITY ANALYSIS REPORT
A. General
This report will give an overview of the analysis of the capacity of the existing Loyal Garden
Subdivision Sanitary Sewer Lift Station. The purpose of this analysis is to determine the actual
flow to the lift station and determine how much additional capacity remains for the future
development of the 28-acre Cottonwood Subdivision (Lot 3A-1, Minor Subdivision 454C) located
to the east of Loyal Garden Subdivision. The lift station was designed for the sanitary sewer flows
within Loyal Garden Subdivision and an additional 140 acres in the surrounding area to the east
and south (including future Cottonwood Subdivision). As of this writing (March 2020), only one
development within the 140 acres outside of Loyal Garden Subdivision has utilized the lift station;
Lot 1, Minor Subdivision 454B (Town Pump). Given the size and density of the proposed
Cottonwood Subdivision, the City of Bozeman Engineering Department has requested a capacity
analysis of the lift station prior to allowing Cottonwood Subdivision to utilize it for their
development.
The following references were used in this capacity analysis:
a. COB Design Standards and Specifications Policy, 2004. Addendum #6 (DSSP)
b. COB Modifications to Montana Public Works Standard Specifications (MPWSS),
Addendum #3
c. City adopted MPWSS and Adopted Addenda
d. COB Wastewater Facility Plan, 2015
e. City of Bozeman Zoning Map
f. City of Bozeman GIS Infrastructure viewer
B. Capacity Analysis
It was originally intended to meter the sanitary sewer flow at four different manholes within the
subdivision; capturing all the contributing drainage basins to the lift station. For various reasons
discussed below, this method was abandoned and a multi-faceted approach was agreed upon
between Madison Engineering and the City of Bozeman Engineering Department for the capacity
analysis. These methods included:
• Flow metering of two manholes (M0615 and M0617) within Loyal Garden Subdivision
(see Sheet EX1.0 in Appendix A for the location of these manholes within the subdivision),
• Water consumption data provided by City of Bozeman Utility Billing Department,
• Proportional estimation of flow per single family home based on flow metering data from
M0615, and
• Sewage Calculation Memorandum from CTA Group for West Bozeman Ambulatory
Surgery Center (ASC) dated April 24, 2019.
Flow metering
TD&H Engineering provided the metering and data collection services for this project in
collaboration with the City of Bozeman Water and Sewer Department. The original plan of
Loyal Garden Lift Station
Capacity Analysis Report
Page 2 of 4
monitoring four separate manholes for a duration that captured three rainfall storm events was
abandoned in February 2020. Multiple technical issues with the flow meters and the time of year
during which monitoring needed to take place made capturing three rainfall storm events
impractical and overly time consuming. Also, the manholes that drain from Lot 11, Block 1
(Golden Gate Condos) had sub-optimal pipe in/out angles to accurately meter the flow.
Flow data from M0615 was collected for one week between 11/20 and 11/28/2019. The average
daily flow to this manhole was 234 gallons per day (gpd). M0615 receives flow from seven single
family homes in Loyal Garden Subdivision (see Sheet EX1.0, Drainage Basin 2).
Flow data from M0617 was collected for two weeks between 02/19 and 03/05/2020. The average
daily flow to this manhole was 13,170 gpd. M0617 receives flow from the majority of lots in Loyal
Garden Subdivision (see Sheet EX1.0, Drainage Basin 3). The flow metering data captures data
points once per minute which resulted in over 10,000 data points per manhole. The excel files
containing this data are too large to share in the appendix of this report and are available upon
request from Madison Engineering. The data has been averaged and summarized in Appendix B.
Water consumption data
Water consumption data provided by the City of Bozeman Utility Billing Department was used to
determine the sanitary sewer flows from Lot 11, Block 1 (Golden Gate Condos) and Lot 1, Minor
Subd. 454B (Town Pump). Data was collected from the previous two years to determine an average
daily flow. This is considered to be a conservative estimate of sanitary sewer flows from these two
lots because if any water consumption was used for landscape irrigation, it is included in these
figures even though it does not drain directly to the sanitary sewer. The average daily flow from
Golden Gate Condos is 5,066 gpd and from Town Pump it is 3,862 gpd. See Appendix B for a
summary of the water consumption data and Appendix E for the original data provided by the City
of Bozeman Billing Department.
Proportional estimation of flow
Eight lots within Block 3 of Loyal Garden Subdivision fall outside of the manholes that were
monitored. Since these lots contain single family homes, similar to the seven lots that drain to
M0615, the flow per lot per day was calculated and applied to these unmonitored lots in Block 3.
The average daily flow from these eight lots in Block 3 is 268 gpd (see Sheet EX1.0, Drainage
Basin 1). See Appendix B for calculations.
Sewage Calculation Memorandum from CTA Group for West Bozeman ASC
At the time of this writing the West Bozeman ASC is under construction on Lot 1A of Block 1,
Loyal Garden Subdivision. CTA Group provided a memorandum with sewage calculations for the
proposed site development to the City of Bozeman Engineering Department on April 24, 2019.
Their calculations show that the ASC will result in 4,095 gpd of sanitary sewer flow to the lift
station.
A summary table of the average daily sanitary sewer flows to Loyal Garden Subdivision Lift
Station is included on Sheet EX1.0 in Appendix A.
