Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
029 - L 001 - Notes and Legends
SMBOLDESCRIPTIONCONTACTPRODUCTQUANTITPH2- HARDSCAPE SCHEDULECONCRETESIDEWALKTPE: CONCRETEFINISH: BROOMNOTES: SEE Lʼ01 DETAIL 1-3 SEECIVIL FOR ADDITIONAL DETAILSB CONTRACTORAPPRO7,3ʼ0SFCONCRETECENTRALWALKWA Wƭ TOPCAST ʶʼTPE: POURED CONC. 4Ͳ DEPTHTOPCAST: ʶʼ FINISH, BATCH COLORNOTES: SEE PH-1 FOR ETENTS ANDQUANTITIES. FINISH WORK WILL BEREQUIRED ALONG PHASE LINE ANDBUILDING E. SEE Lʼ01 DETAIL 4B CONTRACTORSEE PH-1BRICKPAVERSTPE: MUTUAL MATERIALS CLABRICK PAVERS IN PIONEER USEDƺOR APPROVED EQUALƻNOTES: MORTAR SET OVERCONCRETE WITH 38Ͳ OINTS. OINTS TO BE FILLED WITH POLSAND. SEE SHEET Lʼ01: DETAIL ʼ-7APPRO.1,320SFBOEMAN BRICK487ʼ ACKRABBIT LANEBOEMAN MT ʼˀ718ƺ40ʽƻʼ87-4283LANDSCAPE INSTALL NOTESGENERAL1.CONTRACTOR IS RESPONSIBLE FOR VERIFING THE LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TOBEGINNING WORK. CALL 811.2.PLACE TREES, SHRUBS, AND PLANT MATERIAL WITH LANDSCAPE ARCHITECT PRESENT. LANDSCAPEARCHITECT TO BE NOTIFIED 48 HOURS IN ADVANCE.3.PLACE ALL BOULDERS WITH LANDSCAPE ARCHITECT PRESENT.LANDSCAPE ARCHITECT TO BE NOTIFIED 48HOURS IN ADVANCE.4.THE LOCATION OF ALL FLAGSTONE, STEPS, AND PATIO AREAS SHALL BE COORDINATED ON SITE WITH THELANDSCAPE ARCHITECT, WHEN APPLICABLE.ʼ.ALL PLANT MATERIAL SHALL CONFORM TO THE CURRENT AMERICAN STANDARD FOR NURSER STOCK.ʼ.1.ALL DECIDUOUS TREES AND SHRUBS OUTSIDE OF DEDICATED PLANTING BEDS TO BE FENCED FORMIN. 2 EARSʼ.2.ALL TREES AND SHRUBS OUTSIDE OF DEDICATED PLANTING BEDS TO HAVE 3ͱ DIAMETER MULCH RING.ʼ.3.ALL TREES TO BE STAKED FOR MIN. 2 EARS.ʽ.VERIF ALL QUANTITIES. ILLUSTRATED PLAN SHALL DICTATE COUNT.7.NO SUBSTITUTIONS WILL BE ALLOWED WITHOUT THE WRITTEN CONSENT OF THE LANDSCAPE ARCHITECT.ALL REQUESTS SHOULD BE SUBMITTED TO DESIGN ʼ LANDSCAPE ARCHITECTURE. 40ʽ-ʼ87-4873 ORTROʤDESIGNʼLA.COM.8.LANDSCAPE ARCHITECT SHALL MEET WITH LANDSCAPE CONTRACTOR ON SITE, AT PREDETERMINEDINTERVALS TO DISCUSS PROGRESS, QUESTIONS, AND PRODUCT PLACEMENT.ˀ.ALL EDGING SHALL BE 31ʽͲ 4Ͳ NATURAL STEEL ON STRAIGHT RUNS AND 18Ͳ 4Ͳ NATURAL STEEL FORCURVED RUNS ƺOR AS OTHERWISE SPECIFIED IN DETAILSƻ. TAC WELD TO ʶ4 REBAR DRIVEN A MINIMUM OF18Ͳ DEEP.10.ALL AREAS ON SITE DISTURBED B CONSTRUCTION ACTIVITIES NOT INDICATED ON LANDSCAPE PLAN ARETO BE RECLAIMED AND RE-ESTABLISHED TO PRE-DISTURBANCE CONDITION, VERIF DISTURBANCE AREASIN FIELD. CONTRACTOR IS RESPONSIBLE FOR THE COST OF RESTORING AN DISTURBANCE OUTSIDE OFTHE AGREED UPON LIMIT OF WORK BOUNDAR INDICATED ON THE PLANS.11.VERIF ALL CUSTOM SEED MIES. THOSE PROCURED THROUGH WILD HARVEST METHODS ƺWIND RIVERSEED, BLAKE NURSER, BIG SK SEED, GREAT BASIN SEEDƻ REQUIRE ORDERING A MINIMUM OF ONE EARIN ADVANCE OF INSTALLATION OR OTHER AS SPECIFIED B SEED PROVIDER.12.ALL ROCK MULCH IS TO BE WASHED PRIOR TO INSTALLATION13.PRIOR TO CONSTRUCTION A PRE-INSTALLATION MEETING WITH THE CIT OF BOEMAN WATERCONSERVATION DIVISION IS REQUIRED. AFTER INSTALLATION OR AMENDMENT OF ALL SOILS REQUIRED BTHE APPLICATION APPROVAL A SOILS APPROVAL CERTIFICATION IS REQUIRED. SEE CIT OF BOEMANLANDSCAPE AND IRRIGATION CODE.CIT OF BOEMAN REQUIRED SITE SOIL QUALIT14.PERFORM SOIL TEST AND IMPORT SOIL AMENDED PURSUANT TO RECOMMENDATION OF SOIL TEST-A SOIL ANALSIS MUST BE CONDUCTED B AND INDEPENDENT, STATE OPERATED OR UNIVERSIT -OPERATED SOIL LAB WITH THE CAPABILIT ADN EPERIENCE TO CONDUCT THE REQUIRED TESTING.THESOIL TEST SHALL BE DATED NO MORE THAN ʽ0 DAS PRIOR TO PRE-INSTALLATION MEETING AND MUSTBE PROVIDED TO REVIEW AUTHORIT AT THE PRE-INSTALLATION MEETING.-SOIL SAMPLES MUST REPRESENT A UNIFORM AREA. RECOMMENDED RATE SHOULD BE 1 SAMPLE PERʼ,000 SF OF LANDSCAPED AREA-SOIL ANALSIS MUST TEST THE FOLLOWING:--SOIL TETURE--PERCENTAGE OF ORGANIC MATTER--SOIL REDUCTION ƺACIDITƭALKALINIT ÆH VALUEƻ--SOLUBLE-SALT CONTENT--NUTRIENTS: INCLUDING NITROGEN, PHOSPHORUS, POTASSIUM, INC, IRON, COPPER, MANGANESE,AND LIME.SOIL PREP1ʼ.ALL BACKFILLED AND DISTURBED AREAS TO BE RAKED SMOOTH. ALL ROCKS GREATER THAN 2Ͳ DIAMETER,STICKS, ROOTS, ALL CONSTRUCTION DEBRIS AND ALL OTHER ETRANEOUS MATTER TO BE PICKED UP ANDREMOVED FROM SITE BEFORE SOIL AMENDMENTS ARE ADDED.1ʽ.EISTING SOIL AREA NOT TO BE DISTURBED SHALL BE PROTECTED FROM COMPACTION, DISTURBANCEAND CONTAMINATION DURING CONSTRUCTION.17.SEED AREASƺWHEN APPLICABLEƻ- LIGHTL SCARIF SURFACE OR LIGHTL TILL AND RAKE SMOOTH PRIORTO ADDING SOIL.17.1.SEEDED AREA SOIL REQUIREMENTS: ECAVATE TO ʽͲ DEPTH AND BACKFILL WITH AMENDED TOP SOILPER CIT OF BOEMAN SOIL REQUIREMENTS. HDRO-SEED WITH džFLETERRA TACKIFIERdž.18.SOD AREASƺWHEN APPLICABLEƻ - LIGHTL SCARIF SURFACE OR LIGHTL TILL AND RAKE SMOOTH PRIORTO ADDING SOIL.18.1.SOD AREA SOIL REQUIREMENTS: ECAVATE TO ʽͲ DEPTH AND BACKFILL WITH AMENDED TOP SOIL PERCIT OF BOEMAN SOIL REQUIREMENTS. TOPSOIL SHALL BE DRUM ROLLED OR TRACK-PACKED ANDGRADED SMOOTHL AND EVENL PRIOR TO LAING SOD. RAKE SMOOTH TO MATCH FINAL GRADINGPLAN.1ˀ.ALL TREES, SHRUBS AND PERENNIALS OUTSIDE DEDICATED PLANTING BEDS TO BE ECAVATED 2Î THESIE OF THE ROOT BALL MINIMUM OR TO ʽͲ DEPTH WHICH EVER IS LARGER. SCARIF SIDES AND BOTTOMTO REMOVE GLAING. BACKFILL WITH AMENDED TOP SOIL PER CIT OF BOEMAN SOIL REQUIREMENTS.20.ALL PLANTING BEDS TO BE ECAVATED MIN. 18Ͳ DEEP. SCARIF SIDES AND BOTTOM TO REMOVE GLAING.BACKFILL WITH AMENDED TOP SOIL PER CIT OF BOEMAN SOIL REQUIREMENTS. RAKE