Loading...
HomeMy WebLinkAbout021 Overall WW cushingterrell.com 411 East Main Street, Suite 101 | Bozeman, MT 59715 | 406.556.7100 December 18, 2024 City of Bozeman Engineering Department Alicia Paz-Solis 20 E. Olive Street PO Box 1230 Bozeman, MT 59771-1230 RE: The Oxbow (Cottonwood Apartments) Phase 2 – Site Plan Packages E, F, G Application #’s: 24586, 24587, and 24579 Dear Alicia, The purpose of this letter is to provide a summary of the overall combined wastewater flow from Site Plan Packages E, F and G. Additionally, the purpose is to verify the combined flow is within the previously City approved Loyal Gardens lift station capacity allotment of 64,014 gallons per day (gpd) (59,799 gpd without I&I) for The Cottonwood Subdivision (28.09 acres). In total, Site Plan Packages A, B, C, and D which were previously completed contribute approximately 36,376 gpd to the system (see attached analysis from February 4 2021). Approximately, 23,423 gpd were remaining for phase 2 development. Please refer to the recently submitted report titled “SANITARY SEWER REPORT The Cottonwood Apartments – BLOCK 1, LOTS 1 & 2” for project specifics related to the Site Plan Package F & G sanitary sewer main extension. Please refer to your letter dated December 24, 2020 which provides the estimated overall Cottonwood Subdivision sewer flow of 64,014 gpd. Letter is attached for your reference. 2 cushingterrell.com 411 East Main Street, Suite 101 | Bozeman, MT 59715 | 406.556.7100 Table – 1: Overall Estimated Wastewater Flows The total average daily flow between Site Plan Packages E, F & G equals 18,447 GPD which falls within the remaining capacity of 23,423 GPD. Please call if any additional information is needed. You can reach me at 406-922-7111. Sincerely, CUSHING TERRELL Adam Schlegel, PE Project Engineer CONTRIBUTING BUILDINGS # OF UNITS DENSITY (PERSONS /UNIT) POPULATION (PERSONS) AVG. DAILY UNIT FLOW RATE (GPD PER CAPITA) ADF (GPD) 1BUILDING #19 - TYPE C 24 2.17 52 64.4 3,354 1BUILDING #20 - TYPE A 12 2.17 26 64.4 1,677 1BUILDING #21 - TYPE C 24 2.17 52 64.4 3,354 1BUILDING #22 - TYPE A 12 2.17 26 64.4 1,677 1BUILDING #23 - TYPE C 24 2.17 52 64.4 3,354 96 208 TOTAL ADF =13,416 COTTONWOOD APARTMENTS | SANITARY SEWER USAGE - SITE PLAN PACKAGES F & G 1AVERAGE DAILY FLOW IS BASED ON THE UNIT DEMAND OF 64.4 GAL./PERSON/DAY AND 2.17 PERSONS PER HOUSEHOLD. THIS INFORMATION IS PROVIDED ON PAGE OF 2015 WASTEWATER COLLECTION FACILITIES PLAN UPDATE. CONTRIBUTING BUILDINGS # OF UNITS DENSITY (PERSONS /UNIT) POPULATION (PERSONS) AVG. DAILY UNIT FLOW RATE (GPD PER CAPITA) ADF (GPD) 1BUILDING #15 - TYPE C 12 2.17 26 64.4 1,677 1BUILDING #18 - TYPE A 24 2.17 52 64.4 3,354 36 78 TOTAL ADF =5,031 COTTONWOOD APARTMENTS | SANITARY SEWER USAGE - SITE PLAN PACKAGE E 1AVERAGE DAILY FLOW IS BASED ON THE UNIT DEMAND OF 64.4 GAL./PERSON/DAY AND 2.17 PERSONS PER 12.18.20 2 4 Attachment 1Sanitary Sewer Capacity Letter from February 4, 2021