Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
042 - L 600 - Irrigation Notes & Legends
GENERAL IRRIGATION NOTES AND SPECIFICATIONS1.ALL VALVE BOES TO BE STANDARD SIE OR LARGER.2.IRRIGATION MAIN LINE TO BE 1Ͳ SCH 40 PVC PIPE.3.ALL TREES TO BE IRRIGATED THROUGH DEDICATED BUBBLERS. BUBBLERS TO BE EVENLDISTRIBUTED AROUND BASE OF TREE WITH FOUR ƺ4ƻ EVENL SPACED BUBBLER EMITTERS.4.TREES AND SHRUBS PLACED WITHIN PLANTING BEDS MA UTILIE DRIP IRRIGATION. DRIPIRRIGATION TO BE AD USTED PER REQUIREMENTS OF EACH INDIVIDUAL PLANT.ʼ.ALL SHRUBS OUTSIDE OF DEDICATED PLANTING BEDS TO HAVE DEDICATED BUBBLERS. BUBBLERSTO BE EVENL DISTRIBUTED AROUND BASE OF SHRUB WITH TWO ƺ2ƻ EVENL SPACED BUBBLEREMITTERS.ʽ.DRIP LINE TO BE COMPLETEL BURIED UNDER MULCH LAER.7.ALL MIED SHRUB AND PERENNIAL PLANTINGS TO BE IRRIGATED WITH DEDICATED DRIP TUBING.DRIP EMITTERS TO BE AD USTED PER REQUIREMENTS OF EACH INDIVIDUAL PLANT.EMITTERS PER PLANT TPE:PERENNIALS & SHRUBS - RAINBIRD FD- 0.ʽ GPH -12Ͳ EMITTER SPACING.SHRUBS- ƺ2ƻ 1.0 GPH EMITTERSƭ0.2ʼ-1.0 GPM BUBBLERSTREES- ƺ4ƻ 1.0 GPH EMITTERSƭ0.2ʼ-1.0 GPM BUBBLERSdždždžTREES UTILIING DRIP IN PLANTING BEDS MA NEED ADDITIONAL EMITTERS TO MEET WEEKL WATERING REQUIREMENTS.8.LAWN AND SEED AREAS TO BE IRRIGATED WITH SPRA OR ROTOR OVERHEAD IRRIGATION AS INDICATED ON PLAN.ˀ.ALL HEADS MUST ACHIEVE HEAD-TO-HEAD COVERAGE FOR SOD AREAS.10.SSTEM SHALL UTILIE WEATHER ƭ MOISTURE MONITOR.11.BACKFLOW ASSEMBL AND BLOWOUT ASSEMBL SHALL BE LOCATED IN MECHANICAL ROOM ORAPPROVED ETERNAL GRADEBO. IT IS THE RESPONSIBILIT OF THE LANDSCAPE CONTRACTORTO COORDINATE INSTALLATION PER LOCAL CODES AND ORDINANCES AS WELL AS WITHARCHITECTURE AND ALL OTHER TRADES.12.POWER SOURCE FOR IRRIGATION CONTROLLER TO BE COORDINATED WITH ELECTRICALENGINEER, ELECTRICAL CONTRACTOR AND LANDSCAPE CONTRACTOR.13.DO NOT INSTALL IRRIGATION SSTEM WHEN OBVIOUS OBSTRUCTIONS OR GRADE CHANGES AREPRESENT.14.ALL INFORMATION TO BE FIELD-VERIFIED B CONTRACTOR PRIOR TO INSTALLATION.1ʼ.THE CONTRACTOR SHALL MAINTAIN AN ACCURATE & CURRENT ͱAS-BUILTͱ IRRIGATION PLAN ONSITE AT ALL TIMES.1ʽ. IF NOT WITHIN LIMITS OPERATING PRESSURE, CONTRACTOR MUST CONTACT LANDSCAPEARCHITECT.17.IRRIGATION SLEEVING TO