SMOOTH TOMATCH FINISH GRADE.21.DO NOT SCARIF IF SOIL IS FROEN, MUDD OR ECESSIVEL WET.IRRIGATION22.PERMANENT UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED AT TIME OF LANDSCAPEINSTALLATION. MAIN LINE, LATERAL LINE, AND SPRINKLERS NOT BURIED AT TIME OF PROJECTCOMPLETION WILL NOT BE ACCEPTED.23.IRRIGATION TO BE INSTALLED IN ACCORDANCE WITH ALL STATE AND LOCAL CODES AND ORDINANCES.SEE L600s FOR ADDITIONAL IRRIGATION NOTES.TPE: MINI NUGGET MULCHNOTES: 3Ͳ - 4Ͳ DEPTHSEE SHEET Lʼ00 DETAIL 3-7SMBOLDESCRIPTIONCONTACTPRODUCTQUANTITPH2- SITE MATERIAL SCHEDULEMININUGGETSMULCH & SOILPEP2,ʽ70SFWESTERN PINESLANDSCAPINGMANHATTAN, MT ʼˀ71440ʽ-282-7ʼ27DECORATIVEROCKTPE: BA A BLACK ROUND RIVERROCK 1Ͳ-2Ͳ MULCH.NOTES: 3Ͳ DEPTH OVER WEEDFABRIC ALL MATERIAL TO BEWASHED AND CLEANED BEFOREINSTALLATION.SEE Lʼ00 DETAIL 3-72,ˀ00SFSCENIC CIT ROCK SUPPLBELGRADE, MT ʼˀ714SHAWN & SHELL40ʽ-388-7771SMBOLDESCRIPTIONCONTACTPRODUCTQUANTITPH2- SITE AMENIT SCHEDULE10ͱWOOD TIMBERBENCH7 TOTALƺ14 TIMBERSƻʽͱWOOD TIMBERBENCH3 TOTALƺʽ TIMBERSƻ12Ͳ12Ͳ ʽͱ WESTERN LARCHTIMBER STRUCTURE,CONSTRUCTED FROM ƺ12ƻ 12ͱTIMBERS.CORTEN STEEL LEGSSEE SHEET Lʼ02WOOD:MONTANA CUSTOM BEAMSNOON MT ʼˀ8ʼ3WOOD:MONTANA CUSTOM BEAMSNOON MT ʼˀ8ʼ312Ͳ12Ͳ10ͱ WESTERN LARCHTIMBER BENCH WITH CORTENSTEEL LEGSSEE SHEET Lʼ02BIKERACKSLANDSCAPE FORMS ͱRINGͱ BIKERACKƒ EMBEDDED IN CONCRETEƒSEE SHEET Lʼ00: DETAIL 811TOTAL22 SPACESLANDSCAPE FORMSBRCE WARD800-430-ʽ20ʽ¸ÈϹ»Íʤ·ĺɹ·Æ»¼ÅÈÃÉ.¹ÅÃSCREENINGFENCESEE ARCHSCREENING FENCE.DETAIL B ARCHSEE ARCHNÅÊ»É &L»½»ÄºÉL 001© 2021 Lake|Flato Architects, Inc.3 1 1 T H I R D S T R E E TS A N A N T O N I O, T E X A S 7 8 2 0 5P 2 1 0. 2 2 7. 3 3 3 5 F 2 1 0. 2 2 4. 9 5 1 5w w w . l a k e f l a t o . c o mSET ISSUE DATESDATEISSUEPROJ. ARCHITECTDRAWN BY:L|F PROJ. NO.NEST PARTNERS113 E. OAK STREET 4BBOZEMAN, MT 5971504/22/22100% DESIGN DEVELOPMENT04/10/2350% CONSTRUCTION DOCUMENTS05/08/2375% CONSTRUCTION DOCUMENTS06/16/23100% CONSTRUCTION DOCUMENTSTHIS SQUARE APEARS 1/2"x1/2"ON FULL SIZE SHEETSCIVIL: TD&H ENGINEERING234 E. BABCOCK, SUITE 3BOZEMAN, MT 59715LANDSCAPE: DESIGN 5111 N. TRACY ST.BOZEMAN, MT 59715STRUCTURAL: IMEG108 WEST BABCOCK STBOZEMAN, MT 59715MEP: ENERGY12042 STADIUM DRIVE, SUITE 2BOZEMAN, MT 59715BUILDING KEYBCD11/01/23100% SCHEMATIC DESIGN - A01/26/24100% DESIGN DEVELOPMENT - ABCDE05/10/24100% CONSTRUCTION DOCUMENTS-PHASE 1Autodesk Docs://Nest Bozeman/Nest Bozeman–LFA–Arch–Main–R22.rvt 4/17/2024 3:02:51 PM100% CONSTRUCTIONDOCUMENTS - PHASE 2DEC 06, 202421043GOTSWALLACEWORKS801 N. WALLACE AVEBOZEMAN, MTEA07/17/2450% CONSTRUCTION DOCS - PHASE 208/02/2490% CONSTRUCTION DOCS - PHASE 208/23/24100% CONSTRUCTION DOCS - PHASE 21TBDADDENDUM #01 A11029