Loading...
HomeMy WebLinkAbout003 - G100-2 - SITE PLAN - PHASE 2UP UP UP UP 15'-0" POWERLINE CLEARANCE PROPERTY LINE S00°56'17"W 330.15' 3'-0" REAR SETBACK PROPERTY LINE N00°52'45"E 180.94'PROPERTY LINE N89°14'54"E 194.927'-6" R.O.W. ABANDONMENT (NEW P.L.)10'-0" UTILITY EASEMENTE T A M A R A C K S T.N W A L L A C E A V E. 10'-0" UTILITY EASEMENT 15' - 0"APPROX. LOCATION OF CLOSEST OVERHEAD POWERLINE ELECTRICAL TRANSFORMER ENCLOSURE FIRE RISER TRASH ROLLOVER BOLLARDS (PER FIRE DEPT.) RESIDENTIAL LOBBY 676 SF SHEETS AESHEETS AD SHEETS AASHEETS AB 1 RECYCLE NONCOMBUSTIBLE 8" CMU WALL, REF BLDG D DRAWINGS ROWHOME WASTE BIN PAVED HOLDING AREA 3'-6" HIGH SCREENED ENCLOSURE ELECTRIC METER BANK TRANSFORMER 22' - 0"8' - 0" 30' - 0"PROPERTY LINEEASEMENTEASEMENT30' - 0" 30' - 0" BUILDING B BUILDING A BUILDING E BUILDING C BUILDING D PLANTER BED SEE LANDSCAPE SHEETS SEE LANDSCAPE SHEETS PLANTING AREA PLANTING AREA BLOCK FRONTAGE DEPARTURE REQUEST: EXISTING CHAINLINK GATE / ASPEN STREET TERMINATION SHEETS AC SHEETS AB 10' - 0"7' - 6"10' - 0"SEE LANDSCAPE SHEETS CUSTOM MTL MESH GATE W/ STL ANGLE FRAME, PTD RESIDENTIAL TRASH/RECYCLE ENCLOSURE BUILDING OVERHEAD SCREEN WALL - STEEL COL, W/ WOOD SLATS SHEETS AD SHEETS AC SHEETS AASHEETS AE PHASE 2PHASE 1 PHASE 2PHASE 1 COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTC AR SHARE C AR SHARE C AR SHARE C AR SHARE COMPACTFUTURE EV CHARGING STATIONFUTURE EV CHARGING STATIONFUTURE EV CHARGING STATIONFUTURE EV CHARGING STATIONFUTURE EV CHARGING STATIONCOMPACTCOMPACT123456789101112 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 37 36 46 47 48 49 50 51 52 53 54 GATE COMPACT38394041424344 45 MURAL WALL TRASH APPROACH 50' - 0" GENERAL SITE PLAN NOTES 1. FINISHED GRADE SHALL SLOPE AWAY FROM THE BUILDING A MINIMUM OF TWO PERCENT. COORDINATE WITH FINISHED GRADING PLANS AND NOTIFY ARCHITECT OF ANY GRADING CONFLICTS. 2. PROVIDE MINIMUM 4 INCH DIAMETER PVC SLEEVES WHEN RUNNING NEW LINES UNDER EXISTING CONCRETE SIDEWALKS, PAVING, ETC. 3. CONTRACTOR SHALL COORDINATE AND PROVIDE RECESSED KEY BOXES IN A LOCATION(S) VERIFIED BY THE FIRE OFFICIAL HAVING JURISDICTION AND APPROVED BY THE ARCHITECT, WHETHER SUCH BOXES/LOCATION(S) ARE IDENTIFIED ON THE PLANS OR NOT. CONTRACTOR SHALL MAKE AN APPOINTMENT WITH THE FIRE OFFICIAL FOR TRANSFERRING AND SECURING KEYS IN THE KEY BOXES. 4. SEE CIVIL PLANS FOR CURBS, SIDEWALKS, GRADING, AND UTILITIES. 5. SEE LANDSCAPE PLANS FOR LANDSCAPE AREAS, AND IRRIGATION. 6. SEE ELECTRICAL PLANS FOR SITE LIGHTING. © 2021 Lake|Flato Architects, Inc. 3 1 1 T H I R D S T R E E T S A N A N T O N I O, T E X A S 7 8 2 0 5 P 2 1 0. 2 2 7. 3 3 3 5 F 2 1 0. 2 2 4. 9 5 1 5 w w w . l a k e f l a t o . c o m SET ISSUE DATES DATE ISSUE PROJ. ARCHITECT DRAWN BY: L|F PROJ. NO. NEST PARTNERS 113 E. OAK STREET 4B BOZEMAN, MT 59715 04/22/22 100% DESIGN DEVELOPMENT 04/10/23 50% CONSTRUCTION DOCUMENTS 05/08/23 75% CONSTRUCTION DOCUMENTS 06/16/23 100% CONSTRUCTION DOCUMENTS THIS SQUARE APEARS 1/2"x1/2" ON FULL SIZE SHEETS CIVIL: TD&H ENGINEERING 234 E. BABCOCK, SUITE 3 BOZEMAN, MT 59715 LANDSCAPE: DESIGN 5 111 N. TRACY ST. BOZEMAN, MT 59715 STRUCTURAL: IMEG 108 WEST BABCOCK ST BOZEMAN, MT 59715 MEP: ENERGY1 2042 STADIUM DRIVE, SUITE 2 BOZEMAN, MT 59715 BUILDING KEY E A 11/01/23 100% SCHEMATIC DESIGN - BLDG A 01/26/24 100% DESIGN DEVELOPMENT 05/10/24 100% CONSTRUCTION DOCUMENTS - P1 08/23/24 100% CONSTRUCTION DOCUMENTS - P2 Autodesk Docs://Nest Bozeman/Nest Bozeman–LFA–Arch–Main–R22.rvt1/13/2025 12:19:44 PM SITE PLAN - PHASE 2 G100.2 100% CONSTRUCTION DOCUMENTS-PHASE 2 DECEMBER 6, 2024 21043 SOAM WALLACE WORKS 801 N. WALLACE AVE BOZEMAN, MT SCALE:1/16" = 1'-0"1 SITE PLAN Copy 1 NORTH SITE PLAN KEYED NOTES 1 . HEATED SNOW-MELTING SLAB OVER TWO (2) INCHES OF EPS INSULATION AND GRAVEL BASE REVISIONS NO.DATE DESCRIPTION 1 TBD ADDENDUM #02.A 1 1 1 1