BE PROVIDED B CIVIL CONTRACTORƭGCƒ SET SLEEVES UNDER ROADSPER PLAN COORDINATE WITH LANDSCAPEƭIRRIGATION INSTALLER PRIOR TO POURING ROADS ORCONCRETE.SMBOLSIEDETAILDESCRIPTIONIRRIGATION LEGENDBACKFLOW PREVENTERWATTS 00ˀ RP OR EQUAL1Ͳ2, L700BFIRRIGATION CONTROLLERHUNTER ICC2 OR EQUAL1, L700CWEATHER STATIONHUNTER MWS-FR OR EQUAL3, L700CONNECTION POINTDRIP CONTROL VALVEHUNTER PC, IC DRIP CONTROL OREQUALˀ, L700WCP1Ͳ PVC MAINLINE, SCH 40 PVCʼ, L7001Ͳ LATERAL LINE, SCH 40 PVC OR ƺPEƻʼ, L700HUNTER, HDL-0ʽ-12, DRIP LINE OR EQUAL1-2, L701IRRIGATION SLEEVE, 4Ͳ MIN. SCH 40 PVCʽ, L700VALVE SCHEDULEIRR MAINIRRIRRDDZONE #/TYPESIZEGPMQT1111ʼSEE PLANSEE PLANSEE PLANSEE PLANSEE PLAN8, L7004, L70021QUICK COUPLER FOR BLOW OUT USERAINBIRD HQ44-RC OR EQUALISOLATION VALVEƭGATE VALVE DRAINNIBCO T-113 BRONE GATE VALVE OREQUALONE TPESS̏ MP ROTATOR OR SPRAY NOZZLE (SEE IRRIGATION LEGEND)R= ROTARY IRRIGATION HEADSD= DRIP IRRIGATIONDT = DRIP TREE IRRIGATIONTREE DRIP LINE, SOFT WALL DRIP TUBINGDDD SEE PLAN3-4, L7001Ͳ1Ͳ4ͲIÈÈ¿½·Ê¿ÅÄ NÅÊ»É &L»½»ÄºÉL ʽ00© 2021 Lake|Flato Architects, Inc.3 1 1 T H I R D S T R E E TS A N A N T O N I O, T E X A S 7 8 2 0 5P 2 1 0. 2 2 7. 3 3 3 5 F 2 1 0. 2 2 4. 9 5 1 5w w w . l a k e f l a t o . c o mSET ISSUE DATESDATEISSUEPROJ. ARCHITECTDRAWN BY:L|F PROJ. NO.NEST PARTNERS113 E. OAK STREET 4BBOZEMAN, MT 5971504/22/22100% DESIGN DEVELOPMENT04/10/2350% CONSTRUCTION DOCUMENTS05/08/2375% CONSTRUCTION DOCUMENTS06/16/23100% CONSTRUCTION DOCUMENTSTHIS SQUARE APEARS 1/2"x1/2"ON FULL SIZE SHEETSCIVIL: TD&H ENGINEERING234 E. BABCOCK, SUITE 3BOZEMAN, MT 59715LANDSCAPE: DESIGN 5111 N. TRACY ST.BOZEMAN, MT 59715STRUCTURAL: IMEG108 WEST BABCOCK STBOZEMAN, MT 59715MEP: ENERGY12042 STADIUM DRIVE, SUITE 2BOZEMAN, MT 59715BUILDING KEYBCD11/01/23100% SCHEMATIC DESIGN - A01/26/24100% DESIGN DEVELOPMENT - ABCDE05/10/24100% CONSTRUCTION DOCUMENTS-PHASE 1Autodesk Docs://Nest Bozeman/Nest Bozeman–LFA–Arch–Main–R22.rvt 4/17/2024 3:02:51 PM100% CONSTRUCTIONDOCUMENTS - PHASE 2DEC 06, 202421043GOTSWALLACEWORKS801 N. WALLACE AVEBOZEMAN, MTEA07/17/2450% CONSTRUCTION DOCS - PHASE 208/02/2490% CONSTRUCTION DOCS - PHASE 208/23/24100% CONSTRUCTION DOCS - PHASE 21TBDADDENDUM #01 A1042