Loading...
HomeMy WebLinkAbout028 - L 000 - Landsacpe Plan - OverallSSEAST TAMARACK STNORTH WALLACE AVEBUILDING CROWHOUSEBUILDING B MIED USEBUILDING DROWHOUSENORTH WALLACE AVEACCBBBBBBBTATTATTATTATHARBUILDING ABUILDING E UTURE ELECTRIC VEHICLECHARGING SPACES1ʼʿʿS 1ʿˀͱƖʾͲ 1ʺ2ͱƖʼͲSHEET INDELʷʷʷƖLANDSCAPE PLAN Ɩ OVERALLLʷʷ1ƖNOTES AND LEGENDSLʷʷ2Ɩ NOTES AND LEGENDSLʷʷʺƖLANDSCAPE COVERAGE CALCULATIONSL2ʷʷƖOVERALL HARDSCAPE PLANL2ʷ1ƖDIMENSION PLANLʺʷʷƖOVERALL TREE PLANTING & PLANTING ENLARGEMENT KELʺʷ1ƖPLANTING PLAN ENLARGEMENT Ɩ BUILDING A SOUTHLʺʷ2ƖPLANTING PLAN ENLARGEMENT Ɩ BUILDING A EASTLʺʷʺƖPLANTING PLAN ENLARGEMENT Ɩ BUILDING A NORTHLʺʷʻƖPLANTING PLAN ENLARGEMENT Ɩ PARKING LOTLʼʷʷƖLANDSCAPE DETAILSLʼʷ1Ɩ LANDSCAPE DETAILSLʼʷ2Ɩ LANDSCAPE DETAILSLʽʷʷƖIRRIGATION NOTES & LEGENDSLʽʷ1ƖIRRIGATION PLANLʾʷʷƖIRRIGATION DETAILSLʾʷ1ƖIRRIGATION DETAILSPRO ECT DATAƖWALLACE WORKSPRO ECT OWNERNEST PARTNERSʺ1ʺ1 SENTINEL DRIVEBOEMAN, MT ʼˀʾ1ʼCIVIL ENGINEERTD&H ENGINEERING2ʺʻ E BABCOCK , SUITE ʺBOEMAN, MT ʼˀʾ1ʼƺʻʷʽƻ ʼʿʽ Ɩ ʷ2ʾʾARCHITECTLAKE LATOʺ11 NORTH STREETSAN ANTONIO, T ʾʿ2ʷʼƺ21ʷƻ 22ʾ Ɩ ʺʺʺʼLANDSCAPE ARCHITECTDESIGN ʼ, LLCTRO SCHERER111 NƔ TRACBOEMAN, MT ʼˀʾ1ʼƺʻʷʽƻ ʼʿʾ Ɩ ʻʿʾʺSMBOLPRODUCTPH2Ɩ HARDSCAPE SCHEDULECONCRETESIDEWALKCONCRETECENTRALWALKWA Wƭ TOPCAST ʶʼBRICKPAVERSSMBOLPRODUCTPH2Ɩ SITE MATERIAL SCHEDULEMININUGGETSMULCH & SOILPEPDECORATIVEROCKNATURAL GASSEWER LINEWATER LINEUNDERGROUND POWERLINE TPE LEGENDSTORM DRAINCOMMON OUTDOORRESIDENTIAL OPEN SPACECOMMERCIALPEDESTRIAN OPEN SPACELANDSCAPE APPROVAL PATHWA: PER ORMANCETOTAL LANDSCAPE AREA: SEE LANDSCAPE COVERAGE PLAN Lʷʷ2SITE TREE REQUIREMENTS: SEE Lʷʷ2DROUGHT TOLERANT SPECIESREQUIRED:A LANDSCAPE PLAN MUST PROVIDE ʾʼ PERCENT OR GREATER O THEPROPOSED TREES AND SHRUBS AS DROUGHT TOLERANT SPECIESPROVIDED:THE ENTIRE LANDSCAPE PLAN PROVIDES ʿʾ PERCENT O THE PROPOSED TREES AND SHRUBS AS DROUGHT TOLERANT SPECIESSTREET RONTAGE LANDSCAPINGREQUIRED:ONE LARGE CANOP TREE OR EACH ʼʷ EET O TOTAL STREET RONTAGE ROUNDED TO THE NEARESTWHOLE NUMBERƔ WHERE IT MA BE IMPRACTICAL OR DI ICULT TO PLANT LARGE CANOP TREES WITHINTHE PUBLIC RIGHTƖO ƖWA THE REQUIREMENT OR ONE LARGE CANOP TREE OE EACH ʼʷ EET O STREET RONTAGE MA BE SUBSTITUTED WITH TWO SMALL ORNAMENTAL TREES PER ʼʷ EET O TOTAL STREET RONTAGEƔPROVIDED:TAMARACK, 