Loading...
HomeMy WebLinkAbout032 - L200 - Overall Hardscape PlanKEYNOTESPROPERTY LINE10' TIMBER CUSTOM BENCH, SEE AMENITY SCHEDULEELECTRICAL TRANSFORMER ENCLOSURE, SEE ARCHPAVERS, SEE HARDSCAPE SCHEDULEBIKE RACKS, SEE SITE AMENITY SCHEDULEFDC CONNECTION, SEE ARCH AND CIVILPARKING LOT SCREENING FENCE, SEE ARCHMINI NUGGET MULCH, SEE SITE MATERIAL SCHEDULEDECORATIVE ROCK, SEE SITE MATERIAL SCHEDULEPOURED CONCRETE, SEE SITE HARDSCAPE SCHEDULEBOULEVARD ROCK, SEE MATERIAL SCHEDULEVISION TRIANGLE, SEE CIVILAT GRADE PLANTERBUILDING OVERHANG, SEE ARCH6' TIMBER CUSTOM BENCH, SEE AMENITY SCHEDULEEXISTING CONCRETE TO REMAIN, SEE CIVIL12345678910111213141516TRASH ENCLOSURE, SEE ARCH17TOPCAST CONCRETE, SEE HARDSCAPE SCHEDULE18EXISTING OVERHEAD POWER19SNOW STORAGE, SNOW IN EXCESS OF ONSITE STORAGECAPACITY WILL BE HAULED OFF SITE20SYMBOLPRODUCTPH2- HARDSCAPE SCHEDULECONCRETESIDEWALKCONCRETECENTRALWALKWAY W/ TOPCAST #5BRICKPAVERSSYMBOLPRODUCTPH2- SITE MATERIAL SCHEDULEMININUGGETSMULCH & SOILPEPDECORATIVEROCKSYMBOLPRODUCTPH2- SITE AMENITY SCHEDULE10'WOOD TIMBERBENCH6'WOOD TIMBERBENCHBIKERACKSSCREENINGFENCENORTHWALLACE AVE2227711111114141414141414691914999999951312912121210911111194441515399915111619BUILDING ABUILDING E1131616161415997181719161220202099910121211999991222919820Overall HardscapePlanL200105020N1L2001" = 10'-0"Overall Hardscape Plan© 2021 Lake|Flato Architects, Inc.3 1 1 T H I R D S T R E E TS A N A N T O N I O, T E X A S 7 8 2 0 5P 2 1 0. 2 2 7. 3 3 3 5 F 2 1 0. 2 2 4. 9 5 1 5w w w . l a k e f l a t o . c o mSET ISSUE DATESDATEISSUEPROJ. ARCHITECTDRAWN BY:L|F PROJ. NO.NEST PARTNERS113 E. OAK STREET 4BBOZEMAN, MT 5971504/22/22100% DESIGN DEVELOPMENT04/10/2350% CONSTRUCTION DOCUMENTS05/08/2375% CONSTRUCTION DOCUMENTS06/16/23100% CONSTRUCTION DOCUMENTSTHIS SQUARE APEARS 1/2"x1/2"ON FULL SIZE SHEETSCIVIL: TD&H ENGINEERING234 E. BABCOCK, SUITE 3BOZEMAN, MT 59715LANDSCAPE: DESIGN 5111 N. TRACY ST.BOZEMAN, MT 59715STRUCTURAL: IMEG108 WEST BABCOCK STBOZEMAN, MT 59715MEP: ENERGY12042 STADIUM DRIVE, SUITE 2BOZEMAN, MT 59715BUILDING KEYBCD11/01/23100% SCHEMATIC DESIGN - A01/26/24100% DESIGN DEVELOPMENT - ABCDE05/10/24100% CONSTRUCTION DOCUMENTS-PHASE 1Autodesk Docs://Nest Bozeman/Nest Bozeman–LFA–Arch–Main–R22.rvt 4/17/2024 3:02:51 PM100% CONSTRUCTIONDOCUMENTS - PHASE 2DEC 06, 202421043GOTSWALLACEWORKS801 N. WALLACE AVEBOZEMAN, MTEA07/17/2450% CONSTRUCTION DOCS - PHASE 208/02/2490% CONSTRUCTION DOCS - PHASE 208/23/24100% CONSTRUCTION DOCS - PHASE 21TBDADDENDUM #01 A***LANDSCAPE CONCRETESCORING PATTERN IS TO SHOW INTENTONLY. CONTROL JOINTS ARE TO COMEOFF OF BUILDING CORNERS AND SHALLBE FIELD VERIFIED ONCE BUILDINGS AREIN PLACE.PHASE 111111032