HomeMy WebLinkAbout028 Sewer Design Report SEWER MAIN DESIGN REPORT FOR: Blackwood Groves Infrastructure Improvements Bozeman, MT Prepared By: WWC Engineering 895 Technology Drive, Suite 203 Bozeman, MT 59718 (406) 586-0262 December 2024 Blackwood Groves Wastewater Design Report Page 1 of 3 BLACKWOOD GROVES SEWER MAIN DESIGN REPORT A. General Project Description This report will give an overview of the proposed wastewater flow generation for the new development of Blackwood Groves. The 7.84-acre site is situated in the southeast portion of Bozeman within the Residential Emphasis Mixed Use (REMU) Zone on Lot 1, Block 1 and Lot 1, Block 13 of the Blackwood Grove Subdivision. The development includes 11 buildings (9 residential, a clubhouse, and a maintenance building), consisting of 216 units. The proposed infrastructure is anticipated to be constructed during the fall of 2025. No phasing is proposed for the sewer system, however, the units within the development will be phased. The sewer infrastructure will be constructed during Phase 1. Included in this report is a description of the proposed wastewater collection system and design parameters. Once the wastewater system is constructed and approved, the system will become a part of the City of Bozeman (C.O.B.) system. The following references were used in the wastewater facilities design and capacity analysis: a. COB Design Standards and Specifications Policy, 2017. Addendum #7 b. COB Modifications to Montana Public Works Standard Specifications (MPWSS). c. City adopted MPWSS and Adopted Addenda d. COB Wastewater Facility Plan, 2015 e. WQB Circular No. 2 f. City of Bozeman Zoning Map g. City of Bozeman Infrastructure Viewer The procedures and parameters outlined in the COB Design Standards and Specifications Guide were used in the design of the sewer infrastructure for the proposed development. B. Capacity Analysis The proposed wastewater collection system consists of 1,088 linear feet of new 8” PVC sewer main and will provide service to the 11 buildings in the proposed development. Effluent generated will ultimately flow north and east into existing manholes located on Canter Avenue, and then into an existing 10” PVC sewer main. The wastewater demands from the proposed subdivision were estimated based on a flow per capita basis, which provided a more conservative flow than a per zoned acre basis. (COB Table V-2 specifies an average daily flow rate of 1,030 gal/ac-day for residential land use, resulting in 8,075 gpd = 7.81 ac x 1,030 gal/ac-day). The proposed sewer mains have been sized to flow at no more than 75-percent of full capacity at peak hour conditions of full build out. A Manning coefficient of 0.013 was used for PVC pipe. Blackwood Groves Wastewater Design Report Page 2 of 3 The average daily flow is based on the number of units, 2.17 residents per unit, and 64.4 gallons per capita per day, the latter two values based on COB Wastewater Facility Plan, 2015 design standards: (216 units ∗2.17 residents unit ∗64.4 gallons capita/day )=30,186 gpd An approximate population for Blackwood Groves at full build out is calculated as: 216 units ∗2.17 residents unit =469 persons This equivalent population can be utilized to determine a peaking factor: (𝑃𝑚𝑎𝑥 𝑃𝐴𝑣𝑒 )=18 +𝑃.5 4 +𝑃.5 =18 +.456.5 4 +.456.5 =3.99 (P = Population/thousands) Based on a total population of 469 people, a peaking factor of 3.99 was calculated. The peak flow rate anticipated from the development based on an average daily flow of 30,186 gallons per day is: Peak Flow Rate = (30,186 gpd x 3.99) =120,442 gpd = 83.6 gpm = 0.186 cfs Additionally, an infiltration flow of 1,176 gpd (150 gal/acre/day x 7.84 acres) has been added to the flow, resulting in a total flow of 163,023 gpd (0.251 cfs). The sewer main size for the