Loading...
HomeMy WebLinkAbout039 - L 500 - Details1Lʼ003ƭ8Ͳ ̏ 1ͱ-0ͲTÏÆ. D»¹¿ºËÅËÉ TÈ»» B&B P·ÄʿĽMIN. 2  ROOT BALL DIAM.FINISH GRADEELEVATION OF TREE FLARE TO BE 2Ͳ ABOVEFINISH GRADE ELEVATION. REMOVE ECESSSOIL FROM ROOT BALL, AS REQUIRED, INORDER TO EPOSE FLAREPLANTING PIT. PIT TO HAVE BROADL SLOPINGSIDESƒ SCARIF SIDES OF PIT. SOIL AT THEBOTTOM OF THE PIT TO BE SUFFICIENTLCOMPACTED TO PREVENT SETTLEMENT.ECAVATE PIT 2 - ʼ DIAMETER OF ROOT BALL.REMOVE ALL DEBRIS AND ROCKS ƺLARGERTHAN 2Ͳ DIAM.ƻ FROM PIT PRIOR TO PLANTINGBACKFILL SOIL PER CIT OF BOEMANSOIL REQUIREMENTSNATIVE SOIL 2Ͳ  2Ͳ  8ͱ HARDWOOD STAKES DRIVEN MIN. 24ͲBELOW FINISHED GRADE AND MIN. ʽͱ HEIGHTABOVE FINISHED GRADE. STAKES TO BE SETOUTSIDE OF TREE DRIP LINE. STAKES SHALLNOT PENETRATE ROOT BALL. REMOVE STAKESAFTER TWO EARSROOT BALL3Ͳ - 4Ͳ LAER OF BARK MULCH. DO NOTALLOW MULCH TO COME IN CONTACTWITH TRUNK3Ͳ HIGH ROUND-TOPPED CIRCULAR RING FORWATER RETENTION. FORM RING OF SOILALONG THE PERIMETER OF THE PLANTING PIT10Ͳ GAUGEWIRE2Lʼ003ƭ4Ͳ ̏ 1ͱ-0ͲTÏÆ. S¾È˸ P·ÄʿĽ, Iĺ¿Ì¿ºË·Â P·ÄʿĽ P¿ÊMIN. 2  ROOT BALL DIAM.FINISH GRADEELEVATION OF ROOT CROWN TO BE 1Ͳ - 2ͲABOVE FINISH GRADE ELEVATION3Ͳ - 4Ͳ LAER OF BARK MULCH. DO NOTALLOW MULCH TO COME IN CONTACTWITH SHRUB STEMSNATIVE SOILPLANTING PIT. PIT TO HAVE BROADLSLOPING SLIDESƒ SCARIF SIDES OF PIT.SOIL AT THE BOTTOM OF THE PIT TO BESUFFICIENTL COMPACTED TO PREVENTSETTLEMENT. ECAVATE PIT 2 - ʼDIAMETER OF ROOT BALL. REMOVE ALLDEBRIS AND ROCKS ƺLARGER THAN 2ͲDIAM.ƻ FROM PIT PRIOR TO PLANTINGROOT BALLBACKFILL SOIL PER CIT OFBOEMAN SOIL REQUIREMENTS3Ͳ HIGH ROUND-TOPPED CIRCULAR RINGFOR WATER RETENTION. FORM RING OFSOIL ALONG THE PERIMETER OF THEPLANTING PIT3Lʼ003ƭ4Ͳ ̏ 1ͱ-0ͲTÏÆ. P·ÄʿĽ B»ºNOTE:1.REMOVE ALL DEBRIS AND STONES ƺLARGER THAN 2Ͳ DIAMETERƻ2.ALL PLANTING BEDS TO BE ECAVATED 18Ͳ DEEP. SCARIF SIDES AND BOTTOMTO REMOVE GLAING. ALL BEDS TO RECEIVE NEW, AMENDED SOIL PER COB SOILREQUIREMENTS FOR A COMBINED SETTLED DEPTH OF 18Ͳ. RAKE SMOOTH TOMATCH FINAL GRADING PLAN.3.INSTALL WEED-CONTROL BARRIERS BEFORE MULCHING. COMPLETEL COVERAREA TO BE MULCHED, OVERLAPPING EDGES A MINIMUM OF ʽƢ. PIN SEAMS AT AMINIMUM OF EVER 12Ƣ O.C. SPACING FOR ENTIRE LENGTH OF SEAM. NO FABRICNEEDED IN HEAVIL PLANTED BEDS. BOULEVARDS AND PARKING LOT BEDSMUST BE INSTALLED WITH WEED BARRIER FABRIC.FINISH GRADE3Ͳ - 4Ͳ MULCH LAER,MULCH TPE PER PLAN.DO NOT ALLOW MULCHTO COME IN CONTACTWITH SHRUB STEMS18Ͳ OF TOP SOIL PER COBSOIL REQUIREMENTSNATIVE SOILPLANT CROWN TO BEPLANTED AT ORSLIGHTL ABOVE FINISHGRADE AT MAIMUM OF1Ͳ-2Ͳ.