Loading...
HomeMy WebLinkAbout021 - L 000 - Overall Site PlanREDREDNORCANNORNORPRAPRAPRANORREDNORE ASPEN STREET(35' WIDTH - 60' ROW)6'150 SF150 SF150 SF100 SF100 SF100 SF100 SF100 SF100 SFDN DNDN ALLEY(RECORD WIDTH 16')SDSDSDSDCOMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COM M GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE[]WWWWWWWWWWWWWWWWWWWWWWWWSD SD SDSSOHEOHEWWWWWWWWWWSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSIRIRIRUGEUGEUGEUGEUGEUGEGASGASGASGASGASGASGASUGEUGEUGEW W SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSUGEUGEUGEUGEUGEUG E UG E UGE UGE UGE SD SD SDSS SDSDWWSS SSSS SDSDCOMM COMM COMM COMM COMM COMM COMM COMMSDSD SDSDSDSDSDSD SD UNIT A-21081 BED / 1 BATHUNIT A-11061 BED / 1 BATHUNIT B-11041 BED / 1 BATH +DENUNIT D-11022 BED / 2 BATH+ DENUNIT D-31012 BED / 2 BATH+ DENUNIT B-3TYPE A1031 BED / 1 BATH+ DENUNIT A-41071 BED / 1 BATHUNIT D-21092 BED / 2 BATH + DEN1,541 SF1,023 SF846 SF834 SF1,742 SF832 SF1,104 SF1,467 SF689 SFUNIT A-31051 BED / 1 BATH855 SF1,5121551 SF759 SF1234',0(1S,21S $5( 7<3,&$//< 7$.(1 72 *5,', F$&( 2F 0$S215<, F$&( 2F &21&5(7(, F$&(2F S78' 25 '225:,1'2: 23(1,1*S ',0(1S,21S 72 23(1,1*S $5( 120,1$/, 9(5,F<$// 23(1,1*S :,7+ 528*+ 23(1,1* 5(48,5(0(17S0$S215< ,S ',0(1S,21(' 120,1$//< 72 7+( F$&( $&78$/ ',0(1S,21S :,// %( 12F25 ,1S,'( ',0(1S,21S $1' 0$S215< 23(1,1*S, $1' 12 F25 287S,'( ',0(1S,21S(;,S7,1* &21S758&7,21 72 5(0$,1 S+2:1 +$/F721(, 7<3S(( S+((7 $100 F25 :$// 7<3( '(S,*1$7,21SS(( S+((7 $100 F25 :$// 7<3('(S,*1$7,21SSHEET NOTES - FLOOR PLANREDREDNOR CANNORNORPRAPRAPRANORREDNORIDA AVE(45' ROW)CPUE UE UEGASGASGASUEUEGASGAS UEGASGASUEGAS GAS GASUEUEUEUEUEGASGASUEUEGASGASGASUEGASUE UEGAS14'19'-9"50'-3"249'-11"141'-10"249'-11"141'-3"10'OPEN SPACETYPETOTALOPEN SPACEREQUIREDOPEN SPACEPROVIDED5,600SF7,668SFGROUND LEVELPRIVATEPATIOSCOMMONOUTDOORCOMMONINDOOR(SEE ARCH)1,050SF1,018 SF2,800SFPRIVATEBALCONIES(SEE ARCH)2,800SFNOTE:SEE ARCHITECTURAL OPENSPACE SHEET FOR FURTHERBREAKDOWN OF OPEN SPACEAREAS ON LEVELS 2-5.NOTE:TOTAL INCLUDES SPABALCONY ON LEVEL 2.SEE ARCH.PROJECT ZONING(B-2M ZONING) RESIDENTIAL MIXED USEBOZEMAN, MONTANA CODE OF ORDINANCESBOZEMAN YARDSSITE INFORMATIONACRES: 0.89 ACRESZONING: B-2MLANDSCAPE APPROVAL PATHWAY: PERFORMANCETOTAL LANDSCAPE AREA: SEE LANDSCAPE COVERAGEPLAN L003DROUGHT TOLERANT SPECIES:REQUIRED: A LANDSCAPE PLAN MUST PROVIDE 75% ORGREATER OF THE PROPOSED