Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
020 L1-04 - Materials Plan
Xref K:\SEA_LA\Projects\090217000 - Blackwood Groves\CAD\References\XREF\24_1028_Blackwood Groves_Site-Floor Plan - Site Plan.dwg 32-94-0232-94-0132-31-0532-31-0432-32-02© BLACKWOOD GROVES PREPARED FOR 4TH AVENUE CAPITOLAVOID CUTTING UNDERGROUNDUTILITY LINES. IT'S COSTLY. REVISED PER CITY REVIEW RL1UNDERGROUND UTILITY NOTEMATCHLINE SEE SHEET L1.3S 19TH AVE canter AVE L1.4MATERIALS PLANNORTH