Loading...
HomeMy WebLinkAbout045 - L 701 - Irrigation Details START CONNECTIONMALE ADAPTER AND TEEAREA PERIMETER18Ͳ FOR ROW SPACINGPERIMETER LATERALS2Ͳ TO 4Ͳ FROM EDGEDRIPLINEMANUAL FLUSH VALVELATERAL DRIP LINE1L701NTS DÈ¿Æ IÈÈ¿½·Ê¿ÅÄ - Eĺ F»»º L·ÏÅËÊSTART CONNECTIONAREA PERIMETERDRIPLINE LATERALMANUAL FLUSH VALVESUPPL HEADERƭ DRIP LATERAL LINETEEEHAUST HEADER2L701NTSN»Ê·¼¿Ã DÈ¿Æ IÈÈ¿½·Ê¿ÅÄ - IÈÈ»½ËÂ·È AÈ»· L·ÏÅËÊGALVANIED TIEDOWN STAKE:PRESSURECOMPENSATINGEMITTER MODULE14Ͳ VINLDISTRIBUTION TUBINGDIFFUSER BUG CAPTREEERI-TUBE 700COMPRESSIONADAPTERPVC FITTING AND RISERPVC LATERAL PIPECOMPRESSION FLUSHTREE PLANDIFFUSER BUG CAP:14Ͳ TUBING STAKE:MULCH AS SPECIFIEDWEED CONTROL FABRIC14Ͳ VINL DISTRIBUTIONTUBINGERI-TUBE 700SINGLE-OUTLET EMITTERTREE SECTIONNOTE:1.DIRECT TWO ƺ2ƻ 1GPH EMITTERS PER SHRUB AND FOUR ƺ4ƻ1GPH EMITTERS PER TREE2.EMITTERS SHOULD BE PLACED INSIDE TREE WELL, HALFWABETWEEN THE BASE OF THE TREE AND EDGE OF ITSCANOP.3.RUN ERI-TUBE 700 DISTRIBUTION TUBING NO MORE THAN2ʼ0ͱ LENGTH4.RUN 14Ͳ VINL DISTRIBUTION TUBING NO MORE THAN ʼͱLENGTH3L701NTSDÈ¿Æ ¼ÅÈ TÈ»»É14Ͳ TUBING DRIP EMITTERTUBING STAKEAMENDED SOIL 17MM BLANK PLD TUBING14Ͳ BARBED CONNECTOR4L701NTSEÿÊÊ»È ÅÄ SÊ·Á»IÈÈ¿½·Ê¿ÅÄ D»Ê·¿ÂÉL 701© 2021 Lake|Flato Architects, Inc.3 1 1 T H I R D S T R E E TS A N A N T O N I O, T E X A S 7 8 2 0 5P 2 1 0. 2 2 7. 3 3 3 5 F 2 1 0. 2 2 4. 9 5 1 5w w w . l a k e f l a t o . c o mSET ISSUE DATESDATEISSUEPROJ. ARCHITECTDRAWN BY:L|F PROJ. NO.NEST PARTNERS113 E. OAK STREET 4BBOZEMAN, MT 5971504/22/22100% DESIGN DEVELOPMENT04/10/2350% CONSTRUCTION DOCUMENTS05/08/2375% CONSTRUCTION DOCUMENTS06/16/23100% CONSTRUCTION DOCUMENTSTHIS SQUARE APEARS 1/2"x1/2"ON FULL SIZE SHEETSCIVIL: TD&H ENGINEERING234 E. BABCOCK, SUITE 3BOZEMAN, MT 59715LANDSCAPE: DESIGN 5111 N. TRACY ST.BOZEMAN, MT 59715STRUCTURAL: IMEG108 WEST BABCOCK STBOZEMAN, MT 59715MEP: ENERGY12042 STADIUM DRIVE, SUITE 2BOZEMAN, MT 59715BUILDING KEYBCD11/01/23100% SCHEMATIC DESIGN - A01/26/24100% DESIGN DEVELOPMENT - ABCDE05/10/24100% CONSTRUCTION DOCUMENTS-PHASE 1Autodesk Docs://Nest Bozeman/Nest Bozeman–LFA–Arch–Main–R22.rvt 4/17/2024 3:02:51 PM100% CONSTRUCTIONDOCUMENTS - PHASE 2DEC 06, 202421043GOTSWALLACEWORKS801 N. WALLACE AVEBOZEMAN, MTEA07/17/2450% CONSTRUCTION DOCS - PHASE 208/02/2490% CONSTRUCTION DOCS - PHASE 208/23/24100% CONSTRUCTION DOCS - PHASE 21TBDADDENDUM #01 A045