development will be an 8-inch, based on minimum required pipe size and designed at a 0.40% slope minimum. An 8-inch PVC sewer main at 0.40% slope has a capacity of 0.64 cfs at ¾ pipe depth, which exceeds the proposed peak flow of 0.186 cfs effluent generated from the site. Therefore the 8-inch PVC sewer main is adequate for the Blackwood Groves wastewater generation. Calculations are included in the end of this report in Appendices 1 and 2. C. Proposed Collection System PVC pipe meeting COB specifications will be used for the sewer mains. The effluent from The Blackwood Groves development will drain into a proposed 8-inch diameter sanitary sewer main via 6-inch sewer services. The 8” PVC sewer main will be connected to an existing 8” PVC stub which then flows into to an existing 10” PVC sewer main in Canter Avenue. The maximum manhole spacing will be less than 400 feet for the 8-inch main. Manholes will be constructed Blackwood Groves Wastewater Design Report Page 3 of 3 according to COB specifications. The 6-inch PVC sewer service will be installed at 1% minimum slope. The sewer main will maintain a minimum separation of 10-feet horizontally and 18-inches vertically from any proposed or existing public water mains. D. Downstream Capacity Analysis The sanitary sewer mains were designed in conformance with the City of Bozeman Wastewater Improvement Plan. It is anticipated that the City of Bozeman sanitary sewer system has enough capacity to accommodate the main extension as this was included in the onsite design of the downstream collection system, see Appendix 3 for the master sanitary sewer report for the subdivision. A capacity letter from a City Engineer will be required prior to DEQ approval of the system. E. Conclusion As outlined above, a proposed 8-inch sanitary sewer collection system serving The Blackwood Groves residential development has the capacity for the effluent generated from the development. The wastewater sewer collection system was designed on a conservative premise for future development. This project will require the approval of the City of Bozeman Engineer and MDEQ. Appendices: 1. Sewer Main Capacity Calculations 2. Wastewater Daily Flow Analysis Calculations 3. Subdivision Master Sewer Design Report Appendix 1 – Sewer Main Capacity Calculations Appendix 2 – Wastewater Daily Flow Analysis Calculations Appendix 3 – Subdivision Master Sewer Design Report Design Report - Page 1 of 4 INTRODUCTION The Blackwood Groves Subdivision is a proposed 120-acre development located at the south side of the City of Bozeman in Gallatin County, Montana. The proposed project is zoned as Residential Emphasis Mixed Use (REMU) and will feature a variety of commercial, residential, and park/open space developments. As part of the project, public improvements including water, sanitary sewer, stormwater, and City road infrastructure are proposed. SANITARY SEWER SYSTEM LAYOUT The project is located within the City’s Cattail Creek Sanitary Sewer Drainage Basin, and the City has required that all sewer flow from the proposed project remain within this drainage basin. Therefore, in order to connect to the Cattail Creek Drainage basin, an 18” sanitary sewer main extension will be installed in the S. 19th Avenue right of way from this project north to the existing manhole in the S. 19th Avenue / Graf Street intersection. This 18” sewer main extension is part of the City’s master wastewater facility plan, and also in the Capital Improvements Plan for this portion of the City. As part of the wastewater facility plan, a 10” sewer main will need to be extended to a manhole in S. 19th Avenue at the southern limit of work for the project to allow for continued southward extension in the future. Since the majority of the property on the west side of S. 19th