Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
031 - L 003 - Landscape Coverage Calculations
SEAST TAMARACK STNORTH WALLACE AVEBUILDING CROWHOUSEBUILDING B MIED USEBUILDING DROWHOUSENORTH WALLACE AVEACCBBBBBBBTATTATTATTATHARBUILDING ABUILDING ESMBOLPRODUCTPHʹ- HARDSCAPE SCHEDULECONCRETESIDEWALKCONCRETECENTRALWALKWA Wƭ TOPCAST ʶʼBRICKPAVERSSMBOLPRODUCTPHʹ- SITE MATERIAL SCHEDULEMININUGGETSMULCH ų SOILPEPDECORATIVEROCKSMBOLPRODUCTPHʹ- SITE AMENIT SCHEDULEʸʷͱWOOD TIMBERBENCHʽͱWOOD TIMBERBENCHBIKERACKSSCREENINGFENCENOTE:ʸƔSHRUB AND PERENNIAL COVERAGE IS THE SUM OF ALLPLANT AREAS AT ASSUMED MATURIT SEE PLANTSCHEDULE ON PAGE Lʷʷʸ FOR PLANT QUANTITIES ANDASSUMED SIESƔPH-ʹ LANDSCAPE COVERAGE SCHEDULESHRUBƭPERENNIALPLANT COVERʺƑˀʽʿSFʾʹ̈ TOTAL GROUND LEVELLANDSCAPE AREATOTAL LIVE PLANTCOVERAGEʺƑˀʽʿ SFʾʹ̈ʼƑʼʺʺSFLIVE PLANT MATERIALCOVERAGE AREÄ COVERSFPH-ʹ WATER CONSERVATION REQUIREMENTSDESIGN PATHWA: PERFORMANCELOCATIONCRITERIAPLAN UNITREQUIREDPROVIDEDHDROONEWATERUSELANDSCAPEVEGETATIVECOVERAGEREQUIREDSITE TREESPLANTS MUST BE GROUPEDTOGETHER B SIMILAR WATERUSE HDROONESƔTOTALLANDSCAPE AREAʼƑʼʺʺ SFWATERUSE NOTTO ECEEDʿ GALƭSFʽƔʺ GALƭSFSEE WATER BUDGETCALCULATOR TABLE ONSHEET Lʽʷʷʽʷ̈ OF LANDSCAPE MUSTCONTAIN A COMBINATION OFSHRUBSƑ PERENNIALSƑEVERGREENSƑ TURF OROTHER APPROVED GROUNDCOVERSƔ MINIMUM OF ʸʷ̈COVERAGE MUST BECOMPOSED OF CONTAINERGROWN EVERGREENSƑSHRUBS OR PERENNIALSƔTOTALLANDSCAPE AREAʼƑʼʺʺ SFAPPLICABLE AREAʺʼʿ SFʸ TREE PER ʸʽʷʷ SF OFAPPLICABLE LANDSCAPE AREAʷ SITETREESTOTALVEGETATIVE COVERƺSEE LANDSCAPECOVERAGE SCHEDULEFOR TOTALSƻʷ EISTING TEESʹ PROPOSED SITE TREESNOTE:ʸƔGREEN HATCH DENOTES TOTAL NON-EEMPT LANDSCAPE AREAʹƔSHRUB AND PERENNIAL COVERAGE IS THE SUM OF ALL INDIVIDUAL PLANTS AT ASSUMED MATURITƔINDIVIDUAL PLANT AREAS HAVE BEEN MULTIPLIED B THE QUANTIT REFLECTED ON THE PLAN TO GET THETOTAL COVERAGEƔ SEE PLANT SCHEDULE ON PAGE Lʷʷʸ FOR PLANT QUANTITIES AND ASSUMED SIESƔʺƔBOULEVARD TREES ARE LOCATED WITHIN PROPERT DUE TO UTILIT CONFLICTSƔʽʷ̈ OFLANDSCAPEAREA TO BECOVEREDWƭ LIVEPLANTMATERIALʺƑʺʸˀ SFLANDSCAPE AREA IN LIEU OF PARKING TOTAL LANDSCAPE AREA INLIEU OF PARKINGʹƑʻʿʼ SFNOTE:ʸƔLANDSCAPE IS PROVIDED WITHINBOULEVARD FOR REQUIREDPARKING DEDUCTIONƔLANDSCAPING IN LIEU OF PARKINGREQUIRED:ECEPT IN THE B-ʺ DISTRICTƑ PROPERT OWNERSͱ HAVE THE OPTION OF REQUESTING THE DELETION OF UPTO FIVE REQUIRED SPACES OR TEN PERCENT OF THE REQUIRED PARKING SPACESƑ WHICHEVER IS LESSƑ IFʺʼʷ SQUARE FEET OF LANDSCAPINGƑ TREES OR STREETSCAPING IS INSTALLED ON THE PROPERT FOR EACHSPACE SO DELETEDƔ THIS DOES NOT DECREASE THE AMOUNT OF LANDSCAPING THAT WOULD HAVE BEENREQUIRED WITH FULL PARKINGƑ BUT IS IN ADDITION TO SUCH LANDSCAPINGƔ THIS OPTION MUST BEAPPROVED B THE ADR STAFFƔ THESE IMPROVEMENTS MUST BE PLACED IN THE PUBLIC RIGHT-OF-WA ORSETBACKS DIRECTL FACING THE RIGHT-OF-WAƔPROVIDED:ʹƑʻʿʼ SF OF ADDITIONAL LANDSCAPE