1ʺ2Ɣʼͱ O STREET RONTAGE ̏ ʼ SMALL ORNAMENTAL TREES PROVIDED ON PROPERTALONG THE STREETSCAPE AS STREET TREES CANNOT BE PLANTED IN TAMARACK ST DUE TO HIGHTRANSMISSION POWER LINES OVERHEADWALLACE ST: 1ʿˀƔʼʿͱ O STREET RONTAGE ̏ ˀ SMALL ORNAMENTAL TREES PROVIDED ON PROPERTALONG THE STREETSCAPE AS STREET TREES CANNOT BE PLANTED IN WALLACE BLVD DUE TO HIGHTRANSMISSION POWER LINES OVERHEAD AND UNDERGROUND UTILITIES THROUGHOUT BLVDƔPHASE 1 STREET TREES NOT SHOWNƔ SEE PHASE 1 OR STREET TREES WITHIN PHASE 1 BOUNDARPARKING LOT LANDSCAPINGREQUIRED: ALL PARKING LOTS LOCATED BETWEEN A PRINCIPAL STRUCTURE AND A PUBLIC STREET, MUST BESCREENED ROM THE PUBLIC STREETƔ SCREENING MUST BE CONTINUOUS AND NOT LESS THAN OUR EETIN WIDTHƔ SCREENING MUST BE MAINTAINED AT A HEIGHT O OUR TO SI EETREQUIRED:Aƻ ONE LARGE CANOP TREEƒ OR Bƻ ONE LARGE NONƖCANOP TREE AND ONE SMALL TREEƒ OR Cƻ THREESMALL TREES OR EACH NINE PARKING SPACES REQUIRED OR PROVIDEDƔ ƺʼʻ TOTAL PARKING SPACESƻPROVIDED:Aƻ ʽ LARGE CANOP TREES IN ƭ WITHIN 2ʷ EET O THE PARKING LOTALL PARKING SPACES ARE LOCATED WITHIN ʾʷ EET O A TREE TRUNKUSABLE COMMERCIAL OPEN SPACE:REQUIRED:NEW DEVELOPMENTS WITH NONƖRESIDENTIAL USES ON SITES WITH A TOTAL SITE AREA GREATER THAN ONE ACRE MUST PROVIDE OPEN SPACE: AN AREA EQUAL TO AT LEAST 2 PERCENT O THE SITE AREAAN AREA EQUAL TO AT LEAST 2 PERCENT O THE SITE AREA:2̈  ʽ2,2ʼ1 Tˆ ̏ 1,2ʻʼ Tˆ OPEN SPACEAT LEAST TWO EET O SEATING AREA ƺA BENCH OR LEDGE AT LEAST 1ʽ INCHES DEEP AND APPROPRIATE SEATING HEIGHTƻ OR ONE INDIVIDUAL SEAT PER ʽʷ SQUARE EET O PLAA AREA OROPEN SPACEƔ 1,2ʼʼƭʽʷ Î 2 ̏ ʻ1Ɣʿ L ƔPROVIDED COMMERCIAL:PLAA SPACE ̏ 1,ʿ1ʻ S BENCHES PROVIDED: ʻʿ LINEAL T O BENCH SEATINGUSABLE RESIDENTIAL OPEN SPACE:REQUIRED:MULTIƖHOUSEHOLD ̏ ʽ,ʷʷʷ S Ɩ 1,ʾ2ʿ S ƺBALCONIESƻ ̏ ʻ,2ʾ2 S O GROUND LEVEL OPEN SPACEƔPROVIDED:ʻ,ʼʻʻ S O USABLE GROUND LEVEL OPEN SPACE PROVIDEDƔREQUIRED:ROWHOMES ̏ 1,ʷ21 S PROVIDED: 1,ʷʾʷ S PROVIDED WITH RONT PORCHESSEE ARCH OR ADDITIONAL OPEN SPACE TABLESBICCLE PARKINGREQUIRED: 1ʷ̈ O ʼʻ PROPOSED PARKING SPACE ̏ ʽ BIKE PARKING SPOTS REQUIREDPROVIDED:PHASE 1: ƺʾƻ BIKE RACKS PROVIDED ̏ 1ʻ BIKE PARKING SPACES PROVIDEDƺSEE PHASE 1 OR PHASE 1 BIKE RACK LOCATIONSƻPHASE 2: ƺ11ƻ BIKE RACKS PROIVIDED ̏ 22 BIKE PARKING SPACES PROVIDEDTOTAL: ƺ1ʿƻ BIKE