Loading...
HomeMy WebLinkAbout012.36 - L3.1 - PARK IRRIGATION PLANASPEN STREETEXISTING IRRIGATIONCONTROLLEREXISTING IRRIGATIONWELLFRONT STREET1L4.1BACKFLOW PREVENTION /PRECAST CONC.2L4.1VALVE BOX PLACEMENT3L4.1DOUBLE VALVE BOXFSRS4L4.1RAIN BIRD RAIN SENSOR9L4.1POP-UP SPRAY HEAD1L4.2TREE RING DRIPLINEALL LANDSCAPING OUTSIDE PARKBOUNDARY SHALL HAVEIRRIGATION CONSTRUCTED BYADJACENT PROPERTY OWNERIRRIGATION TO BEPROVIDED BY ADJACENTPROPERTY OWNER ANDCONSTRUCTED WITHON-SITE IMPROVEMENTS.SEE ON-SITE PLANS FORDETAILS.114"0.1811"6.4321"0.2731"6.0241"6L4.1ELECTRIC CONTROL VALVE5L4.1QUICK COUPLER VALVE8L4.1TRENCHING DETAILSF10L4.1DRIPLINE FLUSH VALVENUMBERMODELSIZETYPEGPMHEADSDESIGN PSIFRICTION LOSSVALVE LOSSPSIPSI @ POCPRECIP1RAIN BIRD XCZ-100-PRF1"DRIP RING0.18230535.0390.44 in/h2RAIN BIRD PESB1"TURF ROTARY6.4313350.161.7336.941.01.15 in/h3RAIN BIRD XCZ-100-PRF1"DRIP RING0.27330535.0390.44 in/h4RAIN BIRD PESB1"TURF ROTARY6.0211350.081.7236.840.90.61 in/hSYMBOLMANUFACTURER/MODEL/DESCRIPTIONQTYPSIRAIN BIRD R-VAN14 1806-SAM-P45TURF ROTARY, 8FT.-14FT. 45-270 DEGREES AND 360 DEGREES.HAND ADJUSTABLE MULTI-STREAM ROTARY W/1800 TURFSPRAY BODY ON 6IN. POP-UP, WITH CHECK VALVE AND 45 PSIIN-STEM PRESSURE REGULATOR. 1/2IN. NPT FEMALE THREADEDINLET.2435SYMBOLMANUFACTURER/MODEL/DESCRIPTIONQTYPSIRAIN BIRD XCZ-100-PRFMEDIUM FLOW DRIP CONTROL KIT, 1IN. DV VALVE, 1IN.PRESSURE REGULATING FILTER, 40PSI PRESSURE REGULATOR.5 GPM-20 GPM.2RAIN BIRD XFCV-06-12 DRIP RING530SYMBOLMANUFACTURER/MODEL/DESCRIPTIONRAIN BIRD PESB1IN., 1-1/2IN., 2IN., 3IN., 3IN. PLASTIC INDUSTRIAL REMOTECONTROL VALVE. LOW FLOW OPERATING CAPABILITY, GLOBECONFIGURATION. WITH SCRUBBER TECHNOLOGY FOR RELIABLEPERFORMANCE IN DIRTY WATER IRRIGATION APPLICATIONS.RAIN BIRD 44-LRC1IN. BRASS QUICK-COUPLING VALVE, WITHCORROSION-RESISTANT STAINLESS STEEL SPRING, LOCKINGTHERMOPLASTIC RUBBER COVER, AND 2-PIECE BODY.ZURN 350 1"3/4IN. - 2IN. DOUBLE CHECK VALVE ASSEMBLY BACKFLOWPREVENTER W/ EZSWAP.RAIN BIRD RSD-BEXRAIN SENSOR, WITH METAL LATCHING BRACKET, EXTENSIONWIRE.RAIN BIRD UFS-1001IN. ULTRASONIC FLOW SENSORS, WITH GLASS FILLED NYLONBODY. OPERATING RANGE .3 GPM-50 GPM. SIZE FOR FLOW NOTACCORDING TO PIPE SIZE.IRRIGATION LATERAL LINE: HDPE PE3608 SIDR 15IRRIGATION MAINLINE: HDPE PE3608 SIDR 15PIPE SLEEVE: PVC SCHEDULE 4014 ADJ14 FRSFS#"#Valve NumberValve SizeValve FlowValve Callout#P.O.C. NUMBER: 01Water Source Information:EXISTING WELL.ASSUMED 35 GPM @ 45 PSICONTRACTOR TO VERIFYFLOW AVAILABLECustom Max Flow:35 GPMFlow Available35 GPMPRESSURE AVAILABLEStatic Pressure at POC:46 PSIPressure Available:46 PSIDESIGN ANALYSISMaximum Station Flow:6.43 GPMFlow Available at POC:35 GPMResidual Flow Available:28.57 