Loading...
HomeMy WebLinkAbout015 North & West Elev W U 31 �3 Z 0W WallLU z Q 0❑❑ >LU /^,U) / 0 J Hardie Plank Lap Siding W L. Y� w� Iu M U cfl w O Ilk Secon d Floor U m id St n in S a M tal R of 12-111/8" V J Corrogated Metal Siding ® No. REVISION/ISSUE DATE Grol.M&Floor 'Grade Level Cedar Shingle Siding Cedar Board&Bat Siding If NORTH ELEVATION ORIENTATION STAMP Foundation OL 5'-0" 30yr Arc Shingle Timberlberline::Charcoal Charcoal 24GA'VINTAGE' -0 Standing Seam Metal Roof 0'-0" ALL DRAWINGS ARE THE PROPERTY OF THE DESIGNER AND THEYARE NOT TO BE REPRODUCED IN WHOLE OR IN PART WITHOUT THE WRITTEN CONSENT OF THE DESIGNER SCALE: 1/4°= 1,o° CONTRACTOR TO C AlD VERIFY ALL DIMENSIONS BEFORE COMMENCINGING TO REPORT ANY DISCREPANCIES TO THE DESIGNER OIL Wall z3'-3" Kevin & Dianne Click Hardie Plank Lap Siding 24GA'VINTAGE' Standing Seam Metal Roof 406-579-2803 Second Floor Ilk PROJECT NAME: 14'j W.1(8„ 12-111/8" Corrogated Metal Siding CLIENT: Kevin & Dianne Click Ell Cedar Shingle Siding Tff�� 07DRAWING: GroAX9�IFloor North &West Elevation All 1' Grade Level SCALE: 1/4"=V-0" DATE: Nov.2,2024 Cedar Board&Bat Siding Cedar Shingle Siding DRAWN BY: SHEET: #DRAWN BY WEST ELEVATION CHECKED BY #CHECKED BY APPROVED BY: 80 #APPROVED BY OIL Foundation oI