PROVIDED WITHIN PHASE ʸ AND PHASE ʹ BOULEVARDS OF IN-LIEUOF ƺʼƻ TOTAL PARKING SPACES DELETEDƔSTREET FRONTAGE LANDSCAPING:REQUIRED:ONE LARGE CANOP TREE FOR EACH ʼʷ FEET OF TOTAL STREET FRONTAGE ROUNDED TO THE NEAREST WHOLE NUMBERƔ WHERE IT MA BEIMPRACTICAL OR DIFFICULT TO PLANT LARGE CANOP TREES WITHIN THE PUBLIC RIGHT-OF-WA THE REQUIREMENT FOR ONE LARGE CANOP TREEFOE EACH ʼʷ FEET OF STREET FRONTAGE MA BE SUBSTITUTED WITH TWO SMALL ORNAMENTAL TREES PER ʼʷ FEET OF TOTAL STREET FRONTAGEƔREQUIRED PROVIDED:TAMARACK ST: ʸʺʹƔʼͱ OF STREET FRONTAGE ̏ ʼ SMALL ORNAMENTAL TREES ƺPHASE ʹƻ PROVIDED ON PROPERT ALONG THE STREETSCAPE ASSTREET TREES CANNOT BE PLANTED IN TAMARACK ST DUE TO HIGH TRANSMISSION POWER LINES OVERHEADWALLACE AVE TOTAL ƺPHASE ʸ ų ʹƻ: ʺʷʸͱ OF STREET FRONTAGE ̏ ˀ SMALL ORNAMENTAL TREES ƺPHASE ʹƻ PROVIDED AND ʺ SMALL ORNAMENTAL TREES ƺPHASE ʸƻ PROVIDEDƔ ƺʸʹƻ TOTAL TREES PROVIDED ALONG THE STREETSCAPE AS STREET TREES CANNOT BE PLANTED INBLVD DUE TO HIGH TRANSMISSION POWER LINES OVERHEAD AND UNDERGROUND UTILITIES THROUGHOUT BLVDƔADDITIONAL LANDSCAPE-IN-LIEU OF PARKING PROVIDED:TAMARACK ST: ʾʹʾ SF OF BOULEVARD LANDSCAPE ƺPHASE ʹƻ PLANTED WITH ADDITIONAL PERENNIAL SWATHS FOR ENHANCED COMMUNITAESTHETICƔ SEE LANDSCAPE COVERAGE PLAN ų PLANTING PLANSƔWALLACE AVE: ʸƑʷʹʷ SF OF BOULEVARD LANDSCAPE ƺPHASE ʹƻ PLANTED WITH ADDITIONAL PERENNIAL SWATHS FOR ENHANCED COMMUNITAESTHETICƔ SEE LANDSCAPE COVERAGE PLAN ų PLANTING PLANSƔWALLACE AVE: ʾʺʿ SF OF BOULEVARD LANDSCAPE ƺPHASE ʸƻ PLANTED WITH ADDITIONAL PERENNIAL SWATHS FOR ENHANCED COMMUNITAESTHETICƔ SEE LANDSCAPE COVERAGE PLAN ų PHASE ʸ PLANTING PLANSƔL·ÄºÉ¹·Æ»CÅ̻ȷ½»C·Â¹Ë·ʿÅÄÉLʷʷʺʸʽʿʷʺʽNʸLʷʷʺʸƭʸʽͲ ̏ ʸͱ-ʷͲL·ÄºÉ¹·Æ» CÅ̻ȷ½» C·Ë¹Ë·ʿÅÄÉ© 2021 Lake|Flato Architects, Inc.3 1 1 T H I R D S T R E E TS A N A N T O N I O, T E X A S 7 8 2 0 5P 2 1 0. 2 2 7. 3 3 3 5 F 2 1 0. 2 2 4. 9 5 1 5w w w . l a k e f l a t o . c o mSET ISSUE DATESDATEISSUEPROJ. ARCHITECTDRAWN BY:L|F PROJ. NO.NEST PARTNERS113 E. OAK STREET 4BBOZEMAN, MT 5971504/22/22100% DESIGN DEVELOPMENT04/10/2350% CONSTRUCTION DOCUMENTS05/08/2375% CONSTRUCTION DOCUMENTS06/16/23100% CONSTRUCTION DOCUMENTSTHIS SQUARE APEARS 1/2"x1/2"ON FULL SIZE SHEETSCIVIL: TD&H ENGINEERING234 E. BABCOCK, SUITE 3BOZEMAN, MT 59715LANDSCAPE: DESIGN 5111 N. TRACY ST.BOZEMAN, MT 59715STRUCTURAL: IMEG108 WEST BABCOCK STBOZEMAN, MT 59715MEP: ENERGY12042 STADIUM DRIVE, SUITE 2BOZEMAN, MT 59715BUILDING KEYBCD11/01/23100% SCHEMATIC DESIGN - A01/26/24100% DESIGN DEVELOPMENT - ABCDE05/10/24100% CONSTRUCTION DOCUMENTS-PHASE 1Autodesk Docs://Nest Bozeman/Nest Bozeman–LFA–Arch–Main–R22.rvt 4/17/2024 3:02:51 PM100% CONSTRUCTIONDOCUMENTS - PHASE 2DEC 06, 202421043GOTSWALLACEWORKS801 N. WALLACE AVEBOZEMAN, MTEA07/17/2450% CONSTRUCTION DOCS - PHASE 208/02/2490% CONSTRUCTION DOCS - PHASE 208/23/24100% CONSTRUCTION DOCS - PHASE 21TBDADDENDUM #01 Aʸ031