August 30',2024
City of Bozeman Planning Department
20 East Olive
Bozeman, MT 59715
RE: Blackwood Groves Site Plan Submittal
Dear City of Bozeman:
On behalf of our client,Fourth Avenue Capital,we are submitting a Site Plan application for review for the
proposed"Blackwood Groves" subdivision located on Block 1,Lot 1 and Block 13,Lot 1 of the
Blackwood Grove Subdivision Phase 1 and 9,north of Blackwood Road and Victoria Street, and east of S.
19'Ave in Bozeman,MT.
Access to the proposed development will be from Canter Ave and Victoria Street. Site improvements
include 9 residential apartment buildings, a clubhouse and maintenance building.
Included in our submittal package are the following items:
Site Plan Submittal
Documents
001 Cover Letter
002 Development Review Application
003 Concept Plan RTC Narrative
004 Site Plan Narrative
005 Parking Calcs
006 Open Space Calcs
007 Snow Storage Report
008 Stormwater Design Report
009 Master Water Design Report
010 Master Sanitary Sewer Design Report
011 Master Traffic Impact Study
012 Traffic Impact Study Addendum
013 Parks Master Plan
014 Existing Plat
015 Form N1
016 Form SP
017 Groundwater Monitoring
018 Concurrent Construction Request Letter
Drawings
Civil
001 C0.0—Cover Sheet
002 CO.1 —Existing Conditions
003 C0.2—Construction Management Plan
004 C1.0—Overall Site Plan
K•\Bozeman\Fourth Avenue Capital\2023531 Blackwood Grove Blk 1&13 Site Plan\l lRegulatory\Site Plan\Site\Initial\Cover Letter.docx
895 Technology Blvd Suite 203 ♦ Bozeman,MT 59718 ♦ (406) 586-0262
Project:Blackwood Groves
Page 2 of 3
005 C 1.01 —Enlarged Site Plan—North
006 C 1.02—Enlarged Site Plan—South
007 C 1.03 —Phasing Plan
008 C1.1 —Dimension Plan
009 C 1.2—Open Space
010 C 1.3—Grading Plan—North
011 C 1.4—Grading Plan—South
012 C 1.5—Snow Storage
013 C2.0—Site Details
014 C2.1 —Site Details
015 C2.2—Site Details
Landscape
016 L1-00—Materials Plan
017 L1-01 —Materials Plan
018 L1-02—Materials Plan
019 L1-03—Materials Plan
020 L1-04—Materials Plan
021 L2-00—Irrigation Plan
022 L2-01 —Irrigation Plan
023 L2-02—Irrigation Plan
024 L2-03 —Irrigation Plan
025 L2-04 -Irrigation Plan
026 L2-05—Irrigation Notes
027 L3-00—Planting Plan
028 L3-01 —Planting Plan
029 L3-02 -Planting Plan
030 L3-03 -Planting Plan
031 L3-04 -Planting Plan
032 L5-01 —Site Details
033 L5-02—Site Details
034 L5-03 —Irrigation Details
035 L5-04 -Irrigation Details
036 L5-05—Planting Details
Architectural
037 1 —Cover Sheet
038 27—Project Site Plan
039 28—Design Guidelines
040 29—Design Guidelines
04130—Design Guidelines
042 31 —Design Guidelines
043 32—Design Guidelines
044 33 —Design Guidelines
045 34—Design Guidelines
046 35—Design Guidelines
047 36—Design Guidelines
048 37—Building Plans—Type 01
049 38—Building Plans—Type 01
050 39—Exterior Elevations—Type 01
051 40—Building Plans—Type 02
895 Technology Blvd Suite 203 Bozeman,MT 59718 (406)586-0262
Project:Blackwood Groves
Page 3 of 3
052 41 —Building Plans—Type 02
053 42—Exterior Elevations—Type 02
054 43 —Building Plans—Type 03
055 44—Building Plans—Type 03
056 45—Exterior Elevations—Type 03
057 46—Building Plans—Clubhouse
058 47—Building Plans—Clubhouse
059 48—Exterior Elevations—Clubhouse
060 49—Bldg Plans and Elevations—Maintenance Building and Trash Enclosure
061 50—Site Lighting Fixtures
Electrical
062 E0.02—Luminaire Schedule
063 E1.00—Site Lighting Plan—Overall
064 E1.01 —Site Lighting Plan—North
065 E1.02—Site Lighting Plan—South
066 E 1.01 —Site Photometrics Plan—North
067 E1.02—Site Photometrics Plan- South
Please review the submitted material at your earliest convenience. If you have any questions or need
additional information please feel free to contact us at 406-586-0262.