Avenue along the project frontage has already been developed and provided access to City sewer mains, the proposed sewer design for this project extends the 10” sewer main through the project’s interior streets to the project’s southern boundary on South 19th Avenue. In addition to the 18” and 10” sewer mains, the City’s wastewater facility plan also requires the extension of a 12” sanitary sewer main to the southeast portion of the project for future extension to the S. 3rd Avenue / Goldenstein Lane intersection. Once the 18” sewer main enters the site, the main will split into a 10” and 12” at the Avenue A and Cambridge Drive intersection. The 10” sewer main will run south down Avenue A to Street E, then west on Street E to South 19th Avenue. A 10” sewer main stub will be installed at the edge of the South 19th Avenue improvements. The 12” sewer main will extend east down Cambridge Drive to South 15th Avenue. Then head south down South 15th Avenue to the intersection with Street B. The Design Report - Page 2 of 4 main will then extend east on Street B to South 11th Avenue. Once on South 11th Avenue the main will extend south to the project limits. A 12” sewer main stub will be installed at the southern project limits on South 11th for future development. All of the proposed single-family residential lots will be served by City standard 4” sewer service stubs. The larger lots (planned for multi-family and commercial developments) will be served by a combination of 8” sewer main stubs for future extension within the lots, and individual sewer service stubs, where practical. The size and location of these proposed stubs and services will be finalized with the infrastructure design of the individual phases of the development. DESIGN ASSUMPTIONS The projected sanitary sewer flows for the proposed project were calculated using the design values in the City of Bozeman Design Standards and Specifications. Since all of the lots proposed for multi-family development have a preliminary concept design, anticipated dwelling units could be estimated for each of the multi-family lots. The flows from the residential lots were estimated using a design population of 2.17 people per dwelling unit, and residential flow rate of 65 gpcd, per city standards. A residential peaking factor was calculated using the Harmon Formula for the projected residential population for the entire project. This was then used to determine the projected peak hour flows. Although the project is zoned as REMU, several of the lots are expected to have a commercial use. Since the design of these lots is not yet finalized, the flow rate of 3,000 gal/acre/day for B-3 zoning designations from Table V-1 “Wastewater Flow Rate for Zoned Undeveloped Areas” in the City Design Standards was conservatively used to estimate the projected daily flow from these lots. The maximum peaking factor of 4.5 was also assigned to these commercial lots to estimate the peak hour flow rate. Inflow and Infiltration for the proposed development was calculated using the city standard estimate of 150 gal/acre/day of infiltration. This infiltration rate was applied to the entire development, with the exception of the two eastern parks that are not adjacent to sanitary sewer Design Report - Page 3 of 4 main extensions, and several sections of the streets where sewer mains are not proposed. This flow rate was also applied to the portions of the S. 19th Avenue right of way where the 18” sewer main extension is proposed. DESIGN LOAD The projected flows from the development were calculated on a block-by-block basis, and also categorized per individual phases of the development. Tables containing these calculations can be found in Appendix B. Below are the projected design loads for the proposed development based