RACKS PROVIDED ̏ ʺʽ BIKE PARKING SPACES PROVIDEDSOIL AMENDMENT REQUIREMENTS:AƔAMEND EISTING TOPSOIL AT A RATE O ʻCƭ1ʷʷʷS Ɣ COMPOST MUST MEET THE STATE O MONTANAͱSCOMPOST REQUIREMENT OR SOIL AMENDMENT AND SHALL BE SPREAD AND MIED EVENL INTO THETOP SI ƺʽƻ INCHES O SOILƒBƔPER ORM A SOIL TEST AND AMEND EISTING SOIL AS RECOMMENDED B SOIL TESTƒ ORCƔIMPORT TOPSOIL THAT HAS BEEN AMENDED PURSUANT TO THE RECOMMENDATIONS O A SOIL TESTƔPROVIDED: ƺCƻ NEW TOPSOIL WILL BE IMPORTED PER THE RECOMMENDATIONS O A SOIL TESTƔBOEMAN, MONTANA CODE O ORDINANCESWALLACE WORKSʿʷ1 NƔ WALLACE AVE, BOEMAN MTLEGAL DESCRIPTION:LOTS 2Ɩʺ O PLANT CƖ2ʺƖA1ʿƒ LOT 2 O PLANT CƖ2ʺƖA1ʽƒ TRACT 1 O MINOR SUB NOƔ ʺLOCATED IN THE SE 1ʻ O SEC ʽ, Tʷ2S, RʷʽE, PƔMƔMƔ, GALLATIN COUNT, MTL·ÄºÉ¹·Æ» PÂ·Ä ƖO̻ȷÂÂL ʷʷʷ2ʷ1ʷʷʻʷN1Lʷʷʷ1Ͳ ̏ 2ʷͱƖʷͲL·ÄºÉ¹·Æ» PÂ·Ä Ɩ O̻ȷÂÂTAMARACK STLOCATION KE MAPPROJECTSITENORTH WALLACE AVEEAST ASPEN STREET© 2021 Lake|Flato Architects, Inc.3 1 1 T H I R D S T R E E TS A N A N T O N I O, T E X A S 7 8 2 0 5P 2 1 0. 2 2 7. 3 3 3 5 F 2 1 0. 2 2 4. 9 5 1 5w w w . l a k e f l a t o . c o mSET ISSUE DATESDATEISSUEPROJ. ARCHITECTDRAWN BY:L|F PROJ. NO.NEST PARTNERS113 E. OAK STREET 4BBOZEMAN, MT 5971504/22/22100% DESIGN DEVELOPMENT04/10/2350% CONSTRUCTION DOCUMENTS05/08/2375% CONSTRUCTION DOCUMENTS06/16/23100% CONSTRUCTION DOCUMENTSTHIS SQUARE APEARS 1/2"x1/2"ON FULL SIZE SHEETSCIVIL: TD&H ENGINEERING234 E. BABCOCK, SUITE 3BOZEMAN, MT 59715LANDSCAPE: DESIGN 5111 N. TRACY ST.BOZEMAN, MT 59715STRUCTURAL: IMEG108 WEST BABCOCK STBOZEMAN, MT 59715MEP: ENERGY12042 STADIUM DRIVE, SUITE 2BOZEMAN, MT 59715BUILDING KEYBCD11/01/23100% SCHEMATIC DESIGN - A01/26/24100% DESIGN DEVELOPMENT - ABCDE05/10/24100% CONSTRUCTION DOCUMENTS-PHASE 1Autodesk Docs://Nest Bozeman/Nest Bozeman–LFA–Arch–Main–R22.rvt 4/17/2024 3:02:51 PM100% CONSTRUCTIONDOCUMENTS - PHASE 2DEC 06, 202421043GOTSWALLACEWORKS801 N. WALLACE AVEBOZEMAN, MTEA07/17/2450% CONSTRUCTION DOCS - PHASE 208/02/2490% CONSTRUCTION DOCS - PHASE 208/23/24100% CONSTRUCTION DOCS - PHASE 21TBDADDENDUM #01 ANOTE: PERENNIALS AND SHRUBS ARE NOT SHOWN ON THIS PLAN OR CLARITƔ RE ER TO PAGES LʺʷʷƖLʺʷʻ OR PLANTING SHEETSƔBUILDINGS A & EƺPHASE 2ƻBUILDINGS B,C,DƺPHASE 1ƻSUBMITTED INSEPARATEPREVIOUSLAPPROVED SITEPLAN APPLICATIONƔ2ˀʼʽS 1ʿ1ʻS 2