HomeMy WebLinkAbout19a L142E IRRIGATION PLAN-ESTAFFORD AVEPERMIT SET F
PHASE 1 SITE STAARC-LAR-LIC-8876
E O FT OMN
N
AT
AMARKSINDELL
No.
L
A
NDSCAPE A R C H IT ECTA
B
C
D
A
B
C
D
123 4 5
123 4 5
COPYRIGHT GGLO. ALL RIGHTS RESERVED.ORIGINAL SHEET SIZE IS 24"x36"
SHEET NO.
SHEET TITLE
GGLO PROJECT MANAGER:
GGLO PRINCIPAL IN CHARGE:
PROJECT NO.:
OWNER APPROVAL:
MARK DATE DESCRIPTION
ISSUE INFORMATION
REVISIONS
PROJECT:
OWNER:
PROJECT ADDRESS:PLOT DATE/TIME:A 10.18.2024 FORMAL SITE DEVELOPMENT REVIEWAPPROVAL STAMPSB 12.18.2024 SPR REVISION 1
C 02.07.2025 SPR REVISION 2
2/10/2025 3:05:44 PMBurton Yuen
Mark Sindell
2023075
OXBOW APARTMENTS4650 W GARFIELD STBOZEMAN, MT 59718
L-142E
IRRIGATION PLAN-E
OXBOW APARTMENTSPHASE II
SPR REVISION 2OXBOW LAND HOLDINGS LLC1100 W IDAHO ST., SUITE 630BOISE, ID 83702
PLANNORTH
0'10'20'40'
F E
PHASE 1G
KEY PLAN
1" = 20'-0"A1IRRIGATION PLAN - E
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
IRRIGATION NOTES:
ALL PROPOSED PLANTING AREAS WILL BE WATERED WITH A COMPLETE IN-GROUND AUTOMATIC IRRIGATION SYSTEM AS SHOWN.THE CONTRACTOR SHALL VERIFY WATER PRESSURE PRIOR TO CONSTRUCTION. REPORT INSUFFICIENT MEASURED WATER PRESSURE TO THE ARCHITECT. DO NOT WILLFULLY INSTALL THE IRRIGATION SYSTEM AS SHOWN ON THE DRAWINGS WHEN IT IS OBVIOUS IN THE FIELD THAT OBSTRUCTIONS, GRADE DIFFERENCES, OR DIFFERENCES THE AREA DIMENSIONS EXIST THAT MIGHT NOT HAVE BEEN CONSIDERED IN THE DESIGN. SUCH OBSTRUCTIONS OR DIFFERENCES SHOULD BE BROUGHT TO THE ATTENTION OF THE ENGINEER. IN THE EVENT THIS NOTIFICATION IS NOT PERFORMED, THE IRRIGATION CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ANY REVISIONS NECESSARY. WHERE THE FIELD CONDITIONS REQUIRE ADJUSTMENTS, IRRIGATION SHALL BE ADDED OR DELETED IN ACCORDANCE WITH THE IRRIGATION LEGEND OR MANUFACTURER'S SPECIFICATIONS. PIPE SIZING SHALL BE ADJUSTED ACCORDINGLY, AND WATER VELOCITY SHALL NOT EXCEED 5 FEET PER SECOND. THE IRRIGATION CONTRACTOR SHALL FLUSH AND ADJUST ALL LINES FOR OPTIMUM PERFORMANCE. INSTALL BACKFLOW PREVENTION DEVICE AS REQUIRED BY LOCAL CODES AND HEALTH DEPARTMENT REQUIREMENTS. CONTRACTOR SHALL BE RESPONSIBLE FOR SLEEVES, CHASES AND PENETRATIONS UNDER PAVING, THROUGH WALLS, ETC., UNLESS OTHERWISE NOTED PRIOR TO PAVING AND FORMING. THE IRRIGATION SYSTEM IS DESIGNED TO BE WINTERIZED THROUGH THE DRAIN VALVE AT THE POINT OF CONNECTION. COMPRESSED AIR CAN ALSO BE USED THROUGH THE QUICK COUPLER VALVE AT THE POINT OF CONNECTION TO BLOW-OUT THE SPRINKLER ZONE. INSTALL AUTOMATIC DRAIN VALVE AT THE LOWEST POINT OF EACH ZONE.FOR DRIPLINE ZONES, USE 3/4-INCH PVC PIPE IN SLEEVES TO CONNECT PLANTING AREAS AND INSTALL POP-UP INDICATORS AT THE END OF THE DRIPLINES FOR QUICK AUDITING AND PRESSURE CHECKS OF THE SYSTEM. INSTALL AIR RELIEF VALVE AT THE HIGHEST POINT OF EACH DRIP ZONE.COORDINATE ALL BUILDING PENETRATIONS WITH ARCHITECTURAL PLANS AND WATERPROOFING REQUIREMENTS.SEE SHEET L-141 FOR IRRIGATION WATERING SCHEDULE
WATER PRESSURE TEST RESULT:
STATIC - 110 PSIRESIDUAL - 100 PSIPITOT - 84 PSI WHILE FLOWING 1540 GPM FROM A 2.5” NOZZLE.
SPR Revision 2
C
MARK DATE DESCRIPTION
B 12.18.24 SPR Revision 1
C 02.07.25 SPR Revision 2