Loading...
HomeMy WebLinkAbout001 Cover Letter MADISON ENGINEERING ENGINEERING 895 Technology Boulevard,Suite 203,Bozeman,MT 59718 1406.586.0262 August 30',2024 City of Bozeman Planning Department 20 East Olive Bozeman, MT 59715 RE: Blackwood Groves Site Plan Submittal Dear City of Bozeman: On behalf of our client,Fourth Avenue Capital,we are submitting a Site Plan application for review for the proposed"Blackwood Groves" subdivision located on Block 1,Lot 1 and Block 13,Lot 1 of the Blackwood Grove Subdivision Phase 1 and 9,north of Blackwood Road and Victoria Street, and east of S. 19'Ave in Bozeman,MT. Access to the proposed development will be from Canter Ave and Victoria Street. Site improvements include 9 residential apartment buildings, a clubhouse and maintenance building. Included in our submittal package are the following items: Site Plan Submittal Documents 001 Cover Letter 002 Development Review Application 003 Concept Plan RTC Narrative 004 Site Plan Narrative 005 Parking Calcs 006 Open Space Calcs 007 Snow Storage Report 008 Stormwater Design Report 009 Master Water Design Report 010 Master Sanitary Sewer Design Report 011 Master Traffic Impact Study 012 Traffic Impact Study Addendum 013 Parks Master Plan 014 Existing Plat 015 Form N1 016 Form SP 017 Groundwater Monitoring 018 Concurrent Construction Request Letter Drawings Civil 001 C0.0—Cover Sheet 002 CO.1 —Existing Conditions 003 C0.2—Construction Management Plan 004 C1.0—Overall Site Plan K•\Bozeman\Fourth Avenue Capital\2023531 Blackwood Grove Blk 1&13 Site Plan\l lRegulatory\Site Plan\Site\Initial\Cover Letter.docx 895 Technology Blvd Suite 203 ♦ Bozeman,MT 59718 ♦ (406) 586-0262 Project:Blackwood Groves Page 2 of 3 005 C 1.01 —Enlarged Site Plan—North 006 C 1.02—Enlarged Site Plan—South 007 C 1.03 —Phasing Plan 008 C1.1 —Dimension Plan 009 C 1.2—Open Space 010 C 1.3—Grading Plan—North 011 C 1.4—Grading Plan—South 012 C 1.5—Snow Storage 013 C2.0—Site Details 014 C2.1 —Site Details 015 C2.2—Site Details Landscape 016 L1-00—Materials Plan 017 L1-01 —Materials Plan 018 L1-02—Materials Plan 019 L1-03—Materials Plan 020 L1-04—Materials Plan 021 L2-00—Irrigation Plan 022 L2-01 —Irrigation Plan 023 L2-02—Irrigation Plan 024 L2-03 —Irrigation Plan 025 L2-04 -Irrigation Plan 026 L2-05—Irrigation Notes 027 L3-00—Planting Plan 028 L3-01 —Planting Plan 029 L3-02 -Planting Plan 030 L3-03 -Planting Plan 031 L3-04 -Planting Plan 032 L5-01 —Site Details 033 L5-02—Site Details 034 L5-03 —Irrigation Details 035 L5-04 -Irrigation Details 036 L5-05—Planting Details Architectural 037 1 —Cover Sheet 038 27—Project Site Plan 039 28—Design Guidelines 040 29—Design Guidelines 04130—Design Guidelines 042 31 —Design Guidelines 043 32—Design Guidelines 044 33 —Design Guidelines 045 34—Design Guidelines 046 35—Design Guidelines 047 36—Design Guidelines 048 37—Building Plans—Type 01 049 38—Building Plans—Type 01 050 39—Exterior Elevations—Type 01 051 40—Building Plans—Type 02 895 Technology Blvd Suite 203 Bozeman,MT 59718 (406)586-0262 Project:Blackwood Groves Page 3 of 3 052 41 —Building Plans—Type 02 053 42—Exterior Elevations—Type 02 054 43 —Building Plans—Type 03 055 44—Building Plans—Type 03 056 45—Exterior Elevations—Type 03 057 46—Building Plans—Clubhouse 058 47—Building Plans—Clubhouse 059 48—Exterior Elevations—Clubhouse 060 49—Bldg Plans and Elevations—Maintenance Building and Trash Enclosure 061 50—Site Lighting Fixtures Electrical 062 E0.02—Luminaire Schedule 063 E1.00—Site Lighting Plan—Overall 064 E1.01 —Site Lighting Plan—North 065 E1.02—Site Lighting Plan—South 066 E 1.01 —Site Photometrics Plan—North 067 E1.02—Site Photometrics Plan- South Please review the submitted material at your earliest convenience. If you have any questions or need additional information please feel free to contact us at 406-586-0262. Sincerely, Madison Engineering/WWC osh Wolfram 895 Technology Blvd Suite 203 Bozeman,MT 59718 (406)586-0262