ʼLʼ001Ͳ ̏ 1ͱ-0ͲN·ÊËÈ·Â SÊ»»Â Eº½¿Ä½ - P·ÄʿĽ B»ºFINISH GRADENOTE:1.REMOVE ALL DEBRIS AND STONES ƺLARGER THAN 3Ͳ DIAMETERƻ2.ALL PLANTING BEDS TO BE ECAVATED 18Ͳ DEEP. SCARIF SIDES ANDBOTTOM TO REMOVE GLAING. ALL BEDS TO RECEIVE NEW, AMENDED SOILPER COB SOIL REQUIREMENTS FOR A COMBINED SETTLED DEPTH OF 18Ͳ.RAKE SMOOTH TO MATCH FINAL GRADING PLAN1Ͳ REVEALNATIVE SOIL31ʽͲ  4Ͳ NATURAL STEEL EDGING TACWELDED TO ʶ4 REBAR DRIVENMIN. 18Ͳ REBAR SPACED 24Ͳ O.C.3Ͳ - 4Ͳ LAER OF MULCH. MULCHTPE PER PLAN.LAWN OR NATIVE SEED& SOIL, PER PLANTOPSOIL, SEE NOTE 24Lʼ003ƭ4Ͳ ̏ 1ͱ-0ͲP·ÄʿĽ B»º ·Ê P·Ì»Ã»ÄÊ Eº½»1ͲREVEAL - SEE NOTE 2ʽͲ - 12Ͳ SEENOTE 34ʼͮNOTE:1.SLOPE PLANTED AREAS AWA FROM PAVED AREAS2.FINISH GRADE AT PAVEMENT EDGE MUST BE AT A LEVEL SUCH THAT THEESTABLISHED PLANTED SURFACE WILL BE ONE ƺ0.ʼ-1ƻ INCH BELOW TOP OFPAVEMENT FOR A MINIMUM DISTANCE OF SI ƺʽƻ FEET FROM THE EDGE3.INSTALL WEED-CONTROL BARRIERS BEFORE MULCHING. COMPLETEL COVERAREA TO BE MULCHED, OVERLAPPING EDGES A MINIMUM OF ʽƢ. PIN SEAMS AT AMINIMUM OF EVER 12Ƣ O.C. SPACING FOR ENTIRE LENGTH OF SEAM. NO FABRICNEEDED IN HEAVIL PLANTED BEDS. BOULEVARDS AND PARKING LOT BEDS MUSTBE INSTALLED WITH WEED BARRIER FABRIC.ˀ0̈ - ˀʼ̈ COMPACTED SUBGRADENATIVE SOILPAVEMENT EDGE - SEE PLANS ANDPAVING DETAILS FOR ADDITIONALINFORMATION. SEE ALSO EDGINGDETAILS AS APPLICABLEAMENDED TOPSOIL3Ͳ - 4Ͳ MULCH LAER,MULCH TPE PER PLANFINISH GRADE, SEE NOTE 2ʽͲ DEPTH OF 34Ͳ MINUS WASHEDAGGREGATE BASE MATERIALFINISH GRADECONCRETE SIDEWALKʽͲ DEPTH OF 34 MINUSAGGREGATE BASEMATERIALCOMPACTEDSUBGRADE8Lʼ001Ͳ ̏ 1ͱ-0ͲR¿Ä½ B¿Á» R·¹ÁFRONT ELEVATIONʽͲ27 14ͲPLAN VIEWNOTE: INSTALL BACK RACK PERMANUFACTURER SPECIFICATION.SPACING PER PLAN SPACING PER PLANAD ACENT PAVERS,SEE DETAILSʽͲ27 14ͲʽͲ4ͲʽͲ4ͲCONCRETE BIKERACK FOUNDATIONBIKE RACK IN PAVER ELEVATIONʽLʼ001Ͳ ̏ 1ͱ-0ͲW¿Âº P·ÄʿĽ PŹÁ»Ê, TÏÆ.1Ͳ REVEAL FROM PATIO FFE TO TOPOF MULCH, TP.2Ͳ OF MULCH MATERIAL.3Ͳ SAND, WASHED AND FREE FROMORGANIC MATERIAL AND DEBRIS, TP.