HomeMy WebLinkAbout015 North & West Elev W
U
31 �3 Z
0W
WallLU
z Q
0❑❑ >LU
/^,U) / 0 J
Hardie Plank Lap Siding W L.
Y� w�
Iu
M U cfl w O
Ilk
Secon
d Floor U m
id
St n in S a M tal R of
12-111/8" V
J
Corrogated Metal Siding
® No. REVISION/ISSUE DATE
Grol.M&Floor
'Grade Level
Cedar Shingle Siding
Cedar Board&Bat Siding If
NORTH ELEVATION ORIENTATION STAMP
Foundation OL
5'-0"
30yr Arc Shingle
Timberlberline::Charcoal
Charcoal
24GA'VINTAGE'
-0 Standing Seam Metal Roof
0'-0" ALL DRAWINGS ARE THE PROPERTY OF THE DESIGNER
AND THEYARE NOT TO BE REPRODUCED IN WHOLE OR IN
PART WITHOUT THE WRITTEN CONSENT OF THE DESIGNER
SCALE: 1/4°= 1,o°
CONTRACTOR TO C AlD VERIFY ALL DIMENSIONS
BEFORE COMMENCINGING TO REPORT ANY
DISCREPANCIES TO THE DESIGNER
OIL Wall
z3'-3" Kevin & Dianne Click
Hardie Plank Lap Siding
24GA'VINTAGE'
Standing Seam Metal Roof 406-579-2803
Second Floor Ilk PROJECT NAME:
14'j W.1(8„
12-111/8"
Corrogated Metal Siding
CLIENT:
Kevin & Dianne Click
Ell Cedar Shingle Siding
Tff�� 07DRAWING:
GroAX9�IFloor North &West Elevation
All
1'
Grade Level SCALE: 1/4"=V-0" DATE: Nov.2,2024
Cedar Board&Bat Siding
Cedar Shingle Siding DRAWN BY: SHEET:
#DRAWN BY
WEST ELEVATION CHECKED BY
#CHECKED BY
APPROVED BY: 80
#APPROVED BY
OIL Foundation oI