GPM Design Pressure:35 PSI Friction Loss:0.15 PSI Fittings Loss:0.01 PSI Elevation Loss:0 PSI Loss through Valve:1.73 PSIPressure Req. at Critical Station:36.9 PSILoss for Fittings:0.01 PSILoss for Main Line:0.05 PSILoss for POC to Valve Elevation:0 PSILoss for Backflow:4 PSICritical Station Pressure at POC:40.9 PSIPressure Available:46 PSIResidual Pressure Available:5.05 PSILIMIT OF WORKPROPOSED PARK BOUNDARYNUMBERMODELTYPEPRECIPIN./WEEKMIN./WEEKGAL./WEEKGAL./DAY1RAIN BIRD XCZ-100-PRFDRIP RING0.44 in/h113624.58.162RAIN BIRD PESBTURF ROTARY1.15 in/h1533411143RAIN BIRD XCZ-100-PRFDRIP RING0.44 in/h113636.712.24RAIN BIRD PESBTURF ROTARY0.61 in/h199596199TOTALS:424998.1332.7SP RC3PARK IRRIGATION PLAN 9A/9E SCHEDU/E,RR,*AT,ON SCHEDU/E,RR,*AT,ON NOTES1.THIS SYSTEM DESIGN ASSUMES A MINIMUM DYNAMIC PRESSURE FOR THE IRRIGATION SYSTEM OF 45 PSI, AT A MAXIMUM DISCHARGE OF 35 GPM AT THE EXISTING 1" POINT-OF-CONNECTION. CONTRACTOR TO VERIFY PRESSURE ANDFLOW ON SITE PRIOR TO CONSTRUCTION.2.THE EXISTING IRRIGATION SYSTEM POINT-OF-CONNECTION IS AT THE WELL LOCATED AT THE APPROXIMATE LOCATION SHOWN. INSTALL BACKFLOW PREVENTION/ANTI SIPHON ASSEMBLY PER CITY & STATE BUILDING CODES.CONTRACTOR TO VERIFY EXACT LOCATION OF P.O.C. WITH OWNERS REPRESENTATIVE.3.THE NEW IRRIGATION SHALL USE THE EXISTING CONTROLLER. CONTRACTOR TO VERIFY EXISTING CONTROLLER IS IN PROPER WORKING CONDITION AND MAKE ADJUSTMENTS TO FIT THE NEW SYSTEM PROPERLY.4.COORDINATE UTILITY LOCATES OF ALL UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION.5.DO NOT PROCEED WITH THE INSTALLATION OF THE IRRIGATION SYSTEM WHEN IT IS OBVIOUS IN THE FIELD THAT OBSTRUCTIONS OR GRADE DIFFERENCES EXIST THAT MIGHT NOT HAVE CONSIDERED IN THE DESIGN PROCESS. IFDISCREPANCIES IN CONSTRUCTION DETAILS, LEGEND, NOTES OR SPECIFICATIONS ARE DISCOVERED, BRING ALL SUCH OBSTRUCTIONS OR DISCREPANCIES TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE.6.DRAWINGS ARE DIAGRAMMATIC. THEREFORE, THE FOLLOWING SHOULD BE NOTED:A.ALTHOUGH IRRIGATION COMPONENTS MAY BE SHOWN OUTSIDE OF PLANTING AREAS FOR CLARITY, INSTALL IRRIGATION PIPE, WIRING, VALVES, ETC. IN LANDSCAPED AREAS AND WITH PROPERTY LINES.B.TREE AND SHRUB LOCATION SHOWN ON LANDSCAPE PLANS TAKE PRECEDENCE OVER IRRIGATION EQUIPMENT LOCATIONS. AVOID CONFLICTS BETWEEN THE IRRIGATION SYSTEM, PLANTING MATERIALS, AND ARCHITECTURAL FEATURES.C.USE ONLY STANDARD TEES AND ELBOW FITTINGS.7.PROVIDE THE FOLLOWING COMPONENTS TO THE OWNER PRIOR TO THE COMPLETION OF THE PROJECT:A.TWO (2) OPERATING KEYS FOR EACH TYPE OF MANUALLY OPERATED VALVES AND CONTROLLERS.8.THE IRRIGATION CONTRACTOR IS RESPONSIBLE FOR THE INSTALLATION OF IRRIGATION SLEEVING. SLEEVES ARE