ʽͲ OF TOPSOILSCARIF TOPSOIL INTO NATIVE SOIL TOA DEPTH OF 12Ͳ, TP.SHEETS Lʼ00 LANDSCAPE DETAILS NOTES:1.LANDSCAPE CONTRACTOR SHALL ASSUREPERCOLATION OF ALL PLANTING PITS PRIOR TOINSTALLATION2.ALL CONTAINMENT MATERIALS AROUND ROOT BALL TOBE REMOVED PRIOR TO INSTALLATION2.1.CAREFULL REMOVE ALL TREATED BURLAPƺROT-PROOFƻ AT PLANTING2.2.UNTREATED BURLAP MA PARTIALL REMAIN ONROOT BALL. REMOVE BURLAP FROM TOP HALF OFROOT BALL BEFORE COMPLETION OF PLANTING3.CONTAINER PLANTS: CAREFULL CUT AN CIRCLINGROOTS TO PREVENT PLANT FROM BECOMING ROOTBOUND4.PRUNE ALL PLANT MATERIAL PRIOR TO PLANTING, ON ANAS-NEEDED BASIS. REMOVE DEAD AND ƭ OR DAMAGEDBRANCHES, LIMBS, AND LEAVESʼ.ALL TREES TO BE STAKED, REMOVE STAKES AFTER TWOEARS OR ONCE TREE OUT-GROWS TREE STRAPSʽ.PROVIDE TREE GUARDS ON ALL DECIDUOUS TREESOUTSIDE OF PLANTING BEDS7.PROVIDE WINTER TRUNK PROTECTION FOR NORWAMAPLES TO PREVENT FROST CRACKS AND SUNSCALD.8.INSTALL WEED-CONTROL BARRIERS BEFORE MULCHING.COMPLETEL COVER AREA TO BE MULCHED,OVERLAPPING EDGES A MINIMUM OF ʽƢ. PIN SEAMS AT AMINIMUM OF EVER 12Ƣ O.C. SPACING FOR ENTIRELENGTH OF SEAM. NO FABRIC NEEDED IN HEAVILPLANTED BEDS. BOULEVARDS AND PARKING LOT BEDSMUST BE INSTALLED WITH WEED BARRIER FABRIC.1Ͳ MULCH PER PLAN 1Ͳ BELOWCURB AND SIDEWALK. ROCKMULCH NOT TO ECEED 2ͲDIAMETER.CONCRETE CURB SEE CIVILCONCRETE SIDEWALK SEE CIVILPLANTING SOIL UNDERPLANTING BEDS SEEPLANTING DETAILS7Lʼ003ƭ4Ͳ ̏ 1ͱ-0ͲBÅË»̷Ⱥ M˹¾ ·Äº P·ÄʿĽ B»ºÉL·ÄºÉ¹·Æ»D»Ê·¿ÂÉL ʼ00© 2021 Lake|Flato Architects, Inc.3 1 1 T H I R D S T R E E TS A N A N T O N I O, T E X A S 7 8 2 0 5P 2 1 0. 2 2 7. 3 3 3 5 F 2 1 0. 2 2 4. 9 5 1 5w w w . l a k e f l a t o . c o mSET ISSUE DATESDATEISSUEPROJ. ARCHITECTDRAWN BY:L|F PROJ. NO.NEST PARTNERS113 E. OAK STREET 4BBOZEMAN, MT 5971504/22/22100% DESIGN DEVELOPMENT04/10/2350% CONSTRUCTION DOCUMENTS05/08/2375% CONSTRUCTION DOCUMENTS06/16/23100% CONSTRUCTION DOCUMENTSTHIS SQUARE APEARS 1/2"x1/2"ON FULL SIZE SHEETSCIVIL: TD&H ENGINEERING234 E. BABCOCK, SUITE 3BOZEMAN, MT 59715LANDSCAPE: DESIGN 5111 N. TRACY ST.BOZEMAN, MT 59715STRUCTURAL: IMEG108 WEST BABCOCK STBOZEMAN, MT 59715MEP: ENERGY12042 STADIUM DRIVE, SUITE 2BOZEMAN, MT 59715BUILDING KEYBCD11/01/23100% SCHEMATIC DESIGN - A01/26/24100% DESIGN DEVELOPMENT - ABCDE05/10/24100% CONSTRUCTION DOCUMENTS-PHASE 1Autodesk Docs://Nest Bozeman/Nest Bozeman–LFA–Arch–Main–R22.rvt 4/17/2024 3:02:51 PM100% CONSTRUCTIONDOCUMENTS - PHASE 2DEC 06, 202421043GOTSWALLACEWORKS801 N. WALLACE AVEBOZEMAN, MTEA07/17/2450% CONSTRUCTION DOCS - PHASE 208/02/2490% CONSTRUCTION DOCS - PHASE 208/23/24100% CONSTRUCTION DOCS - PHASE 21TBDADDENDUM #01 A11039