HomeMy WebLinkAbout45 E101 ELECTRICAL SITE PLAN -PACKAGE ETR DD
WPWPSSJS
PACKAGE EPHASE I UNDER PREVIOUS PERMIT. WP1WP1WP1WP1WP1WP1WP1WP1WP1WP1WP1WP1WP1WP1WP1WP1WP1WP1WP1WP1WP1WP1WP1WP1CP1CP1CP1CP1P1P1WP1WP1WP1WP1'MDP-1''HA'11234567'MDP-2''HB'234567234BUILDING 15TYPE CBUILDING 18TYPE ABUILDING 17GARAGESBUILDING 16GARAGESALLEYWP1WP189ABCDABCD1234512345COPYRIGHT GGLO. ALL RIGHTS RESERVED.ORIGINAL SHEET SIZE IS 24"x36"SHEET NO.SHEET TITLEGGLO PROJECT MANAGER:GGLO PRINCIPAL IN CHARGE:PROJECT NO.:OWNER APPROVAL:MARK DATE DESCRIPTIONISSUE INFORMATIONREVISIONSPROJECT:OWNER:PROJECT ADDRESS:PLOT DATE/TIME:A10.18.2024 FORMAL SITE PLAN SUBMITTALAPPROVAL STAMPSPhone:208.288.2181Project:24GGLO0110/17/2024 12:29:57 PM2023075OXBOW APARTMENTS4650 W GARFIELD STBOZEMAN, MT 59718E-101ELECTRICAL SITE PLAN -PACKAGE EOXBOW APARTMENTSPHASE IIPROJECT STATUSOXBOW LAND HOLDING LLC3112 LOS FELIZ BOULEVARDBOISE, ID 84703SITE GENERAL NOTESA. CONTRACTOR SHALL CONTACT UNDERGROUND UTILITYLOCATING SERVICE PRIOR TO EXCAVATION FORELECTRICAL WORK.B. CONTRACTOR IS RESPONSIBLE FOR COORDINATION WITHALL OTHER SITE DISCIPLINES INCLUDING BUT NOT LIMITEDTO TRADES ASSOCIATED WITH WATER, SEWER, AND GASINSTALLATIONS.C. ELECTRICAL CONTRACTOR SHALL COORDINATE UTILITYWORK REQUIRED BY IDAHO POWER AND SHALL FORWARDIDAHO POWER WORK INVOICE TO OWNER FOR PAYMENTBY OWNER.D. ROUTE ALL EXTERIOR LIGHTING (INCLUDING SOFFIT ANDAREA LIGHTING SHOWN ON SHEET E2.0L AND E2.1L)THROUGH A LIGHTING CONTACTOR. LOCATE LIGHTINGCONTACTOR IN ELECTRICAL ROOM. PROVIDE PHOTO-CELLON ROOF AND ELECTRO-MECHANICAL 7-DAY TIME CLOCKADJACENT TO CONTACTOR CABINET. REFER TO DETAIL X,SHEET XXX.KEYED NOTES1 REFER TO DETAIL 1, SHEET E-201 FOR POLE BASE DETAIL.TYPICAL OF ALL LIGHT POLE BASES.2 NEW TRANSFORMER AND PAD BY SERVING UTILITY.COORDINATE WITH SERVING UTILITY AS REQUIRED FORCONSTRUCTION SCHEDULE.3 APPROXIMATE ROUTING/LOCATION OF SERVING UTILITYUNDERGROUND CONDUIT/CONNECTORS. SHOWN FORREFERENCE ONLY. PRIMARY CONDUIT, CONDUCTORS, ANDTERMINATIONS BY SERVING UTILITY. COORDINATE EXACTREQUIREMENTS AND APPROVALS WITH UTILITY PRIOR TOCOMMENCING WORK.4 REFER TO DETAIL 2, SHEET E-102 FOR TYPICAL TRENCHINGDETAIL. COORDINATE EXACT REQUIREMENTS ANDAPPROVALS WITH UTILITY PRIOR TO COMMENCING WORK.5 APPROXIMATE LOCATION OF MAIN DISTRIBUTION PANEL'MDP.' REFER TO BUILDING FLOORPLANS FOR EXACTLOCATIONS.6 CHARTER COMMUNICATIONS TO PROVIDE CONDUIT ANDELECTRICAL CONTRACTOR TO INSTALL FORPHONE/TV/DATA SERVICES. COORDINATE EXACTREQUIREMENTS WITH SERVICE PROVIDERS PRIOR TOCOMMENCING WORK.7 BUILDING COMMUNICATIONS PANEL.8 CONNECTION FOR OUTDOOR ELECTRIC FIREPLACE.COORDINATE LOCATION AND REQUIREMENTS WITHARCHITECT AND FIREPLACE SUPPLIER. CONFIRM FIRESHUT-OFF AND TIMER LOCATION PRIOR TO ROUGH-IN.9 CONNECTIONS AND SUTOFF SWITCHES FOR GAS POWEREDGRILLS. COORDINATE CONNECTION AND SWITCHREQUIREMENTS AND LOCATIONS WITH ARCHITECT PRIORTO ROUGH-IN.#SCALE: 1" = 20'-0"1ELECTRICAL SITE PLAN - PACKAGE EMARK DATE DESCRIPTION