TREES AND SHRUBS ASDROUGHT TOLERANT SPECIES.PROVIDED: 75% OF THE PROPOSED TREES AND SHRUBSARE DROUGHT TOLERANT PER THE MONTANA PLANT ANDNURSERY ASSOCIATION AND CITY OF BOZEMAN PLANTLIST. SEE SHEET L002 FOR PLANT SCHEDULES THATIDENTIFY ALL PROPOSED DROUGHT TOLERANT TREES.STREET TREE REQUIREMENTSREQUIRED: ONE LARGE CANOPY TREE FOR EACH 50 FEETOF TOTAL STREET FRONTAGE ROUNDED TO THE NEARESTWHOLE NUMBER.STREET FRONTAGE FOR E ASPEN ST: 250 LF = 5 TREESSTREET FRONTAGE FOR N IDA AVE: 141 LF = 3 TREESPROVIDED:-5 TREES FOR E ASPEN ST-3 TREES FOR N IDA AVESITE TREE REQUIREMENTSSEE SCHEDULE ON L003RESIDENTIAL BIKE PARKING:-REQUIRED: MINIMUM OF 1 BIKE PARKING SPACE TOBE PROVIDED FOR EACH RESIDENTIAL UNIT: 45RESIDENTIAL UNITS REQUIRE 45 BIKE PARKINGSPACES.PROVIDED: 54 INTERIOR BICYCLE SPACES, 5 EXTERIORBICYCLE RACKS = 10 BICYCLE PARKING SPACES. TOTAL 64BICYCLE PARKING SPACES.COMMERCIAL BIKE PARKINGREQUIRED: 1 BICYLCLE PARKING SPACE PER 1,000 SF OFGROSS FLOOR AREA. 1,551 SF REQUIRE 2 BICYCLEPARKING SPACE.PROVIDED: COMMERCIAL: 6 PROVIDED (3 RACKS).SERVICE ENCLOSURES LANDSCAPINGREQUIRED & PROVIDED: LANDSCAPE SCREENING AT LEAST5 FEET IN WIDTH IS PROVIDED.UTILITY METERS LANDSCAPING-REQUIRED AND PROVIDED: IF SUCH ELEMENTS AREMOUNTED IN A LOCATION VISIBLE FROM THE STREET,PEDESTRIAN PATHWAY, SHARED OPEN SPACE, ORSHARED AUTO COURTYARDS, THEY MUST BESCREENED WITH VEGETATION AND / OR INTEGRATEDINTO THE BUILDING'S ARCHITECTURETRANSFORMER LANDSCAPINGNORTHWESTERN ENERGY:POLICY IS FOR PLANTING OF BUSHES OR SHRUBS TAMINIMUM WORKING SPACE FOR A PAD-MOUNTEDTRANSFORMER IS 4 FEET ON SIDES ADN BACK PORTION OFTHE CONCRETE PAD AND 10 FEEET OF CLEARANCE ON THEFRONT SIDE OF THE PAD WHERE THE TRANSFORMERDOORS ARE LOCATED.SOIL AMENDMENT REQUIREMENTS:A.AMEND EXISTING TOPSOIL AT A RATE OF 4CY/1000SF.COMPOST MUST MEET THE STATE OF MONTANA'SCOMPOST REQUIREMENT FOR SOIL AMENDMENTAND SHALL BE SPREAD AND MIXED EVENLY INTO THETOP SIX (6) INCHES OF SOIL;B.PERFORM A SOIL TEST AND AMEND EXISTING SOIL ASRECOMMENDED BY SOIL TEST; ORC.IMPORT TOPSOIL THAT HAS BEEN AMENDEDPURSUANT TO THE RECOMMENDATIONS OF A SOILTEST.TO BE PROVIDED: (A) AMEND EXISTING TOPSOIL AT A RATEOF 4CY/1000SF.Overall Site PlanL 000168032N1L0001/16" = 1'-0"Overall Site PlanPROJECT OWNERJackadoo LP805 N Ida AveBozeman, MT 59715ENGINEERSTAHLY ENGINEERING851 Bridger Dr #1Bozeman, MT 59715(406) 522 - 8594ARCHITECTSMA428 E Mendenhall