HomeMy WebLinkAbout004 Site Plan NarrativePage 1 of 2
PROJECT NARRATIVE
Blackwood Groves
Blackwood Grove Sub Ph 1 & 9, S24, T02 S,
R05 E, Block 1, Lot 1 & Block 13, Lot 1
Site Plan Application
November 27th, 2024
Introduction
Blackwood Groves is a thoughtfully designed residential neighborhood development located on a 7.8-acre
property east of S. 19th Ave, north of Blackwood Rd, and west of Canter Ave, within the City of
Bozeman. The project consists of 216 multi-family residences, a clubhouse with fitness and pool
amenities, and outdoor pickleball and bocce ball courts. The property is zoned REMU. The Applicant
intends to initiate a concept and site plan review to allow for the development and construction of a new
for-rent multi-family housing neighborhood.
Project Type and Intent
This project will be comprised of nine (9) 3-story 24-plex apartment buildings and a clubhouse with
fitness and pool amenities. The 3-story buildings will comply with the height requirements outlined in
the UDC. The neighborhood will provide a mix of 1, 2, and 3-bedroom homes, all of which have been
proven to be attractive to residents. The municipal requirement for parking will be met through a
combination of on-site surface, and on-street parking spaces. The community will have its primary
entrances off Canter Ave and Victoria St.
The residences have been arranged on site to take advantage of the unique location. Multiple buildings,
sidewalks, and an east/west public walkway will help to organize the site. A 30’ public access easement,
oriented east/west and fronted by architecture, will increase connectivity through the site and break down
the scale of the overall community. An amenity package featuring a clubhouse with an indoor
kitchen/lounge, game room, fireplace lounge, and fitness area will be included. Outdoor amenities will
include a covered patio, pool, spa, fire pit, cornhole, bocce ball court, and pickle ball court.
The exterior design of the buildings will promote a distinctive multi-family structure with materials,
massing, and details that are compatible with the surrounding residential neighborhoods. The
architectural character of the buildings will emphasize horizontal forms and vary the roof architecture to
create visual interest. The three-story massing is broken up with a variety in detailing, materials, color,
and elevation forms. All open space features, driveways, and walks will be maintained by Avenue 5, a
property management group.
Phasing
The project is intended to be built in two (2) phases, with sub-phases for each building within each phase.
The phases will be separated by Victoria Street, with Phase I to the north of Victoria Street and Phase II
to the south. Phase I will include five (5) 3-story 24-plex residential buildings and a clubhouse. Phase II
will include four (4) 3-story 24-plex residential buildings and a pickle ball court. Each building will have
its own subphase. For example, Building A will be Phase IA. Occupancy for each building will be based
on these subphases. Please see sheet C1.03 – Phasing Plan for a breakdown of each phase and subphase.
Trash
There are a total of six trash enclosures located throughout the site. Trash on-site will be collected from
five of the six enclosures and transported to the main enclosure on the northeast end of the site by the
property management group, Avenue 5. This northeast enclosure will serve as the sole pickup location for
City collection services. The location of this enclosure has been deliberately designed to provide
convenient accessibility for City collection vehicles, providing plenty of space and maximizing traffic
flow within the site.
Page 2 of 2
Parking
Parking for the project meets minimum code requirements:
Parking Summary:
Vehicle Parking:
Required: 359 spaces
Provided: 316 on-site
42 street
Total: 358 spaces (100% of required)
Open Space
Open Space for the project exceeds minimum code requirements:
Open Space Summary:
Required: 27,600 SF
Provided:
Balconies: 4,545 SF
Area A: 27,174 SF
Area B: 8,758 SF
Total: 40,477 SF (147% of required)
Site Improvements
Civil improvements to the site will include water, sewer, and storm drain infrastructure, as well as
hardscape including parking lots, sidewalks and trails. The existing water and sewer mains in the adjacent
streets surrounding the site have been previously stubbed out to allow for connection to the proposed
development. Water, fire, and sewer services will be provided to each building from mains within the site.
Stormwater Management
In order to efficiently address stormwater for the site and adjacent streets, the site will be graded to use a
combination of surface and subsurface drainage to ensure proper flow of stormwater throughout the site.
Stormwater from the site will flow to existing retention ponds to the north, south, and west of the site.
These retention ponds have been sized to provide enough capacity to accommodate runoff from the
project site. Please reference the Stormwater Design Report for capacity calculations. Please reference the
stormwater maintenance plan outlining the responsible parties for maintenance of these facilities.
Conclusion
We believe this addition to the community will not only help diversify the housing options in Bozeman
but will also help to synergize and solidify the adjacent neighborhoods. We are excited about the
prospect of building this creative, high-quality neighborhood in Bozeman and look forward to working
with City staff throughout the review process.