Loyal Garden Lift Station
Capacity Analysis Report
Page 3 of 4
C. Discussion of Inflow & Infiltration
In order for Cottonwood Subdivision to be developed, the remaining capacity of the Loyal Garden
Lift Station needed to be determined. Given the timing of the start of construction of Cottonwood
Subdivision (estimated summer 2020) and the need for the manhole flow metering to include a
time period that receives three rainfall events, the Inflow and Infiltration (I & I) was estimated
using the Bozeman DSSP standard of 150 gpd/acre. This was agreed upon as an acceptable solution
for performing the lift station capacity analysis during the winter of 2019-2020 between Madison
Engineering and the City of Bozeman Engineering Department. It is assumed that given the time
of year of the flow metering at M0615 and M0617 (November and February/March, respectively)
that no significant I & I was captured during those periods. Therefore, 150 gpd/acre was applied
to the entire 75-acre Loyal Garden Subdivision, the 3.06-acre Lot 1 of Minor Subd. 454B (Town
Pump) and the 28.09-acre Lot 3A-1 of Minor Subd. 454C (Future Cottonwood Subd.) to estimate
the I & I. This is considered a conservative estimate because the Loyal Garden sanitary sewer
system is relatively new PVC SDR 35 (constructed in 2007) and I & I is a far less common of an
issue in newer PVC systems. All I & I flow values cancel out because the lift station was originally
designed using the same 150 gpd/acre standard in 2006.
D. Summary of original lift station design
The Loyal Garden Lift Station was designed in 2006 by TD&H Engineering. It was calculated that
the average daily flow from Loyal Garden Subdivision would be 28,080 gpd with an additional
11,250 gpd allocated for I & I (see excerpt of original TD&H design report in Appendix D). The
analysis presented herein, shows that the original design figure of 28,080 gpd was conservative.
The actual estimated flow to the lift station from Loyal Garden Subdivision is 22,833 gpd. Because
our analysis did not monitor I & I, the same value of 11,250 gpd was used, which cancels out.
Therefore, 5,247 gpd of lift station capacity remains unused within the Loyal Garden Subdivision.
The original estimation provided in the lift station design report (see Appendix D) of daily flow
from the additional 140 acres was 80,640 gpd. With the development of Town Pump in 2016 on
Lot 1, Minor Subd. 454B, 3.06 acres of the 140 acres were used. Using the water consumption
data for Town Pump, our analysis shows an average daily flow of 3,862 gpd. This means that for
the additional 140-acre area originally specified in the Loyal Garden lift station design report, a
sanitary sewer capacity of 76,778 gpd remains available for use by the Cottonwood Subdivision.
In 2019, the City of Bozeman Engineering Department decided that the remaining capacity in the
Loyal Garden lift station would be allocated on a first-come first-served basis.
The sanitary sewer design report for Cottonwood Subdivision estimates an average daily flow of
55,900 gpd (see excerpts from Cottonwood Subd. sanitary sewer report in Appendix E). Therefore,
adequate capacity exists in the Loyal Garden Lift Station for the entirety of Cottonwood
Subdivision. A summary table comparing the original lift station design with the flow analysis and
the future Cottonwood Subdivision is presented below in Table 1.
Loyal Garden Lift Station
Capacity Analysis Report
Page 4 of 4
Table 1. Original design and capacity analysis summary
Area
Original design
avg. daily flow
(gpd)
Capacity analysis
avg. daily flow
(gpd)
Difference between
original and actual
(gpd)
Loyal Garden Subd. 28,080 22,833 5,247 surplus
Add’l 140 acres 80,640 59,762 20,878 surplus
Total 108,720 82,595 26,125 surplus
In summary, the Loyal Garden lift station has adequate capacity to serve the full build out of the
future 28-acre Cottonwood Subdivision and still has 20,878 gpd available for the future
development of adjacent lots within the original “additional 140-acre” district. Also, there is 5,247
gpd of unused lift station capacity within Loyal Garden Subdivision, which equates to a total of
26,125 gpd of available capacity.
Appendices
A. Exhibit 1.0 – Drainage Basin Map
B. Summary of flow data, water usage and I & I
C. Sewage flow calculation memo by CTA Group for West Bozeman ASC
D. Excerpts from original Loyal Garden Lift Station Design Report
E. Excerpts from Cottonwood Subdivision sewer design report
F. Water usage data for Golden Gate Condos and Town Pump
cushingterrell.com
Appendix E: Calculations and Back-Up Data
Channel Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Sunday, Dec 20 2020
<Name>
Circular
Diameter (ft) = 0.67
Invert Elev (ft) = 100.00
Slope (%) = 0.40
N-Value = 0.013
Calculations
Compute by: Known Depth
Known Depth (ft) = 0.50
Highlighted
Depth (ft) = 0.50
Q (cfs) = 0.706
Area (sqft) = 0.28
Velocity (ft/s) = 2.49
Wetted Perim (ft) = 1.40
Crit Depth, Yc (ft) = 0.40
Top Width (ft) = 0.58
EGL (ft) = 0.60
0 1
Elev (ft)Section
99.75
100.00
100.25
100.50
100.75
101.00
Reach (ft)
256 + 96 =352
Population = 352 units * 2.17 persons/household = 764 persons
Peaking Factor = ((18+.764^.5)/(4+.764^.5)) = 18.87/4.87 = 3.87
COTTONWOOD SUBDIVISION - PEAKING FACTOR UPDATE
Phase 1 & Phase 2 Unit Count =