REQUIRED FOR BOTH PIPING AND ELECTRICAL WIRING AT EACH HARDSCAPE CROSSING. COORDINATE INSTALLATION OFSLEEVING WITH OTHER TRADES. ANY PIPE OR WIRE WHICH WAS NOT INSTALLED WILL REQUIRE HORIZONTAL BORING BY THE IRRIGATION CONTRACTOR. IRRIGATION CONTRACTOR TO COORDINATE WITH SITE CONTRACTOR FOR TIMEOF INSTALLATION AND LOCATION OF ANY SLEEVE AND/OR CONDUIT INSTALLATION.9.INSTALL ALL ELECTRICAL POWER TO THE IRRIGATION CONTROL SYSTEM IN ACCORDANCE WITH THE NATIONAL ELECTRIC CODE AND ALL APPLICABLE LOCAL ELECTRIC UTILITY CODES.10.INSTALL TWO (2) #14 AWG CONTROL WIRES FROM CONTROLLER LOCATION TO EACH DEAD-END OF MAINLINE FOR USE AS SPARE INCASE OF CONTROL WIRE FAILURE. COIL 3 FEET OF WIRE IN VALVE BOX.11.A COMPLETE LIST OF EQUIPMENT, SHOP DRAWING CATALOG CUTS, LAYOUT PERFORMANCE AND MAINTENANCE WARRANTY INFORMATION SHALL BE SUBMITTED TO THE OWNERS REPRESENTATIVE FOR APPROVAL PRIOR TO COMMENCINGWORK. SAID INFORMATION SHALL BE COMPILED ALONG WITH AS-BUILT DRAWINGS AND MAINTENANCE INSTRUCTION AND SUBMITTED TO OWNER'S REPRESENTATIVE FOR APPROVAL AT FINAL COMPLETION. CONTRACTOR SHALLDEMONSTRATE COMPLETE OPERATING SYSTEM AND MAINTENANCE TO OWNER'S REPRESENTATIVE AND OWNER'S MAINTENANCE AND OPERATING PERSONNEL.12.CONTRACTOR SHALL BE REQUIRED TO START UP AND WINTERIZE SYSTEM FOR THE WARRANTY PERIOD, ONE YEAR FROM FINAL COMPLETION, AND MAKE ALL ADJUSTMENTS AND REPAIRS REQUIRED TO INSURE EFFICIENT OPERATION.13.CONTRACTOR SHALL PROVIDE ALL REQUIRED IRRIGATION WATER CONTROL, FILTRATION PRESSURE REGULATION, WASTE AND DRAINAGE REQUIREMENTS OF A COMPLETE MAINTENANCE SYSTEM.14.CONTRACTOR SHALL PROVIDE AN INDIVIDUAL ZONE FOR TREES. THIS ZONE SHALL BE UTILIZED DURING PERIODS OF DROUGHT WHEN OVERHEAD IRRIGATION IS REQUIRED TO BE TURNED OFF.15.ALL LANDSCAPING OUTSIDE OF THE PARK BOUNDARY SHALL HAVE IRRIGATION CONSTRUCTED BY ADJACENT PROPERTY OWNERS.,RR,*AT,ON CR,T,CA/ANA/YS,S,RR,*AT,ON :ATERRE4U,REMENTSBASED ON CITY OF BOZEMAN WATER BUDGET CALCULATOR:TOTAL WATER USE = 20,667 GALLONS A YEARGAL/SF AVERAGE = 9.2NOTE: PUBLIC PARKS ARE EXEMPT FROM THE LANDSCAPEREQUIREMENTS OF THE "CITY OF BOZEMAN LANDSCAPE ANDIRRIGATION PERFORMANCE AND DESIGN STANDARDSMANUAL."/E*ENDUULC010SCALE: 1" = 10'20510FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION NORTHERN PACIFIC ADDITION, S 06, T 02 S, R 06 E BLOCK 104, LOT 7-16, 17-26 PARK IRRIGATION PLAN BOZEMAN YARDS SOUTH OFFSITE IMPROVEMENTS BOZEMAN, MTL3.1EC 06020_11_IR_PROD.DWG CE 8/20/24 SP2 SUBMITTAL 1/29/25 - - - - - SP RC3 - - - - - -- 06020.11 :ATER,N* SCHEDU/Ep:\06020_11_block_104_offsite_design_and_ca\CADD_C3D\production_dwg\06020_11_IR_PROD.dwg, L3.1 PARK IRRIGATION PLAN, 2/21/2025 12:10:49 PM, amartoncik, 1:1