Loading...
HomeMy WebLinkAboutMSP1.7OnStreetParkingDiagram_11012024BIM FILE PATH: SHEET NO.: TITLE: copyright 2018 SMA, P.C. REVISIONS: KEYMAP: HHEELLEENNAA920 Front Street | Suite 101Helena | MT | 59601P| 406/442.4933www.architects-sma.com ARCHITECT SEAL: PROJECT: PROJECT LOCATION: PREPARED FOR: LOGO: CONSULTANT: PROJECT NUMBER: DDRRAAWWNN BBYY:: CCHHEECCKKEEDD BBYY:: TEAM: PHASE: DATE: PROJECT NUMBER:Plot Date:BBOOZZEEMMAANN109 East Oak Street | Suite 2EBozeman | MT | 59715P| 406/219.2216 www.architects-sma.com C:\Users\nicoles\Documents\2014 - Bealls Third Master Plan-R20_nicolesYZYN3.rvt 1/24/2021 4:21:53 PMMSP1.5 22001144 0011//2244//2211 OOPPEENN SSPPAACCEE PPLLAANN Author Checker NNOORRTTHH CCEENNTTRRAALL 22001144 MMSSPP NO. DATE REVISION DESCRIPTION BLOCK 4LOT 1A32,645 sf BLOCK 3LOT 4A11,812 sf BLOCK 3LOT 3A16,467 sf BLOCK 3LOT 2A18,042 sf BLOCK 3LOT 1A24,440 sf BLOCK 3LOT 5A25,222 sf WEST BEALL STREET NORTH TRACY AVEWEST VILLARD STREET NORTH WILLSON AVE14' ALLEYWEST LAMME STREETNORTH GRAND AVEBUILDING 3-3 BUILDING 3-2 BUILDING 3-1 THE IVES(BUILDING 4) BUILDING 3-5 BLOCK A, LOT 2A22,445 sf ONE 11 2.0 BUILDING HOTEL WEST (AKA MOUNTAINVIEW WEST)NORTH TRACY AVEWEST BEALL STREET NORTH WILLSON AVEWEST VILLARD STREET ONE 11 (EXISTING) HOTEL EAST(AKA MOUNTAINVIEW EAST) WEST LAMME STREET BLOCK B, LOT 1A(PROPOSED AGGREGATION)53,034 sf (1.217 ac) THE HENRY(BLDG 3-4) BLOCK A, LOT 3A25,024 sf PROFESSIONALENGINEERS &SURVEYORS NORTH CENTRALMASTER SITE PLANSTAHLYENGINEERING& ASSOCIATES WHIBOZEMAN, MONTANAC1.4 PHASE 4CIVILSITE PLAN PHASE 4 DESCRIPTION BUILDING 3-5 · · · · MSP1.7 ON STREET PARKING DIAGRAM 4P 3P 4P 2P 8P 6P 3P 5P 1P 3P 4P 1P 1P 1P 4P 24’ 8’ ON STREET PARKING KEYNOTE = 1P NUMBER OFSPACES 2P 2P