Loading...
HomeMy WebLinkAbout041 - L 502 - Details1Lʼ023ƭ4Ͳ ̏ 1ͱ-0ͲT¿Ã¸»È B»Ä¹¾, TÏÆ.SECTIONELEVATION1ͱ-ʽͲʽͲ 1ͱ 2ͱ1ͱPER PLANS4Ͳ4ͲPAVEMENT PER HARDSCAPE PLANS AND DETAILS38Ͳ CORTEN STEEL BASE PER DETAILS AND FABRICATOR SHOP DRAWINGS.12Ͳ SQUARE HEARTWOOD TIMBER BENCHES.12ͲNOTE: ALL TIMBERS TO RECEIVE 34Ͳ CHAMFER ON ALL ETERIOR, TOP FACING EDGES.TIMBER TO BE WESTERN LARCH, CIRCLE SAWN WITH ABRASIVE BRUSH TO REMOVE SPLINTERS ƺCOCONUT COIR ORSIMILARƻ. TALL EARTH ͱWEATHERED WOOD FINISHͱ OR SIMILAR B FABRICATOR.8ͲʽͲ2Lʼ023ƭ4Ͳ ̏ 1ͱ-0ͲT¿Ã¸»È B»Ä¹¾, MÅËÄʿĽ P·ʻ, TÏÆ.PLANELEVATIONSECTION1ͱ-11ͲʼͲ1ͱ-1ͲʼͲ1ͱ ʽͲʽͲ NOTE: ALL FINAL HARDWARE SELECTIONS ƺMOUNTING PLATES, BOLTS, EPO OROTHERƻ TBD PENDING FABRICATOR SHOP DRAWINGS.BOLT PATTERN CENTERLINEFINAL FITURE HARDWARE TBDFITURE BOLT TO BENCHSUPPORT BELOW38Ͳ WALL THICKNESS CORTENMOUNTING PLATEHEARTWOOD TIMBER BENCHLEVELING WASHERS ASNEEDED FOR PLUMB, LEVELINSTALLATION OF TIMBERBENCH ABOVEHEARTWOOD TIMBER BENCHLEVELING WASHERS12Ͳ THREADED ROD WITH EPOTO BENCH ABOVE. FINAL CONNECTIONPER FABRICATOR SHOP DRAWINGS.12Ͳ BOLT THROUGH MOUNTING PLATETO SUPPORT BELOW, TP. BOLT TPEAND LENGTH TBD PER FABRICATOR SHOPDRAWINGS.CORTEN MOUNTING PLATE3Lʼ023ƭ4Ͳ ̏ 1ͱ-0ͲT¿Ã¸»È B»Ä¹¾ ¿Ä P·ÄÊ»È, TÏÆ.WESTERN LARCH HEARTWOOD TIMBER BENCH,TP.AD ACENT PLANTING PER PLANTING PLANS.CORTEN MOUNTING PLATE, TP.12Ͳ BOLT THROUGH MOUNTING PLATE TO SUPPORTBELOW, TP. EPANSION OR EPOCONNECTION TBD PER FABRICATOR SHOP DRAWINGS.PRECAST CONCRETE SLEEPER OVER COMPACTAGGREGATE BASE, TP.4Lʼ023ƭ4Ͳ ̏ 1ͱ-0ͲT¿Ã¸»È B»Ä¹¾ OÌ»È BÈ¿¹Á P·Ì»Ã»ÄÊ, TÏÆ.WESTERN LARCH HEARTWOOD TIMBER BENCH,TP.AD ACENT PLANTING PER PLANTING PLANS.CORTEN MOUNTING PLATE, TP.12Ͳ BOLT THROUGH MOUNTING PLATE AND BRICKTO CONCRETE BELOW. POST INSTALLEPO OR EPANSION CONNECTION TBDPER FABRICATOR SHOP DRAWINGS.BRICK PAVEMENT OVER CONCRETE WITHSTEEL RETAINING EDGE PER PLANSAND DETAILS.ʼLʼ023ƭ4Ͳ ̏ 1ͱ-0ͲT¿Ã¸»È B»Ä¹¾ OÌ»È CÅĹȻʻ S¿º»Í·ÂÁ, TÏÆ.WESTERN LARCH HEARTWOOD TIMBER BENCH,TP.CORTEN MOUNTING PLATE, TP.12Ͳ BOLT THROUGH MOUNTING PLATE TO CONCRETE BELOW.POST INSTALL EPO OR EPANSION CONNECTION TBDPER FABRICATOR SHOP DRAWINGS.CONCRETE SIDEWALK, TP.8ͲʽͲL·ÄºÉ¹·Æ»D»Ê·¿ÂÉL ʼ02© 2021 Lake|Flato Architects, Inc.3 1 1 T H I R D S T R E E TS A N A N T O N I O, T E X A S 7 8 2 0 5P 2 1 0. 2 2 7. 3 3 3 5 F 2 1 0. 2 2 4. 9 5 1 5w w w . l a k e f l a t o . c o mSET ISSUE DATESDATEISSUEPROJ. ARCHITECTDRAWN BY:L|F PROJ. NO.NEST PARTNERS113 E. OAK STREET 4BBOZEMAN, MT 5971504/22/22100% DESIGN DEVELOPMENT04/10/2350% CONSTRUCTION DOCUMENTS05/08/2375% CONSTRUCTION DOCUMENTS06/16/23100% CONSTRUCTION DOCUMENTSTHIS SQUARE APEARS 1/2"x1/2"ON FULL SIZE SHEETSCIVIL: TD&H ENGINEERING234 E. BABCOCK, SUITE 3BOZEMAN, MT 59715LANDSCAPE: DESIGN 5111 N. TRACY ST.BOZEMAN, MT 59715STRUCTURAL: IMEG108 WEST BABCOCK STBOZEMAN, MT 59715MEP: ENERGY12042 STADIUM DRIVE, SUITE 2BOZEMAN, MT 59715BUILDING KEYBCD11/01/23100% SCHEMATIC DESIGN - A01/26/24100% DESIGN DEVELOPMENT - ABCDE05/10/24100% CONSTRUCTION DOCUMENTS-PHASE 1Autodesk Docs://Nest Bozeman/Nest Bozeman–LFA–Arch–Main–R22.rvt 4/17/2024 3:02:51 PM100% CONSTRUCTIONDOCUMENTS - PHASE 2DEC 06, 202421043GOTSWALLACEWORKS801 N. WALLACE AVEBOZEMAN, MTEA07/17/2450% CONSTRUCTION DOCS - PHASE 208/02/2490% CONSTRUCTION DOCS - PHASE 208/23/24100% CONSTRUCTION DOCS - PHASE 21TBDADDENDUM #01 A041