Loading...
HomeMy WebLinkAbout012 2nd Flr Plan 14'-4" 5'-6" W >Rooftop Deck:Exterior Beams to drawn at 14"IBeam;actual V size TBD Garage#2 I I j I Below Rooftop Dedk U } �co Q w LLw Steel Beam Structure I N LLI for O Rooftop Deck 1 Cfl m (tb — — Zo i I — — — — - -I M � U- - — - — - — - — - — - — - — - — - — - - — - — - - - - - — - — - — - — Rooftop Deck Shed Roof Above 27 9'-51/2" I I U1 1 1 1 I 1 g' No. REVISION/ISSUE DATE I 1 — — — — — — — — — — — — — — — — — — — — — — — — I Do x wjnm,D 1 rr I Down I rn — /3'OH o ORIENTATION STAMP vc �+ TYp- O� — — — — — — — /Open to Below/ 3D36 ✓ kro+6 3as I — — I I I Exterior Wall $I N 111 Above ry ALL DRAWINGS ARE THE PROPERTY OF THE DESIGNER AND THEYARE NOT TO BE REPRODUCED IN WHOLE OR IN PART WITHOUT THE WRITTEN CONSENT OF THE DESIGNER 2868 CONTRACTOR TO CHECKAND VERIFYALL DIMENSIONS Bedroom 3 BEFORE COMMENCING WORKAND TO REPORTANY ® DISCREPANCIES TO THE DESIGNER ® Bath#3 1 1 Kevin & Dianne Click 12'-0" I I I 1 00 1'g" 406-579-2803 I I 0 M Great cI et 1 - I Cl) Room GD CIO PROJECT NAME: CLICK RESIDENCE 1 616 E. Fridley St. Bedroom#2 Bozeman 1 1 ® 1 o CLIENT: �I Kevin & Dianne Click 11 Bath#2 m1 I DRAWING: — — — — — — 2nd FLOOR PLAN - - - - - - --- - - - - 1 3036 —6 —6 3056 3056 1 1 1 1 SCALE: 1/4"=V-0" DATE: Nov.2,2024 — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — —L — — — — — — 3'RoR OH(typ) DRAWN BY: SHEET: #DRAWN BY 16'-7 1/4" 15'-4 5/8" 12'-11 9/16" A4 _0' CHECKED BY: Ir Ir 10'-0" #CHECKED BY 44'-11 1/2" APPROVED BY: S CAL E: 1/4" = 1 0„ #APPROVED BY