Loading...
HomeMy WebLinkAbout003 Package E Narrative cushingterrell.com October 20, 2024 Community Development Department City of Bozeman 20 E. Olive Street Bozeman, MT 59771 Re: Formal Site Plan Application- Oxbow Apartments Phase II: Site Package E Dear Planning & Development Review Committee, Please accept this request is for a Formal Site Plan Development Review by the City’s Development Review Committee (DRC) for Phase II of the Oxbow Apartments. Included in the submittal are the required application forms: • Project Narrative • N1 Noticing Checklist and Materials • Traffic Study • Water Rights Information • Stormwater Design Report • Current Plat • CCON Concurrent Construction Request • Plan Sheets (PDFs). • Concept Review Waiver Approval To further convey the project design, we have also provided a project rendering with this submittal. A fee will be paid upon invoice from the city. Informal Review General Information: Name of Project: Oxbow Apartments Phase II Project Location: TBD Stafford Ave, Bozeman MT 59718 Previous review applications completed for this property include: - Application 19-401 Cottonwood Subdivision Preliminary Plat - Application 20-310 Informal Review - Cottonwood Subdivision Final Plat - Pre Application Meeting with City Staff Thursday September 26th at 2pm Site Package E Legal Description: COTTONWOOD SUB PH 1 & 2, S15, T02 S, R05 E, BLOCK 2, Lot 1, ACRES 1.873, PER PLAT J-685 2 cushingterrell.com Project Narrative: The project site is currently undeveloped within the Cottonwood Subdivision. Improvements to the site were completed during the summer and fall 2020, and Final Plat was approved by the City Commission on March 9, 2021. The overall project consists of site development and new construction of a multi-family residential development located on Lots 1 & 2 Block 2, Lot 1 Block 2 of the Cottonwood Subdivision (Lot and block references per the Preliminary Plat) totaling 5.353 acres. The proposed residential development includes seven (7) residential buildings, three (3) residential building designs, 132 total residential units, and two (2) garage structures. The project area was divided into three (3) sub-areas and are defined on sheet A101 for review and permitting purposes. A complete Site Plan submittal package has been prepared for each sub-area. One set of building design details have been completed for the two residential building types and the garages. COTTONWOOD SUBDIVISION LOT & BLOCK BUILDING TYPE & COUNT TOTAL # DWELLING UNITS SITE PACKAGE E Lots 1 Block 2 • Type A=1 • Type C= 1 • Garage Buildings 36 Dwelling Units SITE PACKAGE F Lot 1 Block 1 • Type A= 1 • Type C= 1 36 Dwelling Units SITE PACKAGE G Lot 2 Block 1 • Type A= 1 • Type C= 2 60 Dwelling Units Design Intent The Oxbow Apartments, located in Bozeman’s emerging West Side, is a mixed-use housing solution, designed to capture Bozeman identity and values, create positive growth for the community, and explore a new typology of apartment living that contributes to and engages with the surrounding natural landscape, adjacencies and views. The first phase of the community was designed to unfold along a central spine of clubhouse buildings and the central public park. The architecture pulls from the proud honest forms of the Bozeman vernacular. The buildings are rooted to the ground by way of gabion wall extensions and a restored, mounding wildflower meadow. Organized around the ideals of a mountain lifestyle, the fitness and clubhouse amenities are located in referential but modern barnlike 3 cushingterrell.com structures that are sited to celebrate arrival and create a true sense of place. Phase I of The Oxbow consists of 268 units, community amenities including club room, hot pool, wellness and fitness, a flexible retail space, and full time leasing on site. Phase 2 of the development consists of complimentary residential buildings that build out the Northern portion of the subdivision. A total of 132 units, a new outdoor amenity pavilion and detached garages. This phase also includes the continuation of the multi-use path as a community amenity and to provide future city trail connections. Parking There are currently 67 vehicular parking spaces and 4 bike spaces planned for Site Package E. Parking for the Site Package E is defined in the table below. SITE PACKAGE E PARKING DETAILS Uses The primary use for the project is residential in nature. The project is located in a growing area of Bozeman and will provide a living option for the community that is accessible and within reasonable proximity to the city core. Each building will include a variety of one, two and three bedroom units. Conceptual Site Plan Review Waiver A Pre Application meeting was held on September 26, 2024 to discuss Oxbow Phase II in its entirety and to discuss the site plan package approach with city staff. During that meeting a request to waive Conceptual Review for all three site plan packages was initiated. The request was approved on September 30, 2024. A completed Waiver Request Form is included in this submittal. 4 cushingterrell.com Concurrent Construction A request to consider Concurrent Construction for the development of Site Plan Package E is included in this submittal. A completed form and responses to the appropriate criteria are also included in this submittal. Thank you for considering this application. Please contact me at nicoleolmstead@cushingterrell.com should you have any questions. Sincerely, Nicole Olmstead Project Manager | Land Planner