StBozeman, MT 59715(406) 219 - 2216LANDSCAPE ARCHITECTDESIGN 5, LLCTroy Scherer111 North Tracy AveBozeman, MT 59715(406) 587 - 4873SHEET INDEXL000-OVERALL SITE PLANL001-NOTES AND SCHEDULESL002-NOTES AND SCHEDULESL003-LANDSCAPE COVERAGE PLANL300-PLANTING ENLARGEMENT - WESTL301-PLANTING ENLARGEMENT - EASTL500-LANDSCAPE DETAILSL501-LANDSCAPE DETAILSL502-LANDSCAPE DETAILSL503-LANDSCAPE DETAILSL504-LANDSCAPE DETAILSL505-LANDSCAPE DETAILSL506- LANDSCAPE DETAILSL600-IRRIGATION PLAN NOTES AND CODEL601-OVERALL IRRIGATION PLANL602-IRRIGATION PLAN NORTHL603-IRRIGATION PLAN SOUTHL700-IRRIGATION DETAILSL701-IRRIGATION DETAILS1CONCRETE WALK, SEE CIVILKEYNOTES2CONCRETE STEPS, SEE CIVIL/STRUCTURAL ALSO3IRRIGATION CONNECTION POINT, VERIFY WITH MEP AND GC4FRACTURED CONCRETE PAVING5ACCENT BOULDERS6(NOT USED)7DROUGHT TOLERANT BLVD SEED, SEE L002 AND L3008PEDESTRIAN RAMP, SEE CIVIL9BIKE PARKING10CUSTOM BOULDER FIRE PIT (NATURAL GAS)11EMERGENCY GAS SHUT OFF, VERIFY WITH MEP AND ARCH.12MOUNTAIN MEADOW SEED MIX13SYNTHETIC LAWN14STEEL PLANTER, TYP. SEE L200'S FOR DIMENSIONS15BOARD FORM CONCRETE WALL35design5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\brick capital block 104\autocad\01_sheets\block104_south_landscape.dwg Bozeman Yards South Bozeman, Montana AVD TMS/AVD NO T F O R C O N S T R U C T I O N1/29/25SPR RC2VICINITY MAPE TAMARACK STN WALLACE AVE PROJECT SITEFRONT STN IDA AVEE ASPEN ST16PRIVATE PAVER PATIO (WET SET)17BOCCE COURT18(NOT USED)19STORM WATER RETENTION, SEE CIVIL20PARKING GARAGE ACCESS, SEE ARCH21GENERATOR ROOM, SEE ARCH/MEP22TRANSFORMER, SEE MEP AND ARCH23METER WALL, SEE MEP AND ARCHSCREENING FENCE, TYP2411122425CONCRETE ADA RAMP, SEE CIVIL2627UTILITY BOX, SEE CIVILFIRE HYDRANT, SEE CIVIL2829313233PERMEABLE PAVERS, SEE CIVIL5PROPERTY LINE10' UTILITY EASEMENTIRRIGATION CONDUIT34RECLAIMED GRANITE BLOCKNATURAL CASCADING BOULDER WALL783515151010111321416435TIMBER BENCH, TYP.1617182120PRIVATE PEDESTAL PAVER PATIO191919234024242420202026272830293031323433VISION TRIANGLE, SEE CIVIL36ROOF ABOVE, SEE ARCH3737TRASH ROOM381616IMPROVEMENTS TO PARK TO BE SUBMITTED IN SEPARATE DRAWING SETFDC AND FIRE RISER ROOM3938GAS FIRE PIT, TYP4023239189232316PEDESTRIAN LIGHTS, TYP4141IMPROVEMENTS NORTH OF PROPERTY LINE TOBE SUBMITTED IN SEPARATE SITE APPLICATIONS241823PRIVACY DELINEATION FENCE4242RESIDENTIAL OPEN SPACE: (SEE ARCHITECTURE ALSO)244033918918362542231836716181833