on the calculations in Appendix B: Residential Population Estimate: 1,668 people Average Daily Flow Rate: 157,710 gal/day Daily Infiltration Rate: 16,621 gal/day Peak Hour Flow Rate: 440.3 gal/minute The capacity of 8”, 10”, 12”, and 18” sewer mains at their minimum allowable slopes were checked using Manning’s Equation: Q = (1.486/n)AR2/3S1/2 8‐inch PVC Pipe @ 75% Capacity Pipe Diameter =8in Manning's n= 0.013 (for PVC) Min. Slope =0.004ft/ft Area =0.3491ft2 Perimeter =2.0944ft Hydraulic Radius =0.1667ft Qfull =0.7643 cfs Q0.75 =0.5732cfs 257.3 gpm 10‐inch PVC Pipe @ 75% Capacity Pipe Diameter =10in Manning's n= 0.013 (for PVC) Min. Slope =0.0028ft/ft Area =0.5454ft2 Perimeter =2.6180ft Hydraulic Radius =0.2083ft Qfull =1.1594 cfs Q0.75 =0.8695cfs 390.3 gpm Design Report - Page 4 of 4 CONCLUSION Based on these calculations, the proposed 18” and 12” sewer main extensions are sufficiently sized to convey the proposed sanitary sewer flows from the entire subdivision. The proposed flows are to be conveyed by multiple 8” sewer main extensions that will connect to the 10”, 12” and 18” mains at several locations, so at no point will the entire development be concentrated into a single section of 8” or 10” sewer mains. The proposed sanitary sewer main extensions within the development will be sized and finalized with infrastructure design of the individual phases of the development. G:\C&H\19\190390\Design Reports\Sewer\Preliminary Plat\Sewer Design Report - Body.Docx 12‐inch PVC Pipe @ 75% Capacity Pipe Diameter =12in Manning's n= 0.013 (for PVC) Min. Slope =0.0022ft/ft Area =0.7854ft2 Perimeter =3.1416ft Hydraulic Radius =0.2500ft Qfull =1.6711 cfs Q0.75 =1.2533cfs 562.5 gpm 18‐inch PVC Pipe @ 75% Capacity Pipe Diameter =18in Manning's n= 0.013 (for PVC) Min. Slope =0.0012ft/ft Area =1.7671ft2 Perimeter =4.7124ft Hydraulic Radius =0.3750ft Qfull =3.6388 cfs Q0.75 =2.7291cfs 1,224.9 gpm APPENDIX A Sanitary Sewer Exhibit APPENDIX B Sanitary Sewer Flow Analysis Block Use DU's Lot Area  (sf) Lot Area  (acres) Total Area  (sf) Total Area  (acres)Population Avg.  Flow Rate  (gpd) Infiltration  Rate (gpd) Peak Hr. Flow  Rate (gpm) 1 Commercial N/A 205,948 4.73 256,908 5.90 N/A 14,190 885 45.0 2 Residential 6 36,497 0.84 40,297 0.93 13 845 139 2.2 3 Residential 6 36,000 0.83 40,500 0.93 13 845 140 2.2 4 Residential 6 52,434 1.2 52,434 1.20 13 845 181 2.3 5 Residential 6 63,000 1.45 63,000 1.45 13 845 217 2.3 6 Residential 12 57,600 1.32 62,400 1.43 26 1,690 215 4.4 7 Residential 12 57,280 1.31 57,280 1.32 26 1,690 197 4.4 8 Residential 20 104,870 2.41 139,983 3.21 43 2,795 482 7.4 9 Residential 49 134,021 3.08 237,220 5.45 106 6,890 817 18.0 10 Residential 32 87,475 2.01 108,030 2.48 69 4,485 372 11.6 11 Residential 32 86,994 2.00 99,166 2.28 69 4,485 342 11.6 12 Residential 40 104,146 2.39 104,146 2.39 87 5,655 359 14.6 13 Commercial N/A 130,612 3.00 220,927 5.07 N/A 9,000 761 28.7 14 Residential 140 182,825 4.2 220,710 5.07 304 19,760 760 50.6 15 Residential 90 109,458 2.51 109,458 2.51 195 12,675 377 32.4 16 Commercial N/A 70,480 1.62 88,005 2.02 N/A 4,860 303 15.4 17 Commercial N/A 176,868 4.06 176,868 4.06 N/A 12,180 609 38.5 18 Commercial N/A 131,497 3.02 131,497 3.02 N/A 9,060 453 28.6 19 Residential 52 183,260 4.21 219,586 5.04 113 7,345 756 19.1 20 Residential 21 57,963 1.33 82,173 1.89 46 2,990 283 7.8 21 Residential 24 86,739 1.99 104,956 2.41 52 3,380 361 8.8 22 Residential 21 57,659 1.32 112,075 2.57 46 2,990 386 7.8 23 Residential 14 74,124 1.7 74,124 1.70 30 1,950 255 5.1 24 Residential 122 168,111 3.86 168,111 3.86 265 17,225 579 44.1 25 Residential 34 82,401 1.89 157,709 3.62 74 4,810 543 12.6 26 Residential 14 85,959 1.97 90,898 2.09 30 1,950 313 5.2 27 Residential 10 66,949 1.54 66,949 1.54 22 1,430 231 3.8 28 Residential 6 83,216 1.91 83,216 1.91 13 845 287 2.3 R.O.W. N/A N/A N/A N/A 1,457,165 33.45 N/A N/A 5,018 3.5 Totals 769 63.70 110.79 1,668 157,710 16,621 440.3 Notes: persons per dwelling unit 2.17 1. Daily WW Generation Rate (gpcd) 65 Commercial WW Generation Rate (gal/ac/day) 3,000 2. Infiltration Rate (gal/ac/day) 150 Residential Peaking Factor (harmon Formula) 3.65 3. Commercial Peaking Factor  4.50 4. Conservative Peaking Factor of 4.5 applied to commercial  lots Residential Peaking Factor from input table is applied to  all residential lots The Right of Way (R.O.W.) area calculation includes the  portion of the 19th Avenue R.O.W. that will have sanitary  sewer main installed in it, but excludes several portions  of streets where no sewer main is expected to be  installed March 24, 2021 Table 1 ‐ Sanitary Sewer Flow Analysis ‐ By Block Blackwood Groves Subdivision Table Input Commercial B‐3 ww generation rate of 3,000 gpd  assumed for commercial lots Phase Block Use DU's Lot Area  (sf) Lot Area  (acres)Total Area (sf)Total Area  (acres)Population Avg.  Flow  Rate (gpd) Infiltration  Rate (gpd) Peak Hr. Flow  Rate (gpm) 2 Residential 6 36,497 0.84 40,297 0.93 13 845 139 2.2 3 Residential 6 36,000 0.83 40,500 0.93 13 845 140 2.2 4 Residential 6 52,434 1.20 52,434 1.20 13 845 181 2.3 5 Residential 6 63,000 1.45 63,000 1.45 13 845 217 2.3 6 Residential 12 57,600 1.32 62,400 1.43 26 1,690 215 4.4 7 Residential 12 57,280 1.31 57,280 1.32 26 1,690 197 4.4 8 Residential 20 104,870 2.41 139,983 3.21 43 2,795 482 7.4 10 Residential 32 87,475 2.01 108,030 2.48 69 4,485 372 11.6 11 Residential 32 86,994 2.00 99,166 2.28 69 4,485 342 11.6 R.O.W.N/A N/A N/A N/A 495,956 11.39 N/A N/A 1,708 1.2 Total 132 13.37 26.61 285 18,525 3,993 49.6 14 Residential 140 182,825 4.20 220,710 5.07 304 19,760 760 50.6 15 Residential 90 109,458 2.51 109,458 2.51 195 12,675 377 32.4 16 Commercial N/A 70,480 1.62 88,005 2.02 N/A 4,860 303 15.4 R.O.W.N/A N/A N/A N/A 228,538 5.25 N/A N/A 787 0.6 Total 230 8.33 14.85 499 37,295 2,227 99.0 9 Residential 49 134,021 3.08 237,220 5.45 106 6,890 817 18.0 12 Residential 40 104,146 2.39 104,146 2.39 87 5,655 359 14.6 R.O.W.N/A N/A N/A N/A 248,235 5.70 N/A N/A 855 0.6 Total 89 5.47 13.54 193 12,545 2,031 33.2 19 Residential 52 183,260 4.21 219,586 5.04 113 7,345 756 19.1 20 Residential 21 57,963 1.33 82,173 1.89 46 2,990 283 7.8 21 Residential 24 86,739 1.99 104,956 2.41 52 3,380 361 8.8 R.O.W.N/A N/A N/A N/A 157,639 3.62 N/A N/A 543 0.4 Total 97 7.53 12.96 211 13,715 1,943 36.1 22 Residential 21 57,659 1.32 112,075 2.57 46 2,990 386 7.8 23 Residential 14 74,124 1.70 74,124 1.70 30 1,950 255 5.1 R.O.W.N/A N/A N/A N/A 73,015 1.68 N/A N/A 251 0.2 Total 35 3.02 5.95 76 4,940 892 13.1 17 Commercial N/A 176,868 4.06 176,868 4.06 N/A 12,180 609 38.5 18 Commercial N/A 131,497 3.02 131,497 3.02 N/A 9,060 453 28.6 R.O.W.N/A N/A N/A N/A 31,127 0.72 N/A N/A 107 0.1 Total 0 7.08 7.79 0 21,240 1,169 67.2 24 Residential 122 168,111 3.86 168,111 3.86 265 17,225 579 44.1 25 Residential 34 82,401 1.89 157,709 3.62 74 4,810 543 12.6 R.O.W.N/A N/A N/A N/A 127,975 2.94 N/A N/A 441 0.3 Total 156 5.75 10.42 339 22,035 1,563 57.0 26 Residential 14 85,959 1.97 90,898 2.09 30 1,950 313 5.2 27 Residential 10 66,949 1.54 66,949 1.54 22 1,430 231 3.8 28 Residential 6 83,216 1.91 83,216 1.91 13 845 287 2.3 R.O.W.N/A N/A N/A N/A 94,680 2.17 N/A N/A 326 0.2 Total 30 5.42 7.71 65 4,225 1,157 11.5 1 Commercial N/A 205,948 4.73 256,908 5.90 N/A 14,190 885 45.0 13 Commercial N/A 130,612 3.00 220,927 5.07 N/A 9,000 761 28.7 R.O.W.N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Total 0 7.73 10.97 0 23,190 1,646 73.7 769 63.70 110.79 1,668 157,710 16,621 440.3 7 6 8 9 Totals: 2 4 5 1 3 Blackwood Groves Subdivision Table 2 ‐ Sanitary Sewer Flow Analysis